X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23128

Well Details

Well ID: 34-153-23128
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Springfield Township
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP
Well Pad ID:
Farm/Lease Name: RAYL PROPERTIES UNIT
License Status: Producing
License Date: 2012-01-26
Spud Date: 2011-10-05
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2011-10-14
Well Total Depth: 4272 ft
Configuration: Directional
Latitude: 41.039987317
Longitude: -81.48749726

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-03-29 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:3/29/2011, Expired Date:3/28/2013 12:00:00 PM, Drilling unit acres:49.82, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2011-10-07 ADDED "FLUID DRILLING REQUIREMENT WAIVER".
Reached Total Depth 2011-10-14
Completion Report Received 2012-01-09
Correction to Well 2012-02-24 CORRECTION TO TARGET FOOTAGE & COORDIATES FROM AS DRILLED SURVEY.
Construction Permit Expires 2012-03-28
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-01-26 4002 4071 70

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-11-08 H2O 15 93069 Gal 60000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 OHIO VALLEY ENERGY SYSTEM CORP 11725 1004 113
2013 OHIO VALLEY ENERGY SYSTEM CORP 49942 1928 365
2014 OHIO VALLEY ENERGY SYSTEM CORP 36936 1306 365
2015 OHIO VALLEY ENERGY SYSTEM CORP 19979 655 365
2016 OHIO VALLEY ENERGY SYSTEM CORP 9437 178 365
2017 OHIO VALLEY ENERGY SYSTEM CORP 10012 541 365
2018 OHIO VALLEY ENERGY SYSTEM CORP 9056 419 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 113
2013 OHIO VALLEY ENERGY SYSTEM CORP Brine 584 365
2014 OHIO VALLEY ENERGY SYSTEM CORP Brine 541 365
2015 OHIO VALLEY ENERGY SYSTEM CORP Brine 290 365
2016 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2017 OHIO VALLEY ENERGY SYSTEM CORP Brine 213 365
2018 OHIO VALLEY ENERGY SYSTEM CORP Brine 250 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0235017535 2011-10-05 Urban Drill / Deepen / Reopen No Violations Wildcat Drilling is moving on location and will spud the well later today. No violations at this time.
0445920232 2011-10-25 Urban Drill / Deepen / Reopen No Violations The drilling pits have been solidified and covered over. No violations at this time.
0772205744 2012-07-10 Preliminary Restoration No Violations Preliminary Restoration is approved.
1087891842 2012-01-25 Urban Drill / Deepen / Reopen No Violations The well and the tank battery have been completed and the security barriers have been set around the well. The salesline is being installed and the well will be turned on after its completion. No violations at this time.
1092112067 2011-10-12 Urban Drill / Deepen / Reopen No Violations Wildcat is drilling at 3800 feet. They should TD the well within 48 hours. The pits are fenced, lined and in good condition.
1321366504 2011-11-08 Urban Drill / Deepen / Reopen No Violations Producers Services was on site to frac the well. There were no indications of well construction problems and the job was completed as planned. No violations at this time.
1567732515 2011-10-31 Urban Drill / Deepen / Reopen No Violations Frac tanks have been moved on location in anticipation of perforating and fracing the well in the near future.
2081990623 2012-01-18 Urban Drill / Deepen / Reopen No Violations The tank battery is under construction and the security fence poles have been set. Waiting for the meter to be set before turn on is possible. I called Ted Hill and requested that the safety bollards be installed around the wellhead as soon as possible.

For data sources see[9]

References