| Well ID: 37-131-20147
 
| Well ID: 37-131-20147
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.625047, -75.937855 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.625047, -75.937856 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Wyoming County, Pennsylvania|Wyoming]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Lemon Township, Wyoming County, Pennsylvania|Lemon Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Wyoming_County,_Pennsylvania|Wyoming]]
 +
|-
 +
| Municipality: [[Lemon Township,_Wyoming_County,_Pennsylvania|Lemon Township]]
 
|-
 
|-
 
| Operator Name: [[CHIEF OIL & GAS LLC]]
 
| Operator Name: [[CHIEF OIL & GAS LLC]]
 
|-
 
|-
| Well Pad ID: [[145704|145704]]
+
| Well Pad ID: [[145704]]
 
|-
 
|-
 
| Farm/Lease Name: GARRISON UNIT 1H
 
| Farm/Lease Name: GARRISON UNIT 1H
 
|-
 
|-
| First Permit Date: 2011-03-25
+
| License Status: Active
 
|-
 
|-
| Last Permit Date: 2011-03-25
+
| Spud Date: 04/01/2011
 
|-
 
|-
| Spud Date: 2011-04-01
+
| Permit Date: 3/25/2011
 
|-
 
|-
| Unconventional: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Horizontal: Yes
+
| Configuration: Horizontal Well
|-
 
| Well Status: ACTIVE
 
|-
 
| Violations: 8
 
 
|-
 
|-
 
| Latitude: 41.625047
 
| Latitude: 41.625047
 
|-
 
|-
| Longitude: -75.937855
+
| Longitude: -75.937856
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2011-1
+
| 2011
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 2,064,665.00
 +
| style="text-align: right;" | 153
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2013
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 3,705,497.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 361
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 746,948.00
 +
| style="text-align: right;" | 218
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2015
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 992,329.35
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 804,783.09
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2017
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 487,149.46
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 589,074.21
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2019
| style="text-align:right;" | 2064665.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 153.0
+
| style="text-align: right;" | 78,404.61
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 84
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2013-1
 
| style="text-align:right;" | 2343327.0
 
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-2
 
| style="text-align:right;" | 1362170.0
 
| style="text-align:right;" | 180.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-1
 
| style="text-align:right;" | 207374.0
 
| style="text-align:right;" | 34.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 539574.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 74062.62
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 98404.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 92768.13
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-1
+
| 2011-S01
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 19.11
+
| style="text-align: right;" | 19.11 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
| WAYNE TOWNSHIP LANDFILL
 
| MC ELHATTAN
 
| PA
 
 
|-
 
|-
|-
+
| 2011-S01
| 2011-1
+
| Drill Cuttings (in Tons)
| DRILL CUTTINGS
+
| style="text-align: right;" | 960.39 Tons
| style="text-align:right;" | 960.39
 
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 301626
 
| 301626
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| PA
 
 
|-
 
|-
|-
+
| 2011-S01
| 2011-1
+
| Drilling Fluid Waste (in Barrels)
| DRILLING FLUID WASTE
+
| style="text-align: right;" | 480.00 Bbl
| style="text-align:right;" | 480.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| EPA ID: 748-163
 
| EPA ID: 748-163
| PATRIOT WATER TREATMENT
 
| WARREN
 
| OH
 
 
|-
 
|-
|-
+
| 2011-S01
| 2011-1
+
| Fracing Fluid Waste (in Barrels)
| FRACING FLUID WASTE
+
| style="text-align: right;" | 780.00 Bbl
| style="text-align:right;" | 780.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0008451
 
| PA0008451
| SUNBURY GENERATION WASTE WATER TRMT FAC
 
| SHAMOKIN DAM
 
| PA
 
 
|-
 
|-
|-
+
| 2011-S02
| 2011-2
+
| Drill Cuttings (in Tons)
| DRILL CUTTINGS
+
| style="text-align: right;" | 15.82 Tons
| style="text-align:right;" | 15.82
 
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 301626
 
| 301626
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| PA
 
 
|-
 
|-
 +
| 2011-S02
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 7,773.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2011-2
+
| 2012-S01
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 7.0
+
| style="text-align: right;" | 6,364.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| FRAC WATER REUSE
+
|-
 +
| 2012-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 930.80 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2013-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 874.40 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2012-1
+
| 2013-S02
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 544.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
 +
| 2014-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 169.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 2,097.19 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2015-S01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,260.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 
|-
 
|-
| 2012-2
+
| 2015-S01
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 930.8
+
| style="text-align: right;" | 377.69 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
 
|  
 
|  
 
|-
 
|-
|-
+
| 2015-S02
| 2013-1
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 247.80 Bbl
| style="text-align:right;" | 874.4
 
