Difference between revisions of "34-133-24407"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-133-24407
 
| Well ID: 34-133-24407
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.10800273, -81.05853297 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.107932003, -81.05861278 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Portage County, Ohio|Portage]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[PANDER RAY TRUCKING INC]]
+
| County: [[Portage_County,_Ohio|Portage]]
 +
|-
 +
| Municipality: [[Palmyra_Township,_Portage_County,_Ohio|Palmyra Township]]
 +
|-
 +
| Operator Name: [[WAYNE  HAMMOND ENTERPRISES INC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: PANDER UNIT
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2011-03-02
 
|-
 
|-
 
| Spud Date: 2011-05-17
 
| Spud Date: 2011-05-17
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[WILDCAT DRILLING]]
 
|-
 
|-
| Configuration: Vertical
+
| Final Drill Date: 2011-05-24
 
|-
 
|-
| Well Status: Producing
+
| Well Total Depth: 7629 ft
 
|-
 
|-
| Violations: 0
+
| Configuration: Vertical
 
|-
 
|-
| Latitude: 41.10800273
+
| Latitude: 41.107932003
|-
 
| Longitude: -81.05853297
 
 
|-
 
|-
 +
| Longitude: -81.05861278
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Well Status
!scope="col" | GAS QUANTITY
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comment
!scope="col" | CONDENSATE QUANTITY
+
|-
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| APP
!scope="col" | OIL QUANTITY
+
| 2011-03-02
!scope="col" | OIL PRODUCTION DAYS
+
| Proposed Formations:ROSE RUN, Issued Date:3/2/2011, Expired Date:3/1/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
 
|-
 
|-
| 2012-0
+
| Reached Total Depth
| style="text-align:right;" | 0.0
+
| 2011-05-24
 
|  
 
|  
 +
|-
 +
| Correction to Well
 +
| 2011-07-22
 +
| CHANGE IN PROPOSED GEOLOGICAL FORMATION: NOW "CLINTON/ROSE RUN".
 +
|-
 +
| Construction Permit Expires
 +
| 2013-03-01
 
|  
 
|  
 +
|-
 +
| Completion Report Received
 +
| 2014-09-29
 
|  
 
|  
| style="text-align:right;" | 1262.0
+
|-
 +
| Change of Owner
 +
| 2016-01-04
 +
| Operator changed from 1258, RAY PANDER TRUCKING INC to 778, WAYNE  HAMMOND ENTERPRISES INC
 +
|-
 +
| Record Last Modified
 +
| 2017-10-23
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Well and WellHistry Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2019-05-21 }}</ref>
== Inspection Data ==
+
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2014-09-05
 +
| style="text-align: right;" | 7364
 +
| style="text-align: right;" | 7414
 +
| style="text-align: right;" | 74
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2019-05-07
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | VIOLATION CODE
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | VIOLATION COMMENT
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 1261765942
+
| 2011-11-16
| 2011-11-10
+
| ACID
|  
+
| style="text-align: right;" | 20
| I witnessed a partial run of the bond log by Phoenix Well Service LLC.  Tom Wood was on location.  There were no violations at this time.
+
| style="text-align: right;" | 2500 Gal
|  
+
| style="text-align: right;" | 0
|  
+
| [[Universal Well Services Inc.]]
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| 1305741313
+
| 2012
| 2011-05-17
+
| [[WAYNE  HAMMOND ENTERPRISES INC]]
|  
+
| style="text-align: right;" | 0
| Chris Grimm, Ray Wallace and myself witnessed the cementing of the 11 3/4 conductor pipe on Wildcat rig #1.  Universal preformed the cementing.  There were no violations at this time.
+
| style="text-align: right;" | 1262
|  
+
| style="text-align: right;" | 366
|  
 
|  
 
 
|-
 
|-
 +
| 2013
 +
| [[WAYNE  HAMMOND ENTERPRISES INC]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 1305742233
+
| 2015
| 2011-05-18
+
| [[WAYNE  HAMMOND ENTERPRISES INC]]
|  
+
| style="text-align: right;" | 0
| I witnessed the cementing of the 8 5/8 casing.  There were no violations at this time.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
|  
 
|  
 
 
|-
 
|-
 +
| 2016
 +
| [[WAYNE  HAMMOND ENTERPRISES INC]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 1306255770
+
| 2017
| 2011-05-24
+
| [[WAYNE  HAMMOND ENTERPRISES INC]]
|  
+
| style="text-align: right;" | 0
| I performed a rig inspection on Wildcat rig #1.  The drilling depth was 7418' and drilling on fluid.  The zone that they were in was the Rose Run. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
|  
 
