If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 131-20147 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.625047,"lon":-75.937855,"icon":""}]} |
County: Wyoming | |
Municipality: Lemon Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Farm/Lease Name: GARRISON UNIT 1H | |
First Permit Date: 2011-03-25 | |
Last Permit Date: 2011-03-25 | |
Spud Date: 2011-04-01 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 8 | |
Latitude: 41.625047 | |
Longitude: -75.937855 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1956723 | 2011-03-11 | Violation(s) Noted | 606430 | |
1956723 | 2011-03-11 | Violation(s) Noted | 606431 | |
1956723 | 2011-03-11 | Violation(s) Noted | 606442 | |
1958644 | 2011-03-14 | No Violations Noted | ||
1964809 | 2011-04-11 | No Violations Noted | Ziggenfuss moved in 4/1/2011, drilled in conductor- no cement, then drilled to 517' Rig H&P 285 air drilling depth is 616', not drilling now - rig problems
20" cond @ 40' no cement 13 3/8" surf @ 495"(ground level) w/ 435 sx Cl A w/ 24 bbls returns 15.6 ppg (4/9/2011) Halliburton drillers log - not much water 1/2" stream water at 270' in grey sand and shale |
|
1964976 | 2011-04-11 | No Violations Noted | Will return to investigate standing water in ponds at the entrance to the pad. The water is black and is seperated by culvert. Pond on south side of culvert is draining into ground. | |
1965272 | 2011-04-13 | No Violations Noted | Collected sample from sediment trap and wetland area outside of pad. | |
1966404 | 2011-04-14 | No Violations Noted | BOP tested 4/13/2011
checked drillers log, discussed documenting daily BOP insp. in drillers log checked cellar - good water collection pool on left side of entrance- slight film on surface, Matt Shope took sample area of soil in far back corner of pad oil covered, size 5' x 15'(took picture), was dug up and cleaned up immediately 9 5/8" set @ 1823' w/ 625 sx Cl A w/ gasstop avg wt =15.4ppg 29 bbls returns (Halliburton) |
|
1967899 | 2011-04-25 | No Violations Noted | ||
1968294 | 2011-04-25 | No Violations Noted | H&P 285, checked drillers log, at 10072', TD will be 12774' | |
1969132 | 2011-04-26 | No Violations Noted | On site to review a copy of the PPC plan and conduct an inspection of the solids handling area. The PPC plan could not be located at the site. I obtained a copy of the PPC plan at a pre-construction meeting back in Feburary. I informed Rich Adams and Matt Barch of Chief of the revisons of the plan that need to be implemented. There were no violations observed during the inspection. | |
1969660 | 2011-05-02 | No Violations Noted | well is done - company man is not on site
cleaning up - taking down rig everything looks good |
|
1970791 | 2011-05-05 | Violation(s) Noted | 610311 | |
1970791 | 2011-05-05 | Violation(s) Noted | 610312 | |
1970847 | 2011-05-05 | No Violations Noted | done drilling on 4/28/2011 cemented on 4/29/2011
5 1/2" set @ 12722' with 1550 sx cement 900 sx varicem 15ppg and 650 sx acid sol. cement 15.6ppg top of cement @ 3478' cleaning up and moving rig, discussed need to suck up water off containment so nothing gets on ground Matt Shope on site checking e&s. |
|
1972748 | 2011-05-11 | Outstanding Violations - No Viols Req'd | ||
1975452 | 2011-05-22 | Outstanding Violations - Viols Req'd | Results for the Oil & Grease sample collected on 5/5/2011 indicated a positive detection of Oil & Grease in the water (8.1 mg/L). | 611872 |
1975452 | 2011-05-22 | Outstanding Violations - Viols Req'd | Results for the Oil & Grease sample collected on 5/5/2011 indicated a positive detection of Oil & Grease in the water (8.1 mg/L). | 612403 |
1976387 | 2011-05-26 | No Violations Noted | site & well looks good - very little water in cellar Chief released rig | |
1977008 | 2011-06-01 | No Violations Noted | Outlet to sediment trap at entrance has been modified. Water had been removed. Outlet is dry and appears to be draining sufficiently. | |
1979731 | 2011-06-13 | No Violations Noted | ||
1980320 | 2011-06-13 | No Violations Noted | preparing to frac - weel head and lots of frac tanks, site looks good | |
1985130 | 2011-07-01 | No Violations Noted | IPS - integrated production services trucks on site, no comp. man, fracing | |
1986266 | 2011-07-07 | No Violations Noted | ||
1994470 | 2011-08-09 | No Violations Noted | Well fraced on Sat and Sun (8/6 & 8/7/2011).