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
 
|  
 
|  
 
|-
 
|-
|-
+
| 2016-S01
| 2013-2
+
| Produced Fluid (in Barrels) RWC 802
| PRODUCED FLUID
+
| style="text-align: right;" | 278.88 Bbl
| style="text-align:right;" | 544.0
 
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
 
|-
 
|-
|-
+
| 2016-S02
| 2014-1
+
| Produced Fluid (in Barrels) RWC 802
| PRODUCED FLUID
+
| style="text-align: right;" | 203.12 Bbl
| style="text-align:right;" | 169.0
 
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2017-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 29.36 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2017-M05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 24.29 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2017-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 21.38 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-2
+
| 2018-M01
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 29.80 Bbl
| Bbl
+
| REUSE (AT WELL PAD)
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2018-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 27.46 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2018-M10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 25.95 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
|-
 
| 1956723
 
| 2011-03-11
 
| Violation(s) Noted
 
|
 
| 606430
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
|
 
|-
 
|-
 
| 1956723
 
| 2011-03-11
 
| Violation(s) Noted
 
|
 
| 606431
 
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 
|
 
|-
 
 
|-
 
|-
 
| 1956723
 
| 1956723
| 2011-03-11
+
| Primary Facility
 +
| 03/11/2011
 +
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
|
 
| 606442
 
| 102.4INADPLN - E&S Plan not adequate
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1958644
 
| 1958644
| 2011-03-14
+
| Primary Facility
 +
| 03/14/2011
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1964809
 
| 1964809
| 2011-04-11
+
| Primary Facility
 +
| 04/11/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Ziggenfuss moved in 4/1/2011, drilled in conductor- no cement, then drilled to 517'            Rig  H&P 285 air drilling  depth is 616',  not drilling now - rig problems
 
| Ziggenfuss moved in 4/1/2011, drilled in conductor- no cement, then drilled to 517'            Rig  H&P 285 air drilling  depth is 616',  not drilling now - rig problems
    20" cond @ 40'  no cement
 
    13 3/8" surf @ 495"(ground level) w/ 435 sx Cl A  w/ 24 bbls returns    15.6 ppg  (4/9/2011) Halliburton
 
drillers log - not much water  1/2" stream water at 270'  in grey sand and shale
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1964976
 
| 1964976
| 2011-04-11
+
| Primary Facility
 +
| 04/11/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Will return to investigate standing water in ponds at the entrance to the pad.  The water is black and is seperated by culvert.  Pond on south side of culvert is draining into ground.
 
| Will return to investigate standing water in ponds at the entrance to the pad.  The water is black and is seperated by culvert.  Pond on south side of culvert is draining into ground.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1965272
 
| 1965272
| 2011-04-13
+
| Primary Facility
 +
| 04/13/2011
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Collected sample from sediment trap and wetland area outside of pad.
 
| Collected sample from sediment trap and wetland area outside of pad.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1966404
 
| 1966404
| 2011-04-14
+
| Primary Facility
 +
| 04/14/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| BOP tested 4/13/2011
 
| BOP tested 4/13/2011
checked drillers log,  discussed documenting daily BOP insp. in drillers log
 
checked cellar - good
 
water collection pool on left side of entrance- slight film on surface, Matt Shope took sample
 
area of soil in far back corner of pad oil covered, size 5' x 15'(took picture), was dug up and cleaned up immediately 
 
9 5/8" set @ 1823' w/ 625 sx Cl A w/ gasstop    avg wt =15.4ppg  29 bbls returns (Halliburton)
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1967899
 
| 1967899
| 2011-04-25
+
| Primary Facility
 +
| 04/25/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1968294
 
| 1968294
| 2011-04-25
+
| Primary Facility
 +
| 04/25/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| H&P 285, checked drillers log, at 10072',  TD will be 12774'
 
| H&P 285, checked drillers log, at 10072',  TD will be 12774'
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1969132
 
| 1969132
| 2011-04-26
+
| Primary Facility
 +
| 04/26/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On site to review a copy of the PPC plan and conduct an inspection of the solids handling area.  The PPC plan could not be located at the site.  I obtained a copy of the PPC plan at a pre-construction meeting back in Feburary.  I informed Rich Adams and Matt Barch of Chief of the revisons of the plan that need to be implemented.  There were no violations observed during the inspection.
 
