X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-113-20212

Well Details

Well ID: 37-113-20212
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Elkland Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 149737
Farm/Lease Name: RUNABUCK UNIT
License Status: Active
Spud Date: 2013-07-10
Permit Date: 2013-05-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.5334
Longitude: -76.601294

For data sources see[1][2][3]

Well History

Date Event
2013-05-28 New Permit Application
2013-07-11 Performed Spud Operation
2013-08-31 Drilling Completion
2013-09-18 Perforation
2013-10-03 Perforation
2013-10-03 Performed Stage 1 of Stimulation
2013-10-03 Performed Stage 2 of Stimulation
2013-10-03 Performed Stage 3 of Stimulation
2013-10-04 Perforation
2013-10-04 Performed Stage 4 of Stimulation
2013-10-04 Performed Stage 5 of Stimulation
2013-10-04 Performed Stage 6 of Stimulation
2013-10-04 Performed Stage 7 of Stimulation
2013-10-05 Perforation
2013-10-05 Performed Stage 10 of Stimulation
2013-10-05 Performed Stage 11 of Stimulation
2013-10-05 Performed Stage 12 of Stimulation
2013-10-05 Performed Stage 8 of Stimulation
2013-10-05 Performed Stage 9 of Stimulation
2013-10-06 Perforation
2013-10-06 Performed Stage 13 of Stimulation
2013-10-06 Performed Stage 14 of Stimulation
2013-10-06 Performed Stage 15 of Stimulation
2013-10-06 Performed Stage 16 of Stimulation
2013-10-06 Performed Stage 17 of Stimulation
2013-10-06 Performed Stage 18 of Stimulation
2013-10-07 Perforation
2013-10-07 Performed Stage 19 of Stimulation
2013-10-07 Performed Stage 20 of Stimulation
2016-07-12 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-02 2013-10-07 7,309 6,350,480

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BA-40L Halliburton Buffering Agent Potassium Carbonate 584-08-7 60 0.001 0
Bactron K-139 Champion Technologies Biocide Quaternary ammonium compounds,
benzyl-C-12-16 alkyldimethyl, chlorides
68424-85-1 10 0.004 0
Glutaraldehyde 111-30-8 5 0.002 0
Ethanol 64-17-5 5 0.002 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.02 0
Gyptron T-390 Champion Technologies Scale Inhibitor Methanol 67-56-1 10 0.001 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.1 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.88 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-10-03 1 Sand 5,989,494 7,796 8,617
2013-10-03 2 Sand 5,989,494 7,664 8,315
2013-10-03 3 Sand 5,989,494 7,603 8,380
2013-10-04 4 Sand 5,989,494 7,849 8,613
2013-10-04 5 Sand 5,989,494 7,523 8,451
2013-10-04 6 Sand 5,989,494 7,521 8,222
2013-10-04 7 Sand 5,989,494 7,285 8,175
2013-10-05 8 Sand 5,989,494 7,085 8,148
2013-10-05 9 Sand 5,989,494 7,941 8,535
2013-10-05 10 Sand 5,989,494 7,624 8,468
2013-10-05 11 Sand 5,989,494 7,392 8,072
2013-10-05 12 Sand 5,989,494 7,241 8,101
2013-10-06 13 Sand 5,989,494 7,262 8,220
2013-10-06 14 Sand 5,989,494 7,214 8,150
2013-10-06 15 Sand 5,989,494 7,192 8,246
2013-10-06 16 Sand 5,989,494 7,055 7,903
2013-10-06 17 Sand 5,989,494 6,950 8,084
2013-10-06 18 Sand 5,989,494 6,641 8,144
2013-10-07 19 Sand 5,989,494 6,440 8,238
2013-10-07 20 Sand 5,989,494 6,355 7,316

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 2,866,276.00 266 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 1,855,005.85 365 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 1,170,900.55 363 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 840,876.63 360 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 703,030.92 361 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 420,235.04 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 CHIEF OIL & GAS LLC Fracing Fluid Waste 2,873.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC006
2013 CHIEF OIL & GAS LLC Drill Cuttings 462.19 Tons LANDFILL 301358
2013 CHIEF OIL & GAS LLC Fracturing Fluid Waste 22.16 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC006
2013 CHIEF OIL & GAS LLC Drill Cuttings 669.49 Tons LANDFILL 100933
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste 700.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Produced Fluid 3,219.46 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 1,868.38 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 970.75 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 30.55 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 429.26 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 96.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 359.19 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 82.25 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2178371 Primary Facility 2013-06-26 Routine/Complete Inspection No Violations Noted No temporary stabilization along access road slopes. 102.22 calls for temp stab after 4 days, but do not have time frame.
2190325 Primary Facility 2013-08-08 Drilling/Alteration No Violations Noted
2213941 Primary Facility 2013-10-16 Routine/Complete Inspection No Violations Noted
2248348 Primary Facility 2014-02-25 Routine/Partial Inspection No Violations Noted
2434067 Primary Facility 2015-12-16 Routine/Complete Inspection No Violations Noted Arrived at 10:04, weather cold and cloudy. There is one TD’d well on this location. There was water in the cellar, no BAW.
2452062 Primary Facility 2016-02-23 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess general conditions on site. No Chief representatives were present.

Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed. Surface conductance of puddles on the pad was not screened due to puddles being frozen.

No violations were cited during this inspection.

2543339 Primary Facility 2016-12-09 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall conditions on site. No Chief representatives were present.

Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.

An extension of time for site resotration was approved by the Department on August 11, 2016. A condition of the restoration extension requires the installation of post-construction stormwater management (PCSM) BMPs by November 11, 2016. Chief has requested an extension of time to install the PCSM BMPs.

No violations were cited during this inspection.

2689581 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted One well staged for production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted.
2796345 Primary Facility 2018-10-26 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 09:45. Steve from Waste Management arrived at the same time. He was dropping off a dumpster near the produced water tanks. He believed that Chief was coming to the pad later that day to clean out the tanks.

There was 1 properly tagged Marcellus well staged for production. There was also 1 GPU, 1 compressor and 2 produced water tanks onsite and in secondary containment. The well cellar contained some water; no bubbling was observed.

The site was >70% vegetative cover and no E&S issues were observed. According to plans onsite PCSM appeared to be constructed and functioning as designed. Some compost filter sock remained onsite (Photos #1, 3).

Department records indicate that the ESCGP does not expire until 11/12/22.

No violations noted.

For data sources see[9]

References