If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0014090411003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.00831,"lon":-111.1555,"icon":""}]} |
| Location: 00/11-04-001-09W4/3 | |
| Location Alias: 00/11-04-01-09 W4M | |
| Location Alias 2: 00/11-04-001-09 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 001 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 04 | |
| County/Municipality: County of Forty Mile No. 8 | |
| Well Name: PINE CLIFF ADEN 11-4-1-9 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0019797 | |
| License Date: 1960-10-03 | |
| License Status: Issued | |
| Spud Date: 1960-10-20 | |
| Final Drill Date: 1960-11-15 | |
| Well Total Depth: 1029.60 m | |
| Surface Hole Latitude: 49.008310 | |
| Surface Hole Longitude: -111.155500 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1960-10-03 | Obtained License |
| 1960-10-23 | Drill Stem Test Performed |
| 1960-10-25 | Drill Stem Test Performed |
| 1960-10-26 | Drill Stem Test Performed |
| 1960-10-27 | Lost Circulation Occurred |
| 1960-10-29 | Drill Stem Test Performed |
| 1960-10-31 | Drill Stem Test Performed |
| 1960-11-05 | Drill Stem Test Performed |
| 1960-11-06 | Drill Stem Test Performed |
| 1960-11-10 | Drill Stem Test Performed |
| 1960-11-15 | Drill Stem Test Performed |
| 1960-11-15 | Finished Drilling |
| 1960-11-16 | Production Casing Operation Performed |
| 1960-11-19 | Perforation Treatment Performed - Jet Perforation |
| 1960-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-10-04 | Perforation Treatment Performed - Jet Perforation |
| 1962-09-14 | Perforation Treatment Performed - Cement Squeeze |
| 1962-09-19 | Perforation Treatment Performed - Jet Perforation |
| 1962-09-22 | Well Mode changed to Drilled and Cased |
| 1964-02-07 | Well Began Production |
| 1964-02-07 | Well Fluid changed to Gas |
| 1964-02-07 | Well Mode changed to Flowing |
| 1987-02-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1987-02-03 | Plug Back Performed |
| 1987-02-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1987-02-04 | Perforation Treatment Performed - Jet Perforation |
| 1987-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1987-02-06 | Perforation Treatment Performed - Jet Perforation |
| 1987-02-06 | Plug Back Performed |
| 1987-02-06 | Well Fluid changed to Gas |
| 1987-02-06 | Well Mode changed to Abandoned Zone |
| 1987-02-07 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-11-19 | Perforation | 858.00 | 862.60 | 7 |
| 1987-02-04 | Perforation | 753.80 | 755.30 | 13 |
| 1987-02-06 | Packing Device Capped w/Cement | 737.00 | 745.00 | 0 |
| 1987-02-06 | Perforation | 680.30 | 685.80 | 13 |
| 1987-02-06 | Perforation | 677.90 | 679.10 | 13 |
| 1987-02-06 | Perforation | 674.20 | 676.00 | 13 |
| 1987-02-07 | Perforation | 655.30 | 657.50 | 13 |
| 1987-02-07 | Perforation | 651.70 | 653.20 | 13 |
| 1987-02-07 | Perforation | 643.30 | 644.60 | 13 |
| 1987-02-07 | Perforation | 634.60 | 636.40 | 13 |
| 1960-11-19 | Perforation | 868.70 | 871.70 | 7 |
| 1960-11-19 | Perforation | 880.90 | 885.40 | 7 |
| 1960-11-20 | Acid Treatment | 858.00 | 885.40 | 0 |
| 1961-10-04 | Perforation | 681.20 | 684.30 | 13 |
| 1962-09-14 | Cement Squeeze | 681.20 | 684.30 | 0 |
| 1962-09-19 | Perforation | 753.80 | 755.30 | 13 |
| 1987-02-03 | Packing Device Capped w/Cement | 822.00 | 830.00 | 0 |
| 1987-02-04 | Acid Wash | 753.80 | 755.30 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 1463 | 0.0 | 0.0 | 0.0 |
| 1969 | 6234 | 0.0 | 0.0 | 0.0 |
| 1970 | 7131 | 0.0 | 0.0 | 0.0 |
| 1971 | 7075 | 0.0 | 0.0 | 0.0 |
| 1972 | 8709 | 0.0 | 0.0 | 0.0 |
| 1973 | 7866 | 0.0 | 0.0 | 0.0 |
| 1974 | 7667 | 0.0 | 0.0 | 0.0 |
| 1975 | 4026 | 0.0 | 0.0 | 0.0 |
| 1976 | 4416 | 0.0 | 0.0 | 0.0 |
| 1977 | 7384 | 0.0 | 0.0 | 0.0 |
| 1978 | 3882 | 0.0 | 0.0 | 0.0 |
| 1979 | 8160 | 0.0 | 0.0 | 0.0 |
| 1980 | 5282 | 0.0 | 0.0 | 0.0 |
| 1981 | 3952 | 0.0 | 0.0 | 0.0 |
| 1983 | 3804 | 0.0 | 0.0 | 0.0 |
| 1984 | 8127 | 0.0 | 0.0 | 0.0 |
| 1985 | 7782 | 0.0 | 0.0 | 0.0 |
| 1986 | 7920 | 0.0 | 0.0 | 0.0 |
| 1987 | 734 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1960-10-27 | Lost Circulation | 832.10 | 972.30 |
For data sources see[6]