If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Noble_County,_Ohio|Noble]] | | County: [[Noble_County,_Ohio|Noble]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Noble Township,_Noble_County,_Ohio|Noble Township]] |
|- | |- | ||
| Operator Name: [[NORTHWOOD ENERGY CORP]] | | Operator Name: [[NORTHWOOD ENERGY CORP]] |
Well ID: 34-121-21668 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.752808622,"lon":-81.5678393,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Noble Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: GORDON | |
License Status: Producing | |
License Date: 2009-10-05 | |
Spud Date: 2009-11-06 | |
Spud Drilling Contractor: DAVIS DRLG | |
Final Drill Date: 1973-12-04 | |
Well Total Depth: 4250 ft | |
Configuration: Vertical | |
Latitude: 39.752808622 | |
Longitude: -81.56783930 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1973-11-25 | OTD: 5756' IN CLINTON |
Completed | 1973-12-04 | OTD: 5756' IN CLINTON |
Reached Total Depth | 1973-12-04 | OTD: 5756' IN CLINTON |
CO | 1991-03-15 | 213 LOMAK OPERATING CO |
CO | 1992-10-13 | 1634 NORTHWOOD ENERGY CORP GeoDate |
APP | 2009-10-05 | Proposed Formations:BEREA THRU ORISKANY, Issued Date:10/5/2009, Expired Date:10/5/2010 6:00:00 AM, Drilling unit acres:95, Proposed Well Type:OG, Proposed Well Class:EOUT |
Plugged Back | 2009-11-17 | OTD: 5756' IN CLINTON |
Completion Report Received | 2010-06-15 | OTD: 5756' IN CLINTON |
Construction Permit Expires | 2010-10-05 | OTD: 5756' IN CLINTON |
Record Last Modified | 2017-10-24 | OTD: 5756' IN CLINTON |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-09-01 | 1742 | 2260 | 152 |
2010-09-01 | 5596 | 5652 | 0 |
2006-09-11 | 5650 | 5652 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 157829 Gal | 250000 | 500 GALLONS HCL ACID | ||
0 | 0 | 0 | R.P. 24 HRS. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ALAMCO | 2029 | 0 | 0 |
1986 | ALMCO INC | 3267 | 0 | 357 |
1987 | ALMCO INC | 1911 | 0 | 360 |
1988 | ALMCO INC | 1407 | 0 | 360 |
1992 | RANGE OPERATING COMPANY | 23 | 0 | 60 |
2006 | NORTHWOOD ENERGY CORP | 362 | 0 | 365 |
2007 | NORTHWOOD ENERGY CORP | 745 | 0 | 365 |
2008 | NORTHWOOD ENERGY CORP | 690 | 0 | 365 |
2009 | NORTHWOOD ENERGY CORP | 506 | 0 | 365 |
2010 | NORTHWOOD ENERGY CORP | 2412 | 456 | 365 |
2011 | NORTHWOOD ENERGY CORP | 1064 | 119 | 0 |
2012 | NORTHWOOD ENERGY CORP | 983 | 61 | 366 |
2013 | NORTHWOOD ENERGY CORP | 876 | 33 | 365 |
2014 | NORTHWOOD ENERGY CORP | 524 | 74 | 365 |
2015 | NORTHWOOD ENERGY CORP | 291 | 0 | 365 |
2016 | NORTHWOOD ENERGY CORP | 256 | 66 | 365 |
2017 | NORTHWOOD ENERGY CORP | 156 | 61 | 365 |
2018 | NORTHWOOD ENERGY CORP | 231 | 26 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ALAMCO | Brine | 0 | 0 |
1986 | ALMCO INC | Brine | 0 | 357 |
1987 | ALMCO INC | Brine | 0 | 360 |
1988 | ALMCO INC | Brine | 0 | 360 |
1992 | RANGE OPERATING COMPANY | Brine | 0 | 60 |
2006 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2007 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2008 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2009 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2010 | NORTHWOOD ENERGY CORP | Brine | 919 | 365 |
2011 | NORTHWOOD ENERGY CORP | Brine | 111 | |
2012 | NORTHWOOD ENERGY CORP | Brine | 52 | 366 |
2013 | NORTHWOOD ENERGY CORP | Brine | 18 | 365 |
2014 | NORTHWOOD ENERGY CORP | Brine | 39 | 365 |
2015 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2016 | NORTHWOOD ENERGY CORP | Brine | 7 | 365 |
2017 | NORTHWOOD ENERGY CORP | Brine | 30 | 365 |
2018 | NORTHWOOD ENERGY CORP | Brine | 25 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1252445296 | 2009-11-06 | Plug / Plug Back | No Violations | On site to witnesssetting of bottom hole plug,well is equipped with 8 surface casing and 4.5 production casing and 1-100 bbl tank and seperator located in dike area,well is located in old mine works area. |
1264246236 | 2012-01-18 | Production Wells | No Violations | Follow up inspection for the purpose of confirming correction to well permit number on production tank. |
1326446116 | 2012-01-12 | Preliminary Restoration | No Violations | Inspection found at wellhead 1.5 tubing with production valves open and small pumping unit in place-all pits filled and site vegetation established -production tank consists of a single 210bbl ,dike appeared to be established . |
1326975182 | 2012-01-18 | Production Wells | No Violations | Follow up inspection for the purpose of confirming correction to well permit number on production tank . |
1597739902 | 2012-01-12 | Preliminary Restoration | No Violations | Inspection found at wellhead 1.5 tubing with production valves open and small pumping unit in place-all pits filled and site vegetation established -production tank consists of a single 210bbl, dike appeared to be established. |
For data sources see[9]