|  
 
 
|-
 
|-
 +
| 2018
 +
| [[WAYNE  HAMMOND ENTERPRISES INC]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 1307549516
+
|}
| 2011-06-06
+
For data sources see<ref>{{cite web
|  
+
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
| The drilling and blow pits fluid level were down 4 feet from the surfaceThe rig is gone and debris hauled awayThere were no violations at this time.
+
|publisher = [[Ohio Department of Natural Resources]]
|  
+
| date =  2019-05-07
|  
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
|  
+
  | accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
 +
| 2012
 +
| [[WAYNE  HAMMOND ENTERPRISES INC]]
 +
| Brine
 +
| style="text-align: right;" | 3906
 +
| style="text-align: right;" | 366
 
|-
 
|-
| 1309482463
+
| 2013
| 2011-06-23
+
| [[WAYNE  HAMMOND ENTERPRISES INC]]
|  
+
| Brine
| On May 25, Universal completed a two stage cement job on this well. The primary cement job successfully covered the Rose Run to Black River interval as designed. The second stage encountered circulation problems which raised concerns about the cement coverage. On June 23, Phoenix Well Services ran a cement bond log which indicated that the second stage cementing only covered the DV tool set at 4820' (near the top of the Queenston) to the bottom of the Packer Shell (4570'). Phoenix perforated the 4-1/2 casing with 8 shots from 4568' to 4570'. Universal broke circulation at 1400 psi and pumped 30 bbl of fresh water ahead which lowered the pressure to 570 psi. Universal then mixed and pumped 500 gallons of Unisweep, 600# of calcium chloride and 800# of Flo-stop P before mixing and displacing 350 sacks of 50/50 pozmix with 2% gel, 10% salt and 0.75# TI-2. Circulation was maintained throughout the job. Displace to 4518' with plug down at 12:27 pm on 6/23/2011.
+
| style="text-align: right;" | 873
|  
+
| style="text-align: right;" | 0
|  
 
|  
 
 
|-
 
|-
 +
| 2015
 +
| [[WAYNE  HAMMOND ENTERPRISES INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| -1654647507
+
| 2016
| 2011-06-09
+
| [[WAYNE  HAMMOND ENTERPRISES INC]]
|  
+
| Brine
| I met with Tom Wood, Ray Pander and RC Pander at the drilling location to witness a the running of the bond log.  The logging company was Phoenix Well Services from Delmont PA. The top of the cement was 4580' which is at the base of the Packer Shell.  There were no violations at this time.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
|  
 
|  
 
 
|-
 
|-
 +
| 2017
 +
| [[WAYNE  HAMMOND ENTERPRISES INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| -1656830425
+
| 2018
| 2011-05-16
+
| [[WAYNE  HAMMOND ENTERPRISES INC]]
|  
+
| Brine
| Chris Grimm, John Brauer and myself preformed a rig inspection.  The drilling rig, Wildcat rig #1 has arrived on the drilling location.  The drilling pits have not been dug yet.  There were no violations at this time.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
|  
 
|  
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
|-
| -390705618
+
| 0390705618
 
| 2011-05-17
 
| 2011-05-17
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Chris Grimm, Ray Wallace and myself preformed a rig inspection on Wildcat rig #1.  The rig crew were circulating the 11 3/4 conductor pipe.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 
| Chris Grimm, Ray Wallace and myself preformed a rig inspection on Wildcat rig #1.  The rig crew were circulating the 11 3/4 conductor pipe.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| 665420439
+
| 0665420439
 
| 2011-05-19
 
| 2011-05-19
|  
+
| Drill / Deepen /  Reopen
| I performed a rig inspection on Wildcat rig #1.  The drilling depth was 1848' and drilling on air in the shale.  I wavied witnessing the BOP test.  The BOP was tested to 575psi and lost 8psi in 20 minutes. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
+
| No Violations
|
+
| I performed a rig inspection on Wildcat rig #1.  The drilling depth was 1848 and drilling on air in the shale.  I wavied witnessing the BOP test.  The BOP was tested to 575psi and lost 8psi in 20 minutes. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
|
 
|
 
 
|-
 
|-
|-
+
| 0674688489
| -674688489
 
 
| 2011-05-18
 
| 2011-05-18
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| I preformed a rig inspection on Wildcat rig #1.  The rig crew were running into the hole with 8 5/8 casing.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 
| I preformed a rig inspection on Wildcat rig #1.  The rig crew were running into the hole with 8 5/8 casing.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 0705104514
| -705104514
 
 
| 2011-06-30
 
| 2011-06-30
|  
+
| Completion Testing
 +
| No Violations
 
| Chris Grimm and myself witnessed the bond log ran by Phoenix Well Services.  Tom Wood and Ray Pander were also present.  There were no violations at this time.
 
| Chris Grimm and myself witnessed the bond log ran by Phoenix Well Services.  Tom Wood and Ray Pander were also present.  There were no violations at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -744386438
+
| 0744386438
 
| 2011-12-13
 
| 2011-12-13
|  
+
| Preliminary Restoration
 +
| No Violations
 
| All drilling pits are closed.  One top soil pile has been spread on the drilling location.  There were no violations at this time.
 
