X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-20926"

m
m
Line 11: Line 11:
 
| County: [[Portage_County,_Ohio|Portage]]
 
| County: [[Portage_County,_Ohio|Portage]]
 
|-
 
|-
| Municipality: [[Freedom Township,_Portage_County,_Ohio|Freedom Township]]
+
| Municipality: [[Freedom_Township,_Portage_County,_Ohio|Freedom Township]]
 
|-
 
|-
 
| Operator Name: [[GILBERT G TIM & WALTER J]]
 
| Operator Name: [[GILBERT G TIM & WALTER J]]

Revision as of 20:22, 31 August 2019

Well Details

Well ID: 34-133-20926
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Freedom Township
Operator Name: GILBERT G TIM & WALTER J
Well Pad ID:
Farm/Lease Name: HUBERSON HARRY E
License Status: Domestic Well
License Date: 1976-10-27
Spud Date: 1977-03-19
Spud Drilling Contractor:
Final Drill Date: 1977-03-27
Well Total Depth: 4505 ft
Configuration: Vertical
Latitude: 41.222330326
Longitude: -81.18113540

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1976-10-26 504 UNITED PETROLEUM CORP GeoDate 10/26/76
Original Spud 1977-03-19 R.L. 11-24-76 IP. OIL = 1/2 BBL.
Completed 1977-03-27 R.L. 11-24-76 IP. OIL = 1/2 BBL.
Reached Total Depth 1977-03-27 R.L. 11-24-76 IP. OIL = 1/2 BBL.
CO 1979-04-01 84 EVERFLOW EASTERN PTNS L P GeoDate 10/26/76
CO 1994-06-07 4837 GILBERT G TIM & WALTER J GeoDate 10/26/76
Record Last Modified 2009-12-11 R.L. 11-24-76 IP. OIL = 1/2 BBL.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4405 4444 15

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 179500 0 SCF N2
H2O 0 98000 Gal 60000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PTNS L P 2302 1787 275
1986 EVERFLOW EASTERN PTNS L P 947 875 365
1987 EVERFLOW EASTERN PTNS L P 502 824 365
1988 EVERFLOW EASTERN PTNS L P 253 623 365
1989 EVERFLOW EASTERN PTNS L P 16 648 365
1990 EVERFLOW EASTERN PTNS L P 0 477 365
1991 EVERFLOW EASTERN PTNS L P 0 372 365
1992 EVERFLOW EASTERN PTNS L P 0 561 365
1993 EVERFLOW EASTERN PTNS L P 0 465 365
1994 EVERFLOW EASTERN PTNS L P 0 206 365
1995 EVERFLOW EASTERN PTNS L P 0 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PTNS L P Brine 2593 275
1986 EVERFLOW EASTERN PTNS L P Brine 1131 365
1987 EVERFLOW EASTERN PTNS L P Brine 1492 365
1988 EVERFLOW EASTERN PTNS L P Brine 1381 365
1989 EVERFLOW EASTERN PTNS L P Brine 1567 365
1990 EVERFLOW EASTERN PTNS L P Brine 911 365
1991 EVERFLOW EASTERN PTNS L P Brine 604 365
1992 EVERFLOW EASTERN PTNS L P Brine 1915 365
1993 EVERFLOW EASTERN PTNS L P Brine 1488 365
1994 EVERFLOW EASTERN PTNS L P Brine 390 365
1995 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

References