If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014081704002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.031338,"lon":-111.047562,"icon":""}]} |
Location: 00/04-17-001-08W4/2 | |
Location Alias: 00/04-17-01-08 W4M | |
Location Alias 2: 00/04-17-001-08 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 08 | |
Section: 17 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF ADEN 4-17-1-8 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0123494 | |
License Date: 1986-07-18 | |
License Status: Issued | |
Spud Date: 1986-07-20 | |
Final Drill Date: 1986-07-25 | |
Well Total Depth: 1045.00 m | |
Surface Hole Latitude: 49.031338 | |
Surface Hole Longitude: -111.047562 |
Date | Event |
---|---|
1986-07-18 | Obtained License |
1986-07-21 | Surface Casing Operation Performed |
1986-07-25 | Drill Stem Test Performed |
1986-07-25 | Finished Drilling |
1986-07-25 | Well Log Performed |
1986-07-26 | Production Casing Operation Performed |
1986-07-26 | Rig Released |
1986-08-25 | Perforation Treatment Performed - Jet Perforation |
1986-08-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-08-28 | Perforation Treatment Performed - Jet Perforation |
1986-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-09-02 | Perforation Treatment Performed - Jet Perforation |
1986-09-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-09-05 | Perforation Treatment Performed - Jet Perforation |
1986-09-15 | Well Mode changed to Drilled and Cased |
1988-01-11 | Well Began Production |
1988-01-11 | Well Fluid changed to Gas |
1988-01-11 | Well Mode changed to Flowing |
1995-11-01 | Well Fluid changed to Gas |
1995-11-01 | Well Mode changed to Suspended |
2002-09-02 | Well Fluid changed to Gas |
2002-09-02 | Well Mode changed to Flowing |
2003-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-06-03 | Perforation Treatment Performed - Jet Perforation |
2003-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-06-04 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-08-25 | Perforation | 991.00 | 994.00 | 13 |
1986-09-05 | Perforation | 823.00 | 825.00 | 13 |
2003-06-03 | Packing Device Capped w/Cement | 966.70 | 974.70 | 0 |
2003-06-03 | Perforation | 646.50 | 650.00 | 17 |
2003-06-03 | Perforation | 664.00 | 670.00 | 17 |
2003-06-03 | Perforation | 675.50 | 677.50 | 17 |
2003-06-04 | Packing Device Capped w/Cement | 947.00 | 955.00 | 0 |
1986-08-27 | Acid Treatment | 991.00 | 994.00 | 0 |
1986-08-28 | Perforation | 979.00 | 982.00 | 13 |
1986-08-29 | Acid Treatment | 979.00 | 982.00 | 0 |
1986-09-02 | Perforation | 963.00 | 964.50 | 13 |
1986-09-04 | Acid Treatment | 963.00 | 964.50 | 0 |
1986-09-05 | Perforation | 814.00 | 816.00 | 13 |
1986-09-05 | Perforation | 817.00 | 818.00 | 13 |
1986-09-05 | Perforation | 819.00 | 820.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 2225 | 0.0 | 0.0 | 0.0 |
1989 | 7495 | 0.0 | 0.0 | 0.0 |
1990 | 7342 | 0.0 | 0.0 | 0.0 |
1991 | 7090 | 0.0 | 0.0 | 0.0 |
1992 | 6339 | 0.0 | 0.0 | 0.0 |
1993 | 8042 | 0.0 | 0.0 | 0.0 |
1994 | 3330 | 0.0 | 0.0 | 0.0 |
2002 | 2629 | 0.0 | 0.0 | 0.0 |
2003 | 8117 | 0.0 | 0.0 | 0.0 |
2004 | 8354 | 0.0 | 0.0 | 0.0 |
2005 | 8519 | 0.0 | 0.0 | 0.0 |
2006 | 8720 | 0.0 | 0.0 | 0.0 |
2007 | 8142 | 0.0 | 0.0 | 0.0 |
2008 | 8731 | 0.0 | 0.0 | 0.0 |
2009 | 8299 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8548 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 6539 | 0.0 | 0.0 | 0.0 |
2014 | 6765 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8639 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]