If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24434 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.57,"lon":-81.02,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Jackson Township | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: MINGER | |
License Status: Producing | |
License Date: 2013-11-20 | |
Spud Date: 2013-11-25 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2013-12-08 | |
Well Total Depth: 3066.00 ft | |
Configuration: Vertical | |
Latitude: 39.570000 | |
Longitude: -81.020000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-20 | Proposed Formations:BEREA-30 FOOT-GORDON, Issued Date:11/20/2013, Expired Date:11/20/2015 12:00:00 PM, Drilling unit acres:56.18, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-12-08 | |
Completion Report Received | 2015-11-13 | |
Construction Permit Expires | 2015-11-20 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-11-16 | 2526 | 2566 | 14 |
2015-11-16 | 2716 | 2578 | 18 |
2526 | 2566 | 14 | |
2716 | 2578 | 18 | |
2862 | 2882 | 5 | |
2526 | 2566 | 14 | |
2015-11-16 | 2862 | 2882 | 5 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-04-30 | H2O | 0 | 100057 Gal | 0 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | BECK ENERGY CORPORATION | 2441.00 | 214.00 | 170 |
2015 | BECK ENERGY CORPORATION | 2275.00 | 90.00 | 365 |
2016 | BECK ENERGY CORPORATION | 1215.00 | 59.00 | 365 |
2017 | BECK ENERGY CORPORATION | 1017.00 | 60.00 | 365 |
2018 | BECK ENERGY CORPORATION | 1058.00 | 36.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | BECK ENERGY CORPORATION | Brine | 325 | 170 |
2015 | BECK ENERGY CORPORATION | Brine | 78 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 36 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 34 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 58 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1386255931 | 2013-12-05 | Casing String Witnessed | No Violations | On 12/05/13 1144 of 7 surface was set and cemented back to surface by Universal Well Service using 200 sacks of class A 3% calcium cement with 20 barrels of cement returns to surface and the casing being pressure tested to 1035 psi with a landing pressure of 625 psi. |
1489592630 | 2017-03-15 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control in place and vegetation established. The well is equipped with 4.5 diameter production casing and 1.5 diameter production tubing with both casing and tubing well heads present, flow lines are attached to both the casing and tubing well heads with the production valves in the open position. On location near the well head is the production facility consisting of (2) 100 barrel capacity production tanks along with a mechanical separator and gas sