== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 021-21164
+
| Well ID: 37-021-21164
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.61023, -78.5868 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.610231, -78.5868 | width=100% | height=100% }}
 
|-
 
|-
| County: [[wikipedia:Cambria County, Pennsylvania|Cambria]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[wikipedia:Clearfield Township, Cambria County, Pennsylvania|Clearfield Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[wikipedia:CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| County: [[Cambria_County,_Pennsylvania|Cambria]]
 +
|-
 +
| Municipality: [[Clearfield Township,_Cambria_County,_Pennsylvania|Clearfield Township]]
 +
|-
 +
| Operator Name: [[LPR ENERGY LLC]]
 +
|-
 +
| Well Pad ID: [[146495]]
 
|-
 
|-
 
| Farm/Lease Name: SMITHMYER UNIT 1H
 
| Farm/Lease Name: SMITHMYER UNIT 1H
 
|-
 
|-
| First Permit Date: 2010-08-04
+
| License Status: Inactive
 
|-
 
|-
| Last Permit Date: 2010-08-04
+
| Spud Date: 2011-05-11
 
|-
 
|-
| Spud Date: 2011-05-11
+
| Permit Date: 2010-08-04
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 1
+
| Conservation: No
 
|-
 
|-
| Latitude: 40.61023
+
| Latitude: 40.610231
 
|-
 
|-
 
| Longitude: -78.5868
 
| Longitude: -78.5868
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|
 +
| DEVIATED
 +
|-
 +
| 2010-08-04
 +
| New Permit Application
 +
|-
 +
| 2011-05-11
 +
| Performed Spud Operation
 +
|-
 +
| 2011-07-18
 +
| Drilling Completion
 +
|-
 +
| 2019-03-15
 +
| Inactive Well Request Granted
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Job Number
!scope="col" | DATE
+
!scope="col" | Job Start Date
!scope="col" | DESCRIPTION
+
!scope="col" | Job End Date
!scope="col" | COMMENT
+
!scope="col" | True Vertical Depth (ft)
!scope="col" | VIOLATION ID
+
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 1995968
+
|}-->
| 2011-08-16
+
<!--==== Fluid Composition Data ====
| No Violations Noted
+
{| class="wikitable sortable" width="95%"
| Id sign at entrance. Drilling complete. No rig onsite. Well not yet equipped for production. E&S ok.
+
!scope="col" | Job Number
|  
+
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
| 1997496
+
|}-->
| 2011-08-16
 
| Viol(s) Noted &  Immediately Corrected
 
| Site visit was result of spill notification by Nick Staffieri of Chevron on August 13, 2011.
 
Oil based drilling mud was spilled on containment (approximately 1 barrel).  Spill was contained and removed.  Upon its removal a hole in the containment liner was observed.  It was determined that approximately five gallons of mud made it to the pad.  At time of the inspection ES&G Environmental and Moody and Associates were doing an analysis of the spill area following Act 2 parameters.  All contaminated materials were in sealed roll of boxes.
 
  
| 618424
+
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2002450
+
| 2011
| 2011-09-13
+
| [[CHIEF OIL & GAS LLC]]
| No Violations Noted
+
| Drilling Fluid Waste
| Drilling complete. Id sign and e&s plan ok. No rig onsite.
+
| style="text-align: right;" | 720.00 Bbl
|  
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| EPA ID: 748-163
 
|-
 
|-
 +
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 194.71 Tons
 +
| LANDFILL
 +
| 101421
 