| On site to review a copy of the PPC plan and conduct an inspection of the solids handling area.  The PPC plan could not be located at the site.  I obtained a copy of the PPC plan at a pre-construction meeting back in Feburary.  I informed Rich Adams and Matt Barch of Chief of the revisons of the plan that need to be implemented.  There were no violations observed during the inspection.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1969660
 
| 1969660
| 2011-05-02
+
| Primary Facility
 +
| 05/02/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| well is done - company man is not on site
 
| well is done - company man is not on site
cleaning up - taking down rig
 
everything looks good
 
|
 
|
 
|
 
|-
 
|-
 
| 1970791
 
| 2011-05-05
 
| Violation(s) Noted
 
|
 
| 610311
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
|
 
|-
 
 
|-
 
|-
 
| 1970791
 
| 1970791
| 2011-05-05
+
| Primary Facility
 +
| 05/05/2011
 +
| Complaint Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
|  
 
|  
| 610312
 
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 
|
 
|-
 
 
|-
 
|-
 
| 1970847
 
| 1970847
| 2011-05-05
+
| Primary Facility
 +
| 05/05/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| done drilling on 4/28/2011                                                                                                                  cemented on 4/29/2011  
+
| done drilling on 4/28/2011                                                                                                                  cemented on 4/29/2011
5 1/2" set @ 12722' with 1550 sx cement
 
                      900 sx varicem  15ppg  and 650 sx acid sol. cement  15.6ppg
 
top of cement @ 3478'
 
cleaning up and moving rig,  discussed need to suck up water off containment so nothing gets on ground
 
Matt Shope on site checking e&s.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1972748
 
| 1972748
| 2011-05-11
+
| Primary Facility
 +
| 05/11/2011
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
|  
 
|  
|
 
|
 
|
 
|-
 
|-
 
| 1975452
 
| 2011-05-22
 
| Outstanding Violations - Viols Req'd
 
| Results for the Oil & Grease sample collected on 5/5/2011 indicated a positive detection of Oil & Grease in the water (8.1 mg/L).
 
| 611872
 
| 78.66A - Failure to report release of substance threatening or causing pollution
 
|
 
|-
 
 
|-
 
|-
 
| 1975452
 
| 1975452
| 2011-05-22
+
| Primary Facility
 +
| 05/22/2011
 +
| Follow-up Inspection
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
 
| Results for the Oil & Grease sample collected on 5/5/2011 indicated a positive detection of Oil & Grease in the water (8.1 mg/L).
 
| Results for the Oil & Grease sample collected on 5/5/2011 indicated a positive detection of Oil & Grease in the water (8.1 mg/L).
| 612403
 
| 401CSL - Discharge of pollultional material to waters of Commonwealth.
 
|
 
|-
 
 
|-
 
|-
 
| 1976387
 
| 1976387
| 2011-05-26
+
| Primary Facility
 +
| 05/26/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| site & well looks good - very little water in cellar    Chief released rig
 
| site & well looks good - very little water in cellar    Chief released rig
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1977008
 
| 1977008
| 2011-06-01
+
| Primary Facility
 +
| 06/01/2011
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Outlet to sediment trap at entrance has been modified.  Water had been removed.  Outlet is dry and appears to be draining sufficiently.
 
| Outlet to sediment trap at entrance has been modified.  Water had been removed.  Outlet is dry and appears to be draining sufficiently.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1979731
 
| 1979731
| 2011-06-13
+
| Primary Facility
 +
| 06/13/2011
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1980320
 
| 1980320
| 2011-06-13
+
| Primary Facility
 +
| 06/13/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| preparing to frac - weel head and lots of frac tanks,  site looks good
 
| preparing to frac - weel head and lots of frac tanks,  site looks good
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1985130
 
| 1985130
| 2011-07-01
+
| Primary Facility
 +
| 07/01/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| IPS - integrated production services trucks on site,  no comp. man,  fracing
 
| IPS - integrated production services trucks on site,  no comp. man,  fracing
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1986266
 
| 1986266
| 2011-07-07
+
| Primary Facility
 +
| 07/07/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1994470
 
| 1994470
| 2011-08-09
+
| Primary Facility
 +
| 08/09/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Well fraced on Sat and Sun (8/6 & 8/7/2011).
 
| Well fraced on Sat and Sun (8/6 & 8/7/2011).
2 stage frac, were planning 4, but changed to 2.
 
Flowing back water now, no gas or flareing yet.
 