| All drilling pits are closed.  One top soil pile has been spread on the drilling location.  There were no violations at this time.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0867757163
 +
| 2011-08-02
 +
| Preliminary Restoration
 +
| No Violations
 +
| The drilling pits were closed. The workover has not started.  I went to Panders office and spoke with RC about well status.  He stated that he is talking with Tom Tomasick about opening up the Newburg.  Tom wanted more information on the Newburg formation.  There were no violations at this time.
 +
|-
 +
| 1261765942
 +
| 2011-11-10
 +
| Completion Testing
 +
| No Violations
 +
| I witnessed a partial run of the bond log by Phoenix Well Service LLC.  Tom Wood was on location.  There were no violations at this time.
 +
|-
 +
| 1305741313
 +
| 2011-05-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Chris Grimm, Ray Wallace and myself witnessed the cementing of the 11 3/4 conductor pipe on Wildcat rig #1.  Universal preformed the cementing.  There were no violations at this time.
 +
|-
 +
| 1305742233
 +
| 2011-05-18
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I witnessed the cementing of the 8 5/8 casing.  There were no violations at this time.
 +
|-
 +
| 1306255770
 +
| 2011-05-24
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I performed a rig inspection on Wildcat rig #1.  The drilling depth was 7418 and drilling on fluid.  The zone that they were in was the Rose Run. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 +
|-
 +
| 1307549516
 +
| 2011-06-06
 +
| Preliminary Restoration
 +
| No Violations
 +
| The drilling and blow pits fluid level were down 4 feet from the surface.  The rig is gone and debris hauled away.  There were no violations at this time.
 +
|-
 +
| 1309482463
 +
| 2011-06-23
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| On May 25, Universal completed a two stage cement job on this well. The primary cement job successfully covered the Rose Run to Black River interval as designed. The second stage encountered circulation problems which raised concerns about the cement coverage. On June 23, Phoenix Well Services ran a cement bond log which indicated that the second stage cementing only covered the DV tool set at 4820 (near the top of the Queenston) to the bottom of the Packer Shell (4570). Phoenix perforated the 4-1/2 casing with 8 shots from 4568 to 4570. Universal broke circulation at 1400 psi and pumped 30 bbl of fresh water ahead which lowered the pressure to 570 psi. Universal then mixed and pumped 500 gallons of Unisweep, 600# of calcium chloride and 800# of Flo-stop P before mixing and displacing 350 sacks of 50/50 pozmix with 2% gel, 10% salt and 0.75# TI-2. Circulation was maintained throughout the job. Displace to 4518 with plug down at 12:27 pm on 6/23/2011.
 +
|-
 +
| 1654647507
 +
| 2011-06-09
 +
| Completion Testing
 +
| No Violations
 +
| I met with Tom Wood, Ray Pander and RC Pander at the drilling location to witness a the running of the bond log.  The logging company was Phoenix Well Services from Delmont PA. The top of the cement was 4580 which is at the base of the Packer Shell.  There were no violations at this time.
 
|-
 
|-
| -867757163
+
| 1656830425
| 2011-08-02
+
| 2011-05-16
|  
+
| Drill / Deepen /  Reopen
| The drilling pits were closed. The workover has not started.  I went to Pander's office and spoke with RC about well status.  He stated that he is talking with Tom Tomasick about opening up the NewburgTom wanted more information on the Newburg formation.  There were no violations at this time.
+
| No Violations
|
+
| Chris Grimm, John Brauer and myself preformed a rig inspection.  The drilling rig, Wildcat rig #1 has arrived on the drilling locationThe drilling pits have not been dug yet.  There were no violations at this time.
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 04:04, 31 July 2019

Well Details

Well ID: 34-133-24407
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Palmyra Township
Operator Name: WAYNE HAMMOND ENTERPRISES INC
Well Pad ID:
Farm/Lease Name: PANDER UNIT
License Status: Producing
License Date: 2011-03-02
Spud Date: 2011-05-17
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2011-05-24
Well Total Depth: 7629 ft
Configuration: Vertical
Latitude: 41.107932003
Longitude: -81.05861278

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-03-02 Proposed Formations:ROSE RUN, Issued Date:3/2/2011, Expired Date:3/1/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2011-05-24
Correction to Well 2011-07-22 CHANGE IN PROPOSED GEOLOGICAL FORMATION: NOW "CLINTON/ROSE RUN".
Construction Permit Expires 2013-03-01
Completion Report Received 2014-09-29
Change of Owner 2016-01-04 Operator changed from 1258, RAY PANDER TRUCKING INC to 778, WAYNE HAMMOND ENTERPRISES INC
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-09-05 7364 7414 74