|-
 
|-
| 2003118
+
| 2011
| 2011-09-02
+
| [[CHIEF OIL & GAS LLC]]
| No Violations Noted
+
| Drill Cuttings
| At the time of inspection, well sign, ES plan, and ESCGP-1 present.  Access road adequately rocked and stable. Site gated with 24 hr security onsite. Well drilled, not yet in production.  BMPs installed and functioning properly. No accelerated erosion or sedimentation observed. Site has been temporarily seeded and mulched providing temporary stabilization. Five frac tanks located onsite, noted that one tank was left with a hose attached (Chevron Rep Nick Staffieri contacted).  Observed that area of previously reported spill has been cleaned up, yet disturbed areas have not yet been restored as operator is awaiting final analysis results to confirm all contaminates have been removed. A follow up inspection will be conducted to ensure that previously impacted areas have been successful remediated.
+
| style="text-align: right;" | 695.88 Tons
|  
+
| LANDFILL
 +
| 101534
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1972639
 
| 1972639
 +
| Primary Facility
 
| 2011-05-13
 
| 2011-05-13
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, well sign (permit #), ES plan, and ESCGP-1 located onsite. Well spud 05/11/11. Access road stable.  Rig located onsite actively drilling. Site secured by fence and 24hr security. Observed temporary (lined) containment pad located beneath rig in order to prevent/contain a possible pollution event. Temporary BMP¿s installed according to ES plan. All culverts, outlets, and sediment traps appear adequately rocked. No accelerated erosion/sedimentation or IW issues are noted. Operator should continue to routinely monitor/maintain all BMP¿S until final site restoration is achieved.  All previously disturbed areas have been stabilized with vegetative blankets, with some growth observed. Soil pile has been temporarily seeded, minimal growth observed, although compost sox installed down gradient.  No violations noted during this inspection.
 
| At the time of inspection, well sign (permit #), ES plan, and ESCGP-1 located onsite. Well spud 05/11/11. Access road stable.  Rig located onsite actively drilling. Site secured by fence and 24hr security. Observed temporary (lined) containment pad located beneath rig in order to prevent/contain a possible pollution event. Temporary BMP¿s installed according to ES plan. All culverts, outlets, and sediment traps appear adequately rocked. No accelerated erosion/sedimentation or IW issues are noted. Operator should continue to routinely monitor/maintain all BMP¿S until final site restoration is achieved.  All previously disturbed areas have been stabilized with vegetative blankets, with some growth observed. Soil pile has been temporarily seeded, minimal growth observed, although compost sox installed down gradient.  No violations noted during this inspection.
|
 
|-
 
 
|-
 
|-
 
| 1975379
 
| 1975379
 +
| Primary Facility
 
| 2011-05-18
 
| 2011-05-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S or IW discharge issues at the site.  Chief hired UDI rig. Dewayne Pauley is the company representative.  Conductor pipe set at 69 ft using 20¿ pipe.  First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return.  Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return.  Current depth was at 2,300 feet.  Pilot hole set for 9000 ft. E&S controls were in place.
 
| At the time of inspection, no E&S or IW discharge issues at the site.  Chief hired UDI rig. Dewayne Pauley is the company representative.  Conductor pipe set at 69 ft using 20¿ pipe.  First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return.  Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return.  Current depth was at 2,300 feet.  Pilot hole set for 9000 ft. E&S controls were in place.
|
 
|-
 
 
|-
 
|-
 
| 1986001
 
| 1986001
 +
| Primary Facility
 
| 2011-06-28
 
| 2011-06-28
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S or IW discharge issues at the site.  Conductor pipe set at 69 ft using 20¿ pipe.  First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return.  Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return.  Current depth was at 9263 feet.  Cement plug was set back to 8500 ft approximately 737 ft. and used 300 sks of Class A cement.  Wire line Survey was completed of the well.  Horizontal leg scheduled for 4699 feet.  E&S controls were in place.
 