Plastic containment still all in place.  Tanks still on site.  Piles of sand on containment.  Flow back tanks on containment.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1995320
 
| 1995320
| 2011-08-12
+
| Primary Facility
 +
| 08/12/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Done flowing back after frac, plastic containment, tanks, and some equip. still on site.
 
| Done flowing back after frac, plastic containment, tanks, and some equip. still on site.
9 5/8" X 5 1/2" annulus - 400 psi, 5 1/2" prod - 2700 psi
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2004561
 
| 2004561
| 2011-09-22
+
| Primary Facility
 +
| 09/22/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Tanks still on site, as well as a dumpster and some sand.
 
| Tanks still on site, as well as a dumpster and some sand.
Well vents go to a 550 gal tank.
 
Site looks good.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2030254
 
| 2030254
| 2011-12-27
+
| Primary Facility
 +
| 12/27/2011
 +
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| Erosion control blankets were installed during a seperate inspection on 12/29/11.  The area being blanketed was an area used for staging and parking vehicles and was not the area near the gate which has the significant erosion problems.  Further blanketing was to be employed at the area near the gate for temporary stabilization until the area can be corrected in the Spring.
 
| Erosion control blankets were installed during a seperate inspection on 12/29/11.  The area being blanketed was an area used for staging and parking vehicles and was not the area near the gate which has the significant erosion problems.  Further blanketing was to be employed at the area near the gate for temporary stabilization until the area can be corrected in the Spring.
| 628115
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Erosion caused by vehicular traffic near gate to pad.  Area was noted in an inspection on 7/7/11 and was not addressed.  Area is noted in the operator's E & S Inspection Reports as "unsatisfactory".
 
|-
 
 
|-
 
|-
 
| 2031097
 
| 2031097
| 2011-12-29
+
| Primary Facility
 +
| 12/29/2011
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| A reading of 4 psi after 20 minutes on the 5 x 9 annulus.  The well was shut-in for 24 hour monitoring.
 
| A reading of 4 psi after 20 minutes on the 5 x 9 annulus.  The well was shut-in for 24 hour monitoring.
 +
|-
 +
| 2031102
 +
| Primary Facility
 +
| 12/30/2011
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| A reading of 84 psi on the 5 x 9 annulus and 3.5 on the 9 x 13 after 24 hour shut-in.
 +
|-
 +
| 2031572
 +
| Primary Facility
 +
| 01/05/2012
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| Reviewed E & S Inspection Reports for 10/25 thru 11/14/2011.  Reports adequately meet requirements of permit conditions.
 +
|-
 +
| 2031935
 +
| Primary Facility
 +
| 12/29/2011
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| DEP Reps - Ryan Klemish, Matt Shope, (Eric Rooney arrived late) met with Chief reps. Rich Adams, Ralph Larsen, and Jon Hafer.Arrived at 10:35 AM. There are 2 annulus' - not shut in. Installed 100 psi pressure guages.  After 20 min., the 5 1/2" x 9 5/8" has 3 psi and the 9 5/8" x 13 3/8"? has 0 psi.  After 1 hr 17 min, the 5 1/2" x 9 5/8" has 10 psi and ?9 5/8" x 13 3/8"? has o psi.  Chief took an isotopic sample.
 +
|-
 +
| 2035641
 +
| Primary Facility
 +
| 01/20/2012
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2036680
 +
| Primary Facility
 +
| 01/24/2012
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| Response to NOV for Inspection ID:  2030254
 +
|-
 +
| 2109049
 +
| Primary Facility
 +
| 10/16/2012
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| Producing well.  No barriers around well head.
 +
|-
 +
| 2181691
 +
| Primary Facility
 +
| 07/09/2013
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2505878
 +
| Primary Facility
 +
| 2016-07-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2546002
 +
| Primary Facility
 +
| 2016-12-19
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
| 2713312
 +
| Primary Facility
 +
| 2018-03-28
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Arrived at site at: 08:30. Weather: Overcast, cold ~ 35 degs. Onsite to perform routine inspections of wells on pad. A total of (9) wells were present on pad. All (9) wells were in production at time of inspection. All wells Prod. tree top press. "PTTP", Prod. line press. "PLP" and Prod. casing press. "PCP" were being monitored by wireless data sending units and/or analog gauges. (See individual well pressures and observations listed below.)
 +
- All wells had (2) annular vents present labeled (13 3/8"x 9  5/8") and (9 5/8"x 5 1/2"). All annular vents were open and venting to (3) poly vent tanks "VTs" via shared 2" vent lines. I labeled the VTs with a black magic marker at time of inspection. (#1 VT shares the 2H, 5H, 3H & N1H annular vents. #2 VT shares the N4H, N2H & N3H annular vents. #3 VT shares the 1H & 4H annular vents.) I performed gas checks at VT lid openings using a Altair 5X gas meter calibrated on 3/5/18. Gas checks showed: VT #1 = 48% LEL, 2% CH4; VT #2 = 10% LEL, 0% CH4; VT #3 = 40% LEL, 2% CH4.
 +
|-
 +
| 2743686
 +
| Primary Facility
 +
| 2018-06-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| "Pump-down" operations were being conducted by Halliburton Oilfield Services on the 1H well. There were no violations noted. If you have any questions, please contact me.
 
