X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-113-20212

Well Details

Well ID: 37-113-20212
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Elkland Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 149737
Farm/Lease Name: RUNABUCK UNIT 3H
License Status: Active
Spud Date: 2013-07-11
Permit Date: 2013-05-28
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.5334
Longitude: -76.601294

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-02 2013-10-07 7309 6,350,480.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BA-40L Halliburton Buffering Agent Potassium Carbonate 584-08-7 60 0.001 0
Bactron K-139 Champion Technologies Biocide Quaternary ammonium compounds,
benzyl-C-12-16 alkyldimethyl, chlorides
68424-85-1 10 0.004 0
Glutaraldehyde 111-30-8 5 0.002 0
Ethanol 64-17-5 5 0.002 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.02 0
Gyptron T-390 Champion Technologies Scale Inhibitor Methanol 67-56-1 10 0.001 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.1 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.88 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 2,866,276.00 266 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 1,855,005.85 365 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 1,170,900.55 363 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 840,876.63 360 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 703,030.92 361 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 134,936.26 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 462.19 Tons LANDFILL 301358
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC006
2013 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 2,873.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 669.49 Tons LANDFILL 100933
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 700.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2013 CHIEF OIL & GAS LLC Fracturing Fluid Waste (in Tons) 22.16 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC006
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) 3,219.46 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) 1,868.38 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 970.75 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 429.26 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 359.19 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 96.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2178371 Primary Facility 2013-06-26 Routine/Complete Inspection No Violations Noted No temporary stabilization along access road slopes. 102.22 calls for temp stab after 4 days, but do not have time frame.
2190325 Primary Facility 2013-08-08 Drilling/Alteration No Violations Noted
2213941 Primary Facility 2013-10-16 Routine/Complete Inspection No Violations Noted
2248348 Primary Facility 2014-02-25 Routine/Partial Inspection No Violations Noted
2434067 Primary Facility 2015-12-16 Routine/Complete Inspection No Violations Noted Arrived at 10:04, weather cold and cloudy. There is one TD’d well on this location. There was water in the cellar, no BAW.
2452062 Primary Facility 2016-02-23 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess general conditions on site. No Chief representatives were present.

Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed. Surface conductance of puddles on the pad was not screened due to puddles being frozen.

No violations were cited during this inspection.

2543339 Primary Facility 2016-12-09 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall conditions on site. No Chief representatives were present.

Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.

An extension of time for site resotration was approved by the Department on August 11, 2016. A condition of the restoration extension requires the installation of post-construction stormwater management (PCSM) BMPs by November 11, 2016. Chief has requested an extension of time to install the PCSM BMPs.

No violations were cited during this inspection.

2689581 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted One well staged for production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted.
2796345 Primary Facility 2018-10-26 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 09:45. Steve from Waste Management arrived at the same time. He was dropping off a dumpster near the produced water tanks. He believed that Chief was coming to the pad later that day to clean out the tanks.

There was 1 properly tagged Marcellus well staged for production. There was also 1 GPU, 1 compressor and 2 produced water tanks onsite and in secondary containment. The well cellar contained some water; no bubbling was observed.

The site was >70% vegetative cover and no E&S issues were observed. According to plans onsite PCSM appeared to be constructed and functioning as designed. Some compost filter sock remained onsite (Photos #1, 3).

Department records indicate that the ESCGP does not expire until 11/12/22.

No violations noted.

For data sources see[7]

References