| At the time of inspection, no E&S or IW discharge issues at the site.  Conductor pipe set at 69 ft using 20¿ pipe.  First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return.  Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return.  Current depth was at 9263 feet.  Cement plug was set back to 8500 ft approximately 737 ft. and used 300 sks of Class A cement.  Wire line Survey was completed of the well.  Horizontal leg scheduled for 4699 feet.  E&S controls were in place.
|
 
|-
 
 
|-
 
|-
 
| 1986053
 
| 1986053
 +
| Primary Facility
 
| 2011-06-01
 
| 2011-06-01
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S or IW discharge issues at the site.  Chief hired UDI rig. Dewayne Pauley is the company representative.  Conductor pipe set at 69 ft using 20¿ pipe.  First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return.  Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return.  Current depth was at 9250 feet.  Bridge plug set at 1700 ft. with 10ft cement plug on top of plug. E&S controls were in place.
 
| At the time of inspection, no E&S or IW discharge issues at the site.  Chief hired UDI rig. Dewayne Pauley is the company representative.  Conductor pipe set at 69 ft using 20¿ pipe.  First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return.  Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return.  Current depth was at 9250 feet.  Bridge plug set at 1700 ft. with 10ft cement plug on top of plug. E&S controls were in place.
|
 
 
|-
 
|-
 +
| 1995968
 +
| Primary Facility
 +
| 2011-08-16
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Id sign at entrance. Drilling complete. No rig onsite. Well not yet equipped for production. E&S ok.
 +
|-
 +
| 1997496
 +
| Primary Facility
 +
| 2011-08-16
 +
| Routine/Complete Inspection
 +
| Viol(s) Noted &  Immediately Corrected
 +
| Site visit was result of spill notification by Nick Staffieri of Chevron on August 13, 2011.
 +
|-
 +
| 2002450
 +
| Primary Facility
 +
| 2011-09-13
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Drilling complete. Id sign and e&s plan ok. No rig onsite.
 +
|-
 +
| 2003118
 +
| Primary Facility
 +
| 2011-09-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection, well sign, ES plan, and ESCGP-1 present.  Access road adequately rocked and stable. Site gated with 24 hr security onsite. Well drilled, not yet in production.  BMPs installed and functioning properly. No accelerated erosion or sedimentation observed. Site has been temporarily seeded and mulched providing temporary stabilization. Five frac tanks located onsite, noted that one tank was left with a hose attached (Chevron Rep Nick Staffieri contacted).  Observed that area of previously reported spill has been cleaned up, yet disturbed areas have not yet been restored as operator is awaiting final analysis results to confirm all contaminates have been removed. A follow up inspection will be conducted to ensure that previously impacted areas have been successful remediated.
 
|-
 
|-
 
| 2040799
 
| 2040799
 +
| Primary Facility
 
| 2012-01-31
 
| 2012-01-31
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Gas well was not in production. Chevron was called by DEP to change well sign from Chief to Chevron.
 
| At the time of inspection, no E&S issues were present at the site.  Gas well was not in production. Chevron was called by DEP to change well sign from Chief to Chevron.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2093223
 
| 2093223
 +
| Primary Facility
 
| 2012-07-18
 
| 2012-07-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site.  Gas well was not in production.  
+
| At the time of inspection, no E&S issues were present at the site.  Gas well was not in production.
 
 
 
 
 
 
|
 
 
|-
 
|-
|}
+
| 2148481
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2013-03-07
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| On-site meeting with Chevron rep Curtis Small.
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2223649
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2013-11-20
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Production equipment on site, though well not in production at time of inspection. Site surrounded by fence, gated off. Site ID located on access road. Pad is not vegetated and remains stone-covered. Production equipment and brine tank surrounded by gate. Tank is on lined secondary containment. Tank appears sound. Two stockpiles of stone on site. Well spudded on 5/11/13, granted inactive status on 6/08/12. Dept. spoke to two reps from Chevron who arrived on site during inspection. Discussed well history and plans for restoration work. No E&S issues observed and access road is in good condition.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2266650
 +
| Primary Facility
 +
| 2014-04-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On-site inspt in response to NOT submittal by Opr on 4/02/14 for ESX10-021-0002 (Smithmyer Well Pad).Site ID sign present, in compliance with Act 9 standards.ERP, E&S/PCSM plan, ESCGP-1 on-site.Site is stabilized w/uniform & adequate veg growth.AR in good condition.Current on-site conditions do not meet previously-approved PCSM plan.Components on-site that are not identified on PCSM plan include: a culvert pipe installed in the fill slope of the pad, a rock pile, & a pile of (what appears to be) absorbent materials.Dept spoke to Opr rep Nick Staffieri to inquire about these unidentified components & to recommend that PCSM BMPs are properly monitored & maintained (i.e. access road culverts & ditches).Mr. Staffieri agreed to investigate & subsequently respond to Dept's inquiries once sufficient answers can be provided.As the current PCSM plan does not reflect on-site conditions, this NOT is being denied at this time.Pending awaiting add'l info.
 