|-
 
|-
| 2031102
+
| 2804612
| 2011-12-30
+
| Primary Facility
 +
| 2018-11-14
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| A reading of 84 psi on the 5 x 9 annulus and 3.5 on the 9 x 13 after 24 hour shut-in.
+
| Chief Oil & Gas submitted a Notice of Termination (NOT) for the Garrison pad covered under ESX29-131-17-0003. The NOT was received by the Department on 9/27/18. Arrived onsite for at 10:35; the weather was ~30°F and calm. Several frozen puddles were on the pad surface.
 +
 
 +
There were 9 properly tagged Marcellus wells staged for production. Most of the well cellars were filled with water; no bubbling was observed. There were 9 GPUs and 1 compressor onsite and in secondary containment. There was approx. 6 to 12 inches of mostly frozen water in the produced water tank secondary containment. Secondary containment also remained around the wells. I contacted Chris Vassallo via email and was informed on 11/16/18 that the containment is there due to scheduled maintenance on one of the wells.
 +
 
 +
The site was well vegetated and appeared stable. All PCSM had been constructed and no temporary E&S  BMPs remained.
 +
 
 +
It is recommended that secondary containment around the produced water tanks be monitored and the water removed a
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 1956723
 +
| 606430
 +
| 03/11/2011
 +
| 03/14/2011
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
| 1956723
 +
| 606431
 +
| 03/11/2011
 +
| 03/14/2011
 +
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 +
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
| 1956723
 +
| 606442
 +
| 03/11/2011
 +
| 03/14/2011
 +
| 102.4INADPLN - E&S Plan not adequate
 +
| Administrative
 
|  
 
|  
 
|-
 
|-
 +
| 1970791
 +
| 610311
 +
| 05/05/2011
 +
| 06/01/2011
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
| Environmental Health & Safety
 +
|
 
|-
 
|-
| 2031935
+
| 1970791
| 2011-12-29
+
| 610312
| No Violations Noted
+
| 05/05/2011
| DEP Reps - Ryan Klemish, Matt Shope, (Eric Rooney arrived late) met with Chief reps. Rich Adams, Ralph Larsen, and Jon Hafer.Arrived at 10:35 AM. There are 2 annulus' - not shut in. Installed 100 psi pressure guages.  After 20 min., the 5 1/2" x 9 5/8" has 3 psi and the 9 5/8" x 13 3/8"? has 0 psi.  After 1 hr 17 min, the 5 1/2" x 9 5/8" has 10 psi and ?9 5/8" x 13 3/8"? has o psi.  Chief took an isotopic sample.
+
| 06/01/2011
NOTE:  Matt Shope returned to site the following day to collect 24 hr shut in pressures:       
+
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
    5 1/2" x9 5/8"  80 psi and  ?9 5/8" x 13 3/8" ?  3 psi
+
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
| 1975452
 +
| 611872
 +
| 05/22/2011
 +
| 06/13/2011
 +
| 78.66A - Failure to report release of substance threatening or causing pollution
 +
| Administrative
 
|  
 
|  
 +
|-
 +
| 1975452
 +
| 612403
 +
| 05/22/2011
 +
| 06/13/2011
 +
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 +
| Environmental Health & Safety
 
|  
 
|  
 
|-
 
|-
 +
| 2030254
 +
| 628115
 +
| 12/27/2011
 +
| 01/20/2012
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
| Environmental Health & Safety
 +
| Erosion caused by vehicular traffic near gate to pad.  Area was noted in an inspection on 7/7/11 and was not addressed.  Area is noted in the operator's E & S Inspection Reports as "unsatisfactory".
 +
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2031572
+
| 628115
| 2012-01-05
+
| 278937
| No Violations Noted
+
| NOV - Notice of Violation
| Reviewed E & S Inspection Reports for 10/25 thru 11/14/2011.  Reports adequately meet requirements of permit conditions.
 
