If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-90001 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":0,"lon":0,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: HISTORIC OWNER | |
Well Pad ID: | |
Farm/Lease Name: This Record Is used for Issues other Than Wells | |
License Status: Not Drilled | |
License Date: | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 0.000000 | |
Longitude: 0.000000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Well Added to System | 2002-08-29 | WELL WAS ADDED TO SYSTEM ON 8/29/2002 2:42:37 PM |
Record Last Modified | 2014-09-11 | This Record Is used for Issues other Than Wells |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0343675505 | 2017-08-01 | Drill / Deepen / Reopen | No Violations | I was on location with Trumbull County Inspector Rick Skidmore to inspect pad construction operations on the Williams Farm. The permits for the Williams #s 1H & 2H have been applied for, but have not been issued as of the date of this inspection. The pad has been compacted, the drilling pits have been excavated on the north side of the pad, and a drainage ditch has been excavated on the north and east sides. Silt fence has been placed along the southern boundary of the pad and topsoil has been stockpiled to the north and east. We met with US Energy Field Supervisor, Harry Mills, and discussed some concerns with the drainage culvert at the entrance to the pad. He said he will install a stone lined catch basin to minimize off-site sedimentation to the south. Stone is currently being delivered to construct the entrance apron. Construction activities will be monitored for any issues. No violations. |
343675505 | 2017-8-1 0:00:0 | DD | No Violations | 1.20 |
For data sources see[3]