|-
 
|-
| 2012-1
+
| 2321577
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2014-11-13
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Marcellus. At time of inspection, well drilled, not yet frac'd. According to records, drilling occurred 5/11/2011-7/18/2011. Well granted inactive status on 6/8/2012. Well tag present. Brine tank on containment.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2325389
 +
| Primary Facility
 +
| 2014-12-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Marcellus. At time of inspection, well drilled, not yet frac'd. According to records, drilling occurred 5/11/2011-7/18/2011. Well granted inactive status on 6/8/2012. Well tag present. Poly tank on containment, appears sound. Well surrounded by gate.
 
|-
 
|-
| 2011-2
+
| 2334723
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2014-12-30
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well is inactive. At the time of, no issues were recorded.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2349913
 +
| Primary Facility
 +
| 2015-03-04
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| At time of inspection, well is in regulatory inactive status, granted 6/8/2012. According to records, drilling occurred 5/11/2011-7/18/2011. Gate located around wellhead.
 
|-
 
|-
| 2011-2
+
| 2465384
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-03-16
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well is inactive. At the time of, no issues were recorded.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2549963
 +
| Primary Facility
 +
| 2016-12-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| No activity at site.  well in inactive mode.
 
|-
 
|-
| 2011-1
+
| 2655276
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-11-01
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| DEP personnel performed inspection of the site for inactive well status. Well is currently shut in pending pipeline construction.  At the time of inspection, no issues at the site. Well meets all criteria for 78.102 regulation.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2697826
 +
| Primary Facility
 +
| 2018-02-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well does not appear equipped for production. Well head surrounded by security fence.
 +
According to Department's records DEP OGI conducted site inspection regarding inactive status on 11-01-17 and found operator in compliance.
 
|-
 
|-
| 2010-2
+
|}
| style="text-align:right;" | 0.0
+
==== Violations Commited ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Inspection ID
| style="text-align:right;" | 0.0
+
!scope="col" | Violation ID
| style="text-align:right;" | 0.0
+
!scope="col" | Violation Date
| style="text-align:right;" | 0.0
+
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
|-
+
| 1997496
| 2010-3
+
| 618424
| style="text-align:right;" | 0.0
+
| 08/16/2011
| style="text-align:right;" | 0.0
+
| 2011-08-16
| style="text-align:right;" | 0.0
+
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
| style="text-align:right;" | 0.0
+
| Environmental Health & Safety
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
 
|-
 
| 2011-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 720.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| EPA ID: 748-163
 
| PATRIOT WATER TREATMENT
 
| WARREN
 
| OH
 
|-
 
|-
 
| 2011-1
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 695.88
 
| Tons
 
| LANDFILL
 
| 101534
 
| WASTE MANAGEMENT, INC - LAUREL HIGHLANDS LANDFILL
 
| JOHNSTOWN
 
| PA
 
|-
 
|-
 
| 2011-1
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 194.71
 
| Tons
 
| LANDFILL
 
| 101421
 
| WASTE MANAGEMENT, INC - SHADE LANDFILL
 
| CAIRNBROOK
 
| PA
 
 
|-
 
|-
|}
+
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 11:31, 2 June 2020

Well Details

Well ID: 37-021-21164
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Clearfield Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 146495
Farm/Lease Name: SMITHMYER UNIT 1H
License Status: Inactive
Spud Date: 2011-05-11
Permit Date: 2010-08-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.610231
Longitude: -78.5868

