If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014080813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.024952,"lon":-111.046819,"icon":""}]} |
Location: 00/13-08-001-08W4/0 | |
Location Alias: 00/13-08-01-08 W4M | |
Location Alias 2: 00/13-08-001-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 08 | |
Section: 08 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF ADEN 13-8-1-8 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0178164 | |
License Date: 1995-05-29 | |
License Status: Suspension | |
Spud Date: 1995-07-27 | |
Final Drill Date: 1995-07-31 | |
Well Total Depth: 1029.00 m | |
Surface Hole Latitude: 49.024952 | |
Surface Hole Longitude: -111.046819 |
Date | Event |
---|---|
1995-05-29 | Obtained License |
1995-07-28 | Surface Casing Operation Performed |
1995-07-31 | Finished Drilling |
1995-07-31 | Well Log Performed |
1995-07-31 | Well Mode changed to Drilled and Cased |
1995-08-01 | Production Casing Operation Performed |
1995-08-01 | Rig Released |
1995-08-19 | Perforation Treatment Performed - Jet Perforation |
1995-08-20 | Perforation Treatment Performed - Jet Perforation |
1995-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-11-03 | Perforation Treatment Performed - Jet Perforation |
1995-11-03 | Plug Back Performed |
1996-10-19 | Well Began Production |
1996-10-19 | Well Fluid changed to Gas |
1996-10-19 | Well Mode changed to Flowing |
2010-05-01 | Well Fluid changed to Gas |
2010-05-01 | Well Mode changed to Suspended |
2019-05-01 | Well Fluid changed to Gas |
2019-05-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-08-19 | Perforation | 992.80 | 993.80 | 13 |
1995-10-13 | Acid Treatment | 988.80 | 999.60 | 0 |
1995-11-03 | Packing Device Capped w/Cement | 975.00 | 983.00 | 0 |
1995-11-03 | Perforation | 967.00 | 970.00 | 13 |
1995-08-19 | Perforation | 994.50 | 995.50 | 13 |
1995-08-19 | Perforation | 996.80 | 997.80 | 13 |
1995-08-19 | Perforation | 998.60 | 999.60 | 13 |
1995-08-19 | Perforation | 1000.20 | 1001.20 | 13 |
1995-08-19 | Perforation | 1008.70 | 1009.70 | 13 |
1995-08-19 | Perforation | 1011.00 | 1011.70 | 13 |
1995-08-20 | Perforation | 988.80 | 989.80 | 13 |
1995-08-20 | Perforation | 990.50 | 991.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 1038 | 0.0 | 0.0 | 0.0 |
1997 | 4421 | 0.0 | 0.0 | 0.0 |
1998 | 6023 | 0.0 | 0.0 | 0.0 |
1999 | 8564 | 0.0 | 0.0 | 0.0 |
2000 | 8158 | 0.0 | 0.0 | 0.0 |
2001 | 7781 | 0.0 | 0.0 | 0.0 |
2002 | 4590 | 0.0 | 0.0 | 0.0 |
2003 | 6162 | 0.0 | 0.0 | 0.0 |
2004 | 7856 | 0.0 | 0.0 | 0.0 |
2005 | 7978 | 0.0 | 0.0 | 0.0 |
2006 | 5539 | 0.0 | 0.0 | 0.0 |
2007 | 5663 | 0.0 | 0.0 | 0.0 |
2008 | 7544 | 0.0 | 0.0 | 0.0 |
2009 | 720 | 0.0 | 0.0 | 0.0 |
2019 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]