If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-125-24131 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.179558,"lon":-79.995164,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Washington | |
| Municipality: Fallowfield Township | |
| Operator Name: K PETROLEUM INC | |
| Well Pad ID: | |
| Farm/Lease Name: KERNS 1-P418 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2010-05-25 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.179558 | |
| Longitude: -79.995164 |
| Date | Event |
|---|---|
| 2010-05-25 | New Permit Application |
| 2010-06-17 | Performed Spud Operation |
| 2010-06-22 | Drilling Completion |
| 2010-06-22 | Perforation |
| 2010-06-22 | Performed Stimulation |
| 2010-09-24 | NEWLY DRILLED |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2010-06-22 | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2010 | MTN V OIL & GAS INC | 11,234.00 | 184 | 0.00 | 0 | 0.00 | 0 |
| 2011 | HAYDEN HARPER ENERGY KA LLC | 11,643.02 | 365 | 10.80 | 365 | 0.00 | 0 |
| 2012 | HAYDEN HARPER ENERGY KA LLC | 7,355.00 | 324 | 0.00 | 0 | 0.00 | 0 |
| 2013 | HAYDEN HARPER ENERGY KA LLC | 7,947.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | HAYDEN HARPER ENERGY KA LLC | 7,364.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | K PETROLEUM INC | 6,553.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | K PETROLEUM INC | 6,354.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2017 | K PETROLEUM INC | 6,160.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | K PETROLEUM INC | 5,006.58 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | K PETROLEUM INC | 4,856.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2010 | MTN V OIL & GAS INC | Produced Fluid | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2010 | MTN V OIL & GAS INC | Produced Fluid | 187.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
| 2011 | HAYDEN HARPER ENERGY KA LLC | Produced Fluid | 66.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
| 2011 | HAYDEN HARPER ENERGY KA LLC | Produced Fluid | 145.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
| 2012 | HAYDEN HARPER ENERGY KA LLC | Produced Fluid | 74.00 Bbl | INJECTION DISPOSAL WELL | 34-167-29395 |
| 2013 | HAYDEN HARPER ENERGY KA LLC | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-167-29395 |
| 2014 | HAYDEN HARPER ENERGY KA LLC | Produced Fluid | 80.80 Bbl | INJECTION DISPOSAL WELL | 2D0732540 |
| 2017 | K PETROLEUM INC | Produced Fluid | 101.00 Bbl | INJECTION DISPOSAL WELL | 34-167-29395 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1892987 | Primary Facility | 2010-06-18 | Drilling/Alteration | No Violations Noted | Phillips 1 - Waiting on cement dry time for 7", no returns on cement, grouted back side, site and location good |
For data sources see[8]