 
|  
 
|  
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
| 1
 +
| 08/07/2011
 +
| 08/07/2011
 +
| style="text-align: right;" | 7858.00
 +
| style="text-align: right;" | 1,020,138.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="20"| 1
 +
| rowspan="5"| Super Scale Control TSC
 +
| rowspan="5"| Superior Well Services
 +
| rowspan="5"| Scale Inhibitor
 +
| 1,2,4-Butanetricarboxylic acid, 2-phosphono-
 +
| 37971-36-1
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2035641
 
| 2012-01-20
 
| No Violations Noted
 
|
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Anionic Copolymer
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.04
 +
| style="text-align: right;" |
 
|-
 
|-
| 2036680
+
| Anionic Polymer
| 2012-01-24
 
| No Violations Noted
 
| Response to NOV for Inspection ID:  2030254
 
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Sand (Proppant)
 +
| rowspan="2"| Superior Well Services
 +
| rowspan="2"| Propping Agent
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 99.90
 +
| style="text-align: right;" | 10.38
 +
| style="text-align: right;" |
 
|-
 
|-
| 2109049
+
|- valign="top"
| 2012-10-16
+
| rowspan="1"| Water
| No Violations Noted
+
| rowspan="1"|
| Producing well.  No barriers around well head.
+
| rowspan="1"| Base Fluid
2581 psi on prod.
+
| Water
Cellar is filled in with gravel.
 
2 annular vents are piped to tank.
 
Plastic containment on site - For what?
 
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 89.37
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="5"| KR-153SL
 +
| rowspan="5"| Superior Well Services
 +
| rowspan="5"| Biocide
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Polyethylene glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Diethylene glycol
 +
| 111-46-6
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 20.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 
|-
 
|-
| 2181691
+
|- valign="top"
| 2013-07-09
+
| rowspan="5"| WFR-3B
| No Violations Noted
+
| rowspan="5"| Superior Well Services
 +
| rowspan="5"| Friction Reducer
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.15
 +
| style="text-align: right;" |
 +
|-
 +
| Ethoxylated C12-16 alcohols
 +
| 68551-12-2
 +
| style="text-align: right;" | 4.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Stoddard solvent
 +
| 8052-41-3
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 25.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| FE OXCLEAR
 +
| rowspan="2"| Superior Well Services
 +
| rowspan="2"| Oxygen Scavenger
 +
| Ammonium bisulfite
 +
| 10192-30-0
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 02:20, 18 July 2019

Well Details

Well ID: 37-131-20147
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Lemon Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 145704
Farm/Lease Name: GARRISON UNIT 1H
License Status: Active
Spud Date: 04/01/2011
Permit Date: 3/25/2011
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.625047
Longitude: -75.937856

