X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-039-25753"

m
m
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-039-25753
 
| Well ID: 37-039-25753
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.798, -80.328583 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.798, -80.328583 | width=100% | height=100% }}  
 
|-
 
|-
 
| Operator Name: [[ENERVEST OPR LLC]]
 
| Operator Name: [[ENERVEST OPR LLC]]

Revision as of 16:00, 28 June 2014

Well Details

Well ID: 37-039-25753
Loading map...
Operator Name: ENERVEST OPR LLC
First Permit Date: 2011-12-21
Last Permit Date: 2011-12-21
Spud Date: 2012-01-06
Unconventional: No
Horizontal: No
Violations: None
Latitude: 41.798
Longitude: -80.328583

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2029692 2011-12-27 No Violations Noted Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met.
2029881 2011-12-28 No Violations Noted Today's inspection was in follow-up to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site. Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor, Mr Foley had been addrssed. BMPs have been installed as requested. The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site.
2032576 2012-01-09 No Violations Noted
2033278 2012-01-11 No Violations Noted
2034459 2012-01-10 No Violations Noted Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager, and he agreed to have the BMP repaired today.
2034483 2012-01-11 No Violations Noted Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits.
2035179 2012-01-13 No Violations Noted
2035382 2012-01-18 No Violations Noted
2038572 2012-01-26 No Violations Noted Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard.
2068733 2012-05-16 No Violations Noted
2069109 2012-05-18 No Violations Noted
2097233 2012-08-24 No Violations Noted
2129469 2013-01-08 Crawford Spring Twp No Violations Noted
2175002 2013-06-11 Crawford Spring Twp No Violations Noted

References