For data sources see[1][2][3]

Well History

Date Event
DEVIATED
2010-08-04 New Permit Application
2011-05-11 Performed Spud Operation
2011-07-18 Drilling Completion
2019-03-15 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2016 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2019 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHIEF OIL & GAS LLC Drilling Fluid Waste 720.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 CHIEF OIL & GAS LLC Drill Cuttings 194.71 Tons LANDFILL 101421
2011 CHIEF OIL & GAS LLC Drill Cuttings 695.88 Tons LANDFILL 101534

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1972639 Primary Facility 2011-05-13 Routine/Complete Inspection No Violations Noted At the time of inspection, well sign (permit #), ES plan, and ESCGP-1 located onsite. Well spud 05/11/11. Access road stable. Rig located onsite actively drilling. Site secured by fence and 24hr security. Observed temporary (lined) containment pad located beneath rig in order to prevent/contain a possible pollution event. Temporary BMP¿s installed according to ES plan. All culverts, outlets, and sediment traps appear adequately rocked. No accelerated erosion/sedimentation or IW issues are noted. Operator should continue to routinely monitor/maintain all BMP¿S until final site restoration is achieved. All previously disturbed areas have been stabilized with vegetative blankets, with some growth observed. Soil pile has been temporarily seeded, minimal growth observed, although compost sox installed down gradient. No violations noted during this inspection.
1975379 Primary Facility 2011-05-18 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief hired UDI rig. Dewayne Pauley is the company representative. Conductor pipe set at 69 ft using 20¿ pipe. First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return. Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return. Current depth was at 2,300 feet. Pilot hole set for 9000 ft. E&S controls were in place.
1986001 Primary Facility 2011-06-28 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe set at 69 ft using 20¿ pipe. First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return. Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return. Current depth was at 9263 feet. Cement plug was set back to 8500 ft approximately 737 ft. and used 300 sks of Class A cement. Wire line Survey was completed of the well. Horizontal leg scheduled for 4699 feet. E&S controls were in place.
1986053 Primary Facility 2011-06-01 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief hired UDI rig. Dewayne Pauley is the company representative. Conductor pipe set at 69 ft using 20¿ pipe. First stringer set at 679 ft with 13 3/8¿ pipe using Gas block of 485 sacks with 15 bbl return. Second stringer was set at 1846 feet using 9 5/8¿ pipe with 585 sks and 15 bbl return. Current depth was at 9250 feet. Bridge plug set at 1700 ft. with 10ft cement plug on top of plug. E&S controls were in place.
1995968 Primary Facility 2011-08-16 Complaint Inspection No Violations Noted Id sign at entrance. Drilling complete. No rig onsite. Well not yet equipped for production. E&S ok.
1997496 Primary Facility 2011-08-16 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected Site visit was result of spill notification by Nick Staffieri of Chevron on August 13, 2011.
2002450 Primary Facility 2011-09-13 Complaint Inspection No Violations Noted Drilling complete. Id sign and e&s plan ok. No rig onsite.
2003118 Primary Facility 2011-09-02 Routine/Complete Inspection No Violations Noted At the time of inspection, well sign, ES plan, and ESCGP-1 present. Access road adequately rocked and stable. Site gated with 24 hr security onsite. Well drilled, not yet in production. BMPs installed and functioning properly. No accelerated erosion or sedimentation observed. Site has been temporarily seeded and mulched providing temporary stabilization. Five frac tanks located onsite, noted that one tank was left with a hose attached (Chevron Rep Nick Staffieri contacted). Observed that area of previously reported spill has been cleaned up, yet disturbed areas have not yet been restored as operator is awaiting final analysis results to confirm all contaminates have been removed. A follow up inspection will be conducted to ensure that previously impacted areas have been successful remediated.