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 2,064,665.00 153 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 3,705,497.00 361 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 746,948.00 218 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 992,329.35 364 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 804,783.09 363 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 487,149.46 365 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 589,074.21 365 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 78,404.61 84 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S01 Drill Cuttings (in Tons) 19.11 Tons LANDFILL 100955
2011-S01 Drill Cuttings (in Tons) 960.39 Tons LANDFILL 301626
2011-S01 Drilling Fluid Waste (in Barrels) 480.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011-S01 Fracing Fluid Waste (in Barrels) 780.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011-S02 Drill Cuttings (in Tons) 15.82 Tons LANDFILL 301626
2011-S02 Fracing Fluid Waste (in Barrels) 7,773.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Fracing Fluid Waste (in Barrels) 6,364.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 930.80 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 874.40 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 544.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 169.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 2,097.19 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Fracing Fluid Waste (in Barrels) 1,260.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-S01 Produced Fluid (in Barrels) 377.69 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 247.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 278.88 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 203.12 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 29.36 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 24.29 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 21.38 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 29.80 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 27.46 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 25.95 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1956723 Primary Facility 03/11/2011 Routine/Complete Inspection Violation(s) Noted
1958644 Primary Facility 03/14/2011 Follow-up Inspection No Violations Noted
1964809 Primary Facility 04/11/2011 Drilling/Alteration No Violations Noted Ziggenfuss moved in 4/1/2011, drilled in conductor- no cement, then drilled to 517' Rig H&P 285 air drilling depth is 616', not drilling now - rig problems
1964976 Primary Facility 04/11/2011 Routine/Complete Inspection No Violations Noted Will return to investigate standing water in ponds at the entrance to the pad. The water is black and is seperated by culvert. Pond on south side of culvert is draining into ground.
1965272 Primary Facility 04/13/2011 Follow-up Inspection No Violations Noted Collected sample from sediment trap and wetland area outside of pad.
1966404 Primary Facility 04/14/2011 Drilling/Alteration No Violations Noted BOP tested 4/13/2011
1967899 Primary Facility 04/25/2011 Routine/Complete Inspection No Violations Noted
1968294 Primary Facility 04/25/2011 Drilling/Alteration No Violations Noted H&P 285, checked drillers log, at 10072', TD will be 12774'
1969132 Primary Facility 04/26/2011 Routine/Complete Inspection No Violations Noted On site to review a copy of the PPC plan and conduct an inspection of the solids handling area. The PPC plan could not be located at the site. I obtained a copy of the PPC plan at a pre-construction meeting back in Feburary. I informed Rich Adams and Matt Barch of Chief of the revisons of the plan that need to be implemented. There were no violations observed during the inspection.
1969660 Primary Facility 05/02/2011 Drilling/Alteration No Violations Noted well is done - company man is not on site
1970791 Primary Facility 05/05/2011 Complaint Inspection Violation(s) Noted
1970847 Primary Facility 05/05/2011 Drilling/Alteration No Violations Noted done drilling on 4/28/2011 cemented on 4/29/2011
1972748 Primary Facility 05/11/2011 Follow-up Inspection Outstanding Violations - No Viols Req'd
1975452 Primary Facility 05/22/2011 Follow-up Inspection Outstanding Violations - Viols Req'd Results for the Oil & Grease sample collected on 5/5/2011 indicated a positive detection of Oil & Grease in the water (8.1 mg/L).
1976387 Primary Facility 05/26/2011 Routine/Complete Inspection No Violations Noted site & well looks good - very little water in cellar Chief released rig
1977008 Primary Facility 06/01/2011 Follow-up Inspection No Violations Noted Outlet to sediment trap at entrance has been modified. Water had been removed. Outlet is dry and appears to be draining sufficiently.
1979731 Primary Facility 06/13/2011 Follow-up Inspection No Violations Noted
1980320 Primary Facility 06/13/2011 Routine/Complete Inspection No Violations Noted preparing to frac - weel head and lots of frac tanks, site looks good
1985130 Primary Facility 07/01/2011 Drilling/Alteration No Violations Noted IPS - integrated production services trucks on site, no comp. man, fracing
1986266 Primary Facility 07/07/2011 Routine/Complete Inspection No Violations Noted
1994470 Primary Facility 08/09/2011 Drilling/Alteration No Violations Noted Well fraced on Sat and Sun (8/6 & 8/7/2011).
1995320 Primary Facility 08/12/2011 Routine/Complete Inspection No Violations Noted Done flowing back after frac, plastic containment, tanks, and some equip. still on site.
2004561 Primary Facility 09/22/2011 Routine/Complete Inspection No Violations Noted Tanks still on site, as well as a dumpster and some sand.
2030254 Primary Facility 12/27/2011 Routine/Complete Inspection Violation(s) Noted Erosion control blankets were installed during a seperate inspection on 12/29/11. The area being blanketed was an area used for staging and parking vehicles and was not the area near the gate which has the significant erosion problems. Further blanketing was to be employed at the area near the gate for temporary stabilization until the area can be corrected in the Spring.
2031097 Primary Facility 12/29/2011 Complaint Inspection No Violations Noted A reading of 4 psi after 20 minutes on the 5 x 9 annulus. The well was shut-in for 24 hour monitoring.
2031102 Primary Facility 12/30/2011 Follow-up Inspection No Violations Noted A reading of 84 psi on the 5 x 9 annulus and 3.5 on the 9 x 13 after 24 hour shut-in.
2031572 Primary Facility 01/05/2012 Administrative/File Review No Violations Noted Reviewed E & S Inspection Reports for 10/25 thru 11/14/2011. Reports adequately meet requirements of permit conditions.
2031935 Primary Facility 12/29/2011 Complaint Inspection No Violations Noted DEP Reps - Ryan Klemish, Matt Shope, (Eric Rooney arrived late) met with Chief reps. Rich Adams, Ralph Larsen, and Jon Hafer.Arrived at 10:35 AM. There are 2 annulus' - not shut in. Installed 100 psi pressure guages. After 20 min., the 5 1/2" x 9 5/8" has 3 psi and the 9 5/8" x 13 3/8"? has 0 psi. After 1 hr 17 min, the 5 1/2" x 9 5/8" has 10 psi and ?9 5/8" x 13 3/8"? has o psi. Chief took an isotopic sample.
2035641 Primary Facility 01/20/2012 Follow-up Inspection No Violations Noted
2036680 Primary Facility 01/24/2012 Administrative/File Review No Violations Noted Response to NOV for Inspection ID: 2030254
2109049 Primary Facility 10/16/2012 Follow-up Inspection No Violations Noted Producing well. No barriers around well head.
2181691 Primary Facility 07/09/2013 Routine/Complete Inspection No Violations Noted
2505878 Primary Facility 2016-07-27 Routine/Complete Inspection No Violations Noted
2546002 Primary Facility 2016-12-19 Routine/Complete Inspection No Violations Noted
2713312 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted Arrived at site at: 08:30. Weather: Overcast, cold ~ 35 degs. Onsite to perform routine inspections of wells on pad. A total of (9) wells were present on pad. All (9) wells were in production at time of inspection. All wells Prod. tree top press. "PTTP", Prod. line press. "PLP" and Prod. casing press. "PCP" were being monitored by wireless data sending units and/or analog gauges. (See individual well pressures and observations listed below.)