2 stage frac, were planning 4, but changed to 2. Flowing back water now, no gas or flareing yet. Plastic containment still all in place. Tanks still on site. Piles of sand on containment. Flow back tanks on containment. |
|
1995320 | 2011-08-12 | No Violations Noted | Done flowing back after frac, plastic containment, tanks, and some equip. still on site.
9 5/8" X 5 1/2" annulus - 400 psi, 5 1/2" prod - 2700 psi |
|
2004561 | 2011-09-22 | No Violations Noted | Tanks still on site, as well as a dumpster and some sand.
Well vents go to a 550 gal tank. Site looks good. |
|
2030254 | 2011-12-27 | Violation(s) Noted | Erosion control blankets were installed during a seperate inspection on 12/29/11. The area being blanketed was an area used for staging and parking vehicles and was not the area near the gate which has the significant erosion problems. Further blanketing was to be employed at the area near the gate for temporary stabilization until the area can be corrected in the Spring. | 628115 |
2031097 | 2011-12-29 | No Violations Noted | A reading of 4 psi after 20 minutes on the 5 x 9 annulus. The well was shut-in for 24 hour monitoring. | |
2031102 | 2011-12-30 | No Violations Noted | A reading of 84 psi on the 5 x 9 annulus and 3.5 on the 9 x 13 after 24 hour shut-in. | |
2031935 | 2011-12-29 | No Violations Noted | DEP Reps - Ryan Klemish, Matt Shope, (Eric Rooney arrived late) met with Chief reps. Rich Adams, Ralph Larsen, and Jon Hafer.Arrived at 10:35 AM. There are 2 annulus' - not shut in. Installed 100 psi pressure guages. After 20 min., the 5 1/2" x 9 5/8" has 3 psi and the 9 5/8" x 13 3/8"? has 0 psi. After 1 hr 17 min, the 5 1/2" x 9 5/8" has 10 psi and ?9 5/8" x 13 3/8"? has o psi. Chief took an isotopic sample.
NOTE: Matt Shope returned to site the following day to collect 24 hr shut in pressures: 5 1/2" x9 5/8" 80 psi and ?9 5/8" x 13 3/8" ? 3 psi |
|
2031572 | 2012-01-05 | No Violations Noted | Reviewed E & S Inspection Reports for 10/25 thru 11/14/2011. Reports adequately meet requirements of permit conditions. | |
2035641 | 2012-01-20 | No Violations Noted | ||
2036680 | 2012-01-24 | No Violations Noted | Response to NOV for Inspection ID: 2030254 | |
2109049 | 2012-10-16 | No Violations Noted | Producing well. No barriers around well head.
2581 psi on prod. Cellar is filled in with gravel. 2 annular vents are piped to tank. Plastic containment on site - For what? |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 2064665.0 | 153.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 930.8 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2011-1 | DRILLING FLUID WASTE | 480.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 | PATRIOT WATER TREATMENT | WARREN | OH |
2011-1 | FRACING FLUID WASTE | 780.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 | SUNBURY GENERATION WASTE WATER TRMT FAC | SHAMOKIN DAM | PA |
2011-1 | DRILL CUTTINGS | 19.11 | Tons | LANDFILL | 100955 | WAYNE TOWNSHIP LANDFILL (CLINTON COUNTY) | MC ELHATTAN | PA |
2011-1 | DRILL CUTTINGS | 960.39 | Tons | LANDFILL | 301626 | WHITE PINES LANDFILL | MILLVILLE | PA |
2011-2 | FRACING FLUID WASTE | 7773.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2011-2 | DRILL CUTTINGS | 15.82 | Tons | LANDFILL | 301626 | WHITE PINES LANDFILL | MILLVILLE | PA |
2012-1 | FRACING FLUID WASTE | 6364.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |