X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30987"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30987
 
| Well ID: 37-005-30987
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.658558, -79.592586 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.658558, -79.592586 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 01/07/2013
+
| Spud Date: 2013-01-07
 
|-
 
|-
| Permit Date: 1/25/2012
+
| Permit Date: 2012-01-25
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 92: Line 117:
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 124: Line 149:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 143: Line 169:
 
| 2111784
 
| 2111784
 
| Primary Facility
 
| Primary Facility
| 10/26/2012
+
| 2012-10-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 150: Line 176:
 
| 2128171
 
| 2128171
 
| Primary Facility
 
| Primary Facility
| 01/07/2013
+
| 2013-01-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 157: Line 183:
 
| 2131911
 
| 2131911
 
| Primary Facility
 
| Primary Facility
| 01/18/2013
+
| 2013-01-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 164: Line 190:
 
| 2159666
 
| 2159666
 
| Primary Facility
 
| Primary Facility
| 04/10/2013
+
| 2013-04-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 199: Line 225:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:17, 20 August 2019

Well Details

Well ID: 37-005-30987
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Gilpin Township
Operator Name: US ENERGY EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: C KALMAR 3
License Status: Active
Spud Date: 2013-01-07
Permit Date: 2012-01-25
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.658558
Longitude: -79.592586

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 US ENERGY EXPLORATION CORP 3,162.00 270 0.00 0 0.00 0
2014 US ENERGY EXPLORATION CORP 3,160.00 365 0.00 0 0.00 0
2015 US ENERGY EXPLORATION CORP 2,463.00 365 0.00 0 0.00 0
2016 US ENERGY EXPLORATION CORP 1,038.00 180 0.00 0 0.00 0
2017 US ENERGY EXPLORATION CORP 1,115.00 365 0.00 0 0.00 0
2018 US ENERGY EXPLORATION CORP 848.00 365 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2111784 Primary Facility 2012-10-26 Routine/Complete Inspection No Violations Noted Well-site had been constructed, drilling had not commenced. Well-site appeared to have been constructed under a previous permit for this location. Silt fencing appeared to have begun to deteriorate. The Department recommends that once the weather clears the operator perform maintenance on the exisitng controls and replace any perimeter controls as neccesary.
2128171 Primary Facility 2013-01-07 Routine/Complete Inspection No Violations Noted Site construction ahd been completed, drilling had not commenced at the time of the insppection. E&S plan had been implemented as outlined. There was no evidence of accelerated erosion or sedimentation. The Department recommends that the operator closley monitor the access road during well development activites to insure passability and for accelerated erosion and sedimentation issues due to the road construction and current weather conditions.
2131911 Primary Facility 2013-01-18 Routine/Complete Inspection No Violations Noted Drill rig located onsite, drilling was not ongoing. Drill pit located onsite and it had the required two feet of lined freeboard. A portion of the drill cuttings was observed on the cut slope and the operator should endeavour to have these cuttings placed into the drill pit as soon as possible. Observed no erosion issues with the well-site. Noted that the operator had heavily rocked the construction entrance intersection with SR 2060. It was noted that the access road as it crossed the valley approaching the site had no implemented erosion controls to convey runoff off the road thereby making the road a conduit to concentrate and convey sediment. The operator should closely monitor this road and weather conditions to insure an accelerated erosion issue does not develop.
2159666 Primary Facility 2013-04-10 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Noted erosion issues had begun to develop with the access road. Specifically the issues had begun to develop with the roadside ditches on either side of the culverted stream crossing. In addition it did not appear that all of the access road eorsion controls had been implemented as outlined in the site E&S plan. The site had been regraded and temporarily stabilized. At this time the Department is requesting that the operator forward documentation outlining when site construction activities began for the 005-30987 C. Kalmar 3. This documentation should be sent to WQS Greg Higgins at the above listed address no later than May 5, 2013

For data sources see[5]

References