X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-23125

Well Details

Well ID: 37-059-23125
Loading map...
Operator Name: PENNECO OIL CO INC
First Permit Date: 2001-09-27
Last Permit Date: 2003-08-18
Spud Date: 2002-01-07
Unconventional: No
Horizontal: No
Violations: None
Latitude: 39.878638
Longitude: -80.367001

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 3292.0 365.0 0.0 0.0 0.0 0.0
2012-0 2633.0 335.0 0.0 0.0 0.0 0.0
2011-0 3681.0 365.0 0.0 0.0 0.0 0.0
2010-0 4024.0 365.0 0.0 0.0 0.0 0.0
2009-0 2007.0 365.0 0.0 0.0 0.0 0.0
2008-0 1888.0 365.0 0.0 0.0 0.0 0.0
2007-0 2251.0 365.0 0.0 0.0 0.0 0.0
2006-0 2480.0 365.0 0.0 0.0 0.0 0.0
2005-0 3328.0 365.0 0.0 0.0 0.0 0.0
2004-0 3391.0 243.0 0.0 0.0 0.0 0.0
2003-0 544.0 305.0 0.0 0.0 0.0 0.0
2002-0 1697.0 122.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2004-0 BRINE 1215.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT ALLEGHENY VALLEY JT SEW AUTH
2004-0 BRINE 1215.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT CHARLEROI BORO STP
2004-0 BRINE 1215.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2008-0 BRINE 55.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1101635 2002-02-26 No Violations Noted Access is now stoned, site ID & plan here, well drilled, pits lined, some rainwater filling in in pits, pits downgrade of bench. Trees loggable are stacked & trimmed. Bench is ditched, access same and culverted. Access is steep but now rocked.
1110883 2002-03-26 No Violations Noted Loc. is drilled, restored & mulched. Access is well rocked. Culverted areas were working. At bench a mudflow has diverted bench run-off down the access. Rest of restoration held up in flash flood.
1164791 2002-08-30 No Violations Noted Steep access is stabilized, bench slip corrected at top on high wall side, graded & ditched access, vegetating well, well producing and metered.

References