X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30205"

m
 
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 19:55, 17 June 2014

Well Details

Well ID: 37-005-30205
Loading map...
Operator Name: US ENERGY EXPLORATION CORP
First Permit Date: 2009-01-14
Last Permit Date: 2009-01-14
Spud Date: 2009-07-29
Unconventional: No
Horizontal: No
Violations: 1
Latitude: 40.652753
Longitude: -79.598909

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 17538.0 360.0 0.0 0.0 0.0 0.0
2010-0 2514.0 360.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1818615 2009-08-07 Violation(s) Noted Drilling appeared to have been completed at the time of the inspection. Below grade pit had been reclaimed. Noted accelerated erosion & sedimentation had occurred and sediment had moved off-site. In response to the operator had implemented a second line of filter fabric fencing, however it was installed improperly, i.e. it had not been trenched in with only the stakes for the fencing pounded into the ground. In addition the access road had been rocked, however the drainage ditch and subsequent turnout did not have any erosion control measures implemented to minimize erosion & sedimentation. 568760
1818615 2009-08-07 Violation(s) Noted Drilling appeared to have been completed at the time of the inspection. Below grade pit had been reclaimed. Noted accelerated erosion & sedimentation had occurred and sediment had moved off-site. In response to the operator had implemented a second line of filter fabric fencing, however it was installed improperly, i.e. it had not been trenched in with only the stakes for the fencing pounded into the ground. In addition the access road had been rocked, however the drainage ditch and subsequent turnout did not have any erosion control measures implemented to minimize erosion & sedimentation. 568760
1834708 2009-09-08 No Violations Noted
1834710 2009-09-08 No Violations Noted

References