2040799 Primary Facility 2012-01-31 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was called by DEP to change well sign from Chief to Chevron.
2093223 Primary Facility 2012-07-18 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2148481 Primary Facility 2013-03-07 Routine/Complete Inspection No Violations Noted On-site meeting with Chevron rep Curtis Small.
2223649 Primary Facility 2013-11-20 Routine/Complete Inspection No Violations Noted Production equipment on site, though well not in production at time of inspection. Site surrounded by fence, gated off. Site ID located on access road. Pad is not vegetated and remains stone-covered. Production equipment and brine tank surrounded by gate. Tank is on lined secondary containment. Tank appears sound. Two stockpiles of stone on site. Well spudded on 5/11/13, granted inactive status on 6/08/12. Dept. spoke to two reps from Chevron who arrived on site during inspection. Discussed well history and plans for restoration work. No E&S issues observed and access road is in good condition.
2266650 Primary Facility 2014-04-24 Routine/Complete Inspection No Violations Noted On-site inspt in response to NOT submittal by Opr on 4/02/14 for ESX10-021-0002 (Smithmyer Well Pad).Site ID sign present, in compliance with Act 9 standards.ERP, E&S/PCSM plan, ESCGP-1 on-site.Site is stabilized w/uniform & adequate veg growth.AR in good condition.Current on-site conditions do not meet previously-approved PCSM plan.Components on-site that are not identified on PCSM plan include: a culvert pipe installed in the fill slope of the pad, a rock pile, & a pile of (what appears to be) absorbent materials.Dept spoke to Opr rep Nick Staffieri to inquire about these unidentified components & to recommend that PCSM BMPs are properly monitored & maintained (i.e. access road culverts & ditches).Mr. Staffieri agreed to investigate & subsequently respond to Dept's inquiries once sufficient answers can be provided.As the current PCSM plan does not reflect on-site conditions, this NOT is being denied at this time.Pending awaiting add'l info.
2321577 Primary Facility 2014-11-13 Routine/Complete Inspection No Violations Noted Marcellus. At time of inspection, well drilled, not yet frac'd. According to records, drilling occurred 5/11/2011-7/18/2011. Well granted inactive status on 6/8/2012. Well tag present. Brine tank on containment.
2325389 Primary Facility 2014-12-01 Routine/Complete Inspection No Violations Noted Marcellus. At time of inspection, well drilled, not yet frac'd. According to records, drilling occurred 5/11/2011-7/18/2011. Well granted inactive status on 6/8/2012. Well tag present. Poly tank on containment, appears sound. Well surrounded by gate.
2334723 Primary Facility 2014-12-30 Routine/Complete Inspection No Violations Noted Well is inactive. At the time of, no issues were recorded.
2349913 Primary Facility 2015-03-04 Complaint Inspection No Violations Noted At time of inspection, well is in regulatory inactive status, granted 6/8/2012. According to records, drilling occurred 5/11/2011-7/18/2011. Gate located around wellhead.
2465384 Primary Facility 2016-03-16 Routine/Complete Inspection No Violations Noted Well is inactive. At the time of, no issues were recorded.
2549963 Primary Facility 2016-12-13 Routine/Complete Inspection No Violations Noted No activity at site. well in inactive mode.
2655276 Primary Facility 2017-11-01 Routine/Complete Inspection No Violations Noted DEP personnel performed inspection of the site for inactive well status. Well is currently shut in pending pipeline construction. At the time of inspection, no issues at the site. Well meets all criteria for 78.102 regulation.
2697826 Primary Facility 2018-02-23 Routine/Complete Inspection No Violations Noted Well does not appear equipped for production. Well head surrounded by security fence.

According to Department's records DEP OGI conducted site inspection regarding inactive status on 11-01-17 and found operator in compliance.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1997496 618424 08/16/2011 2011-08-16 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety

For data sources see[7]