If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-23904 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.702183384,"lon":-81.15133394,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne Township | |
Operator Name: PROFIT ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: HABER | |
License Status: Producing | |
License Date: 2004-10-08 | |
Spud Date: 2005-05-17 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2005-05-20 | |
Well Total Depth: 2500 ft | |
Configuration: Vertical | |
Latitude: 39.702183384 | |
Longitude: -81.15133394 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2004-10-08 | Proposed Formations:OIHO SHALE-GORDON, Issued Date:10/8/2004, Expired Date:10/8/2005 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-05-17 | RBDMS Rec |
Completed | 2005-05-20 | RBDMS Rec |
Reached Total Depth | 2005-05-20 | RBDMS Rec |
Construction Permit Expires | 2005-10-08 | RBDMS Rec |
Completion Report Received | 2006-01-26 | RBDMS Rec |
Record Last Modified | 2015-09-24 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-04-05 | 1876 | 1884 | 20 |
2006-04-05 | 2382 | 2402 | 8 |
2006-04-05 | 2132 | 2184 | 36 |
2006-04-05 | 2251 | 2328 | 36 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 79000 Gal | 0 | 500 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | PROFIT ENERGY COMPANY | 555 | 0 | 200 |
2006 | PROFIT ENERGY COMPANY | 2024 | 426 | 365 |
2007 | PROFIT ENERGY COMPANY | 2751 | 477 | 365 |
2008 | PROFIT ENERGY COMPANY | 2317 | 250 | 365 |
2009 | PROFIT ENERGY COMPANY | 1651 | 80 | 365 |
2010 | PROFIT ENERGY COMPANY | 2006 | 164 | 365 |
2011 | PROFIT ENERGY COMPANY | 1806 | 158 | 365 |
2012 | PROFIT ENERGY COMPANY | 1781 | 0 | 366 |
2013 | PROFIT ENERGY COMPANY | 1977 | 72 | 365 |
2014 | PROFIT ENERGY COMPANY | 1575 | 71 | 365 |
2015 | PROFIT ENERGY COMPANY | 1266 | 64 | 365 |
2016 | PROFIT ENERGY COMPANY | 1249 | 78 | 365 |
2017 | PROFIT ENERGY COMPANY | 1049 | 0 | 365 |
2018 | PROFIT ENERGY COMPANY | 842 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | PROFIT ENERGY COMPANY | Brine | 0 | 200 |
2006 | PROFIT ENERGY COMPANY | Brine | 70 | 365 |
2007 | PROFIT ENERGY COMPANY | Brine | 50 | 365 |
2008 | PROFIT ENERGY COMPANY | Brine | 50 | 365 |
2009 | PROFIT ENERGY COMPANY | Brine | 26 | 365 |
2010 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
2011 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
2012 | PROFIT ENERGY COMPANY | Brine | 44 | 366 |
2013 | PROFIT ENERGY COMPANY | Brine | 80 | 365 |
2014 | PROFIT ENERGY COMPANY | Brine | 17 | 365 |
2015 | PROFIT ENERGY COMPANY | Brine | 18 | 365 |
2016 | PROFIT ENERGY COMPANY | Brine | 3 | 365 |
2017 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
2018 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0541008339 | 2018-01-02 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing with the valve open, 2 inch diameter tubing with the valve open, and produced by means of a pumping unit with tubing, rods, and an electric motor. There is (1) 100 barrel steel stank, (1) 550 gallon polymer tank, drip tank, (2) domestic meters, and a vertical separator all contained within an earthen dike. The tank is properly identified and the production records are current. |
1132401226 | 2005-11-14 | Preliminary Restoration | No Violations | Restoration work at site satisfactory,well is equipped with pumping unit and 1-100bbl tank with dike in place. |
For data sources see[9]