X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-24131

Well Details

Well ID: 37-125-24131
Loading map...
Operator Name: HAYDEN HARPER ENERGY KA LLC
First Permit Date: 2010-05-25
Last Permit Date: 2010-05-25
Spud Date: 2010-06-17
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.179558
Longitude: -79.995163

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 11643.02 365.0 0.0 0.0 10.8 365.0
2010-0 11234.0 184.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 PRODUCED FLUID 120.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2010-0 PRODUCED FLUID 187.7 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WV OIL GATHERING BELMONT WV
2011-0 PRODUCED FLUID 145.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2011-0 PRODUCED FLUID 66.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WV OIL GATHERING BELMONT WV

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1892987 2010-06-18 No Violations Noted Phillips 1 - Waiting on cement dry time for 7", no returns on cement, grouted back side, site and location good

References