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-11-16 ACID 20 2500 Gal 0 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 WAYNE HAMMOND ENTERPRISES INC 0 1262 366
2013 WAYNE HAMMOND ENTERPRISES INC 0 0 0
2015 WAYNE HAMMOND ENTERPRISES INC 0 0 0
2016 WAYNE HAMMOND ENTERPRISES INC 0 0 0
2017 WAYNE HAMMOND ENTERPRISES INC 0 0 0
2018 WAYNE HAMMOND ENTERPRISES INC 0 0 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 WAYNE HAMMOND ENTERPRISES INC Brine 3906 366
2013 WAYNE HAMMOND ENTERPRISES INC Brine 873 0
2015 WAYNE HAMMOND ENTERPRISES INC Brine 0 0
2016 WAYNE HAMMOND ENTERPRISES INC Brine 0 0
2017 WAYNE HAMMOND ENTERPRISES INC Brine 0 0
2018 WAYNE HAMMOND ENTERPRISES INC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0390705618 2011-05-17 Drill / Deepen / Reopen No Violations Chris Grimm, Ray Wallace and myself preformed a rig inspection on Wildcat rig #1. The rig crew were circulating the 11 3/4 conductor pipe. This inspection satisfies 1501:9-9-03. There were no violations at this time.
0665420439 2011-05-19 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The drilling depth was 1848 and drilling on air in the shale. I wavied witnessing the BOP test. The BOP was tested to 575psi and lost 8psi in 20 minutes. This inspection satisfies 1501:9-9-03. There were no violations at this time.
0674688489 2011-05-18 Drill / Deepen / Reopen No Violations I preformed a rig inspection on Wildcat rig #1. The rig crew were running into the hole with 8 5/8 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time.
0705104514 2011-06-30 Completion Testing No Violations Chris Grimm and myself witnessed the bond log ran by Phoenix Well Services. Tom Wood and Ray Pander were also present. There were no violations at this time.
0744386438 2011-12-13 Preliminary Restoration No Violations All drilling pits are closed. One top soil pile has been spread on the drilling location. There were no violations at this time.
0867757163 2011-08-02 Preliminary Restoration No Violations The drilling pits were closed. The workover has not started. I went to Panders office and spoke with RC about well status. He stated that he is talking with Tom Tomasick about opening up the Newburg. Tom wanted more information on the Newburg formation. There were no violations at this time.
1261765942 2011-11-10 Completion Testing No Violations I witnessed a partial run of the bond log by Phoenix Well Service LLC. Tom Wood was on location. There were no violations at this time.
1305741313 2011-05-17 Drill / Deepen / Reopen No Violations Chris Grimm, Ray Wallace and myself witnessed the cementing of the 11 3/4 conductor pipe on Wildcat rig #1. Universal preformed the cementing. There were no violations at this time.
1305742233 2011-05-18 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 5/8 casing. There were no violations at this time.
1306255770 2011-05-24 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The drilling depth was 7418 and drilling on fluid. The zone that they were in was the Rose Run. This inspection satisfies 1501:9-9-03. There were no violations at this time.
1307549516 2011-06-06 Preliminary Restoration No Violations The drilling and blow pits fluid level were down 4 feet from the surface. The rig is gone and debris hauled away. There were no violations at this time.
1309482463 2011-06-23 Drill / Deepen / Reopen No Violations On May 25, Universal completed a two stage cement job on this well. The primary cement job successfully covered the Rose Run to Black River interval as designed. The second stage encountered circulation problems which raised concerns about the cement coverage. On June 23, Phoenix Well Services ran a cement bond log which indicated that the second stage cementing only covered the DV tool set at 4820 (near the top of the Queenston) to the bottom of the Packer Shell (4570). Phoenix perforated the 4-1/2 casing with 8 shots from 4568 to 4570. Universal broke circulation at 1400 psi and pumped 30 bbl of fresh water ahead which lowered the pressure to 570 psi. Universal then mixed and pumped 500 gallons of Unisweep, 600# of calcium chloride and 800# of Flo-stop P before mixing and displacing 350 sacks of 50/50 pozmix with 2% gel, 10% salt and 0.75# TI-2. Circulation was maintained throughout the job. Displace to 4518 with plug down at 12:27 pm on 6/23/2011.
1654647507 2011-06-09 Completion Testing No Violations I met with Tom Wood, Ray Pander and RC Pander at the drilling location to witness a the running of the bond log. The logging company was Phoenix Well Services from Delmont PA. The top of the cement was 4580 which is at the base of the Packer Shell. There were no violations at this time.
1656830425 2011-05-16 Drill / Deepen / Reopen No Violations Chris Grimm, John Brauer and myself preformed a rig inspection. The drilling rig, Wildcat rig #1 has arrived on the drilling location. The drilling pits have not been dug yet. There were no violations at this time.

For data sources see[9]