- All wells had (2) annular vents present labeled (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2"). All annular vents were open and venting to (3) poly vent tanks "VTs" via shared 2" vent lines. I labeled the VTs with a black magic marker at time of inspection. (#1 VT shares the 2H, 5H, 3H & N1H annular vents. #2 VT shares the N4H, N2H & N3H annular vents. #3 VT shares the 1H & 4H annular vents.) I performed gas checks at VT lid openings using a Altair 5X gas meter calibrated on 3/5/18. Gas checks showed: VT #1 = 48% LEL, 2% CH4; VT #2 = 10% LEL, 0% CH4; VT #3 = 40% LEL, 2% CH4.

2743686 Primary Facility 2018-06-12 Routine/Complete Inspection No Violations Noted "Pump-down" operations were being conducted by Halliburton Oilfield Services on the 1H well. There were no violations noted. If you have any questions, please contact me.
2804612 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted Chief Oil & Gas submitted a Notice of Termination (NOT) for the Garrison pad covered under ESX29-131-17-0003. The NOT was received by the Department on 9/27/18. Arrived onsite for at 10:35; the weather was ~30°F and calm. Several frozen puddles were on the pad surface.

There were 9 properly tagged Marcellus wells staged for production. Most of the well cellars were filled with water; no bubbling was observed. There were 9 GPUs and 1 compressor onsite and in secondary containment. There was approx. 6 to 12 inches of mostly frozen water in the produced water tank secondary containment. Secondary containment also remained around the wells. I contacted Chris Vassallo via email and was informed on 11/16/18 that the containment is there due to scheduled maintenance on one of the wells.

The site was well vegetated and appeared stable. All PCSM had been constructed and no temporary E&S BMPs remained.

It is recommended that secondary containment around the produced water tanks be monitored and the water removed a

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1956723 606430 03/11/2011 03/14/2011 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1956723 606431 03/11/2011 03/14/2011 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety
1956723 606442 03/11/2011 03/14/2011 102.4INADPLN - E&S Plan not adequate Administrative
1970791 610311 05/05/2011 06/01/2011 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1970791 610312 05/05/2011 06/01/2011 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety
1975452 611872 05/22/2011 06/13/2011 78.66A - Failure to report release of substance threatening or causing pollution Administrative
1975452 612403 05/22/2011 06/13/2011 401 CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety
2030254 628115 12/27/2011 01/20/2012 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Erosion caused by vehicular traffic near gate to pad. Area was noted in an inspection on 7/7/11 and was not addressed. Area is noted in the operator's E & S Inspection Reports as "unsatisfactory".

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
628115 278937 NOV - Notice of Violation

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/07/2011 08/07/2011 7858.00 1,020,138.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Super Scale Control TSC Superior Well Services Scale Inhibitor 1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1
Anionic Copolymer
1,2-Propylene glycol 57-55-6 0.04
Anionic Polymer
Sand (Proppant) Superior Well Services Propping Agent
Quartz 14808-60-7 99.90 10.38
Water Base Fluid Water 100.00 89.37
KR-153SL Superior Well Services Biocide
Polyethylene glycol 25322-68-3 50.00
Diethylene glycol 111-46-6
Ethylene glycol 107-21-1 1.00
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.02
WFR-3B Superior Well Services Friction Reducer
Distillates, petroleum, hydrotreated light 64742-47-8 0.15
Ethoxylated C12-16 alcohols 68551-12-2 4.00
Stoddard solvent 8052-41-3 10.00
1,2-Propylene glycol 57-55-6 25.00
FE OXCLEAR Superior Well Services Oxygen Scavenger Ammonium bisulfite 10192-30-0 0.01

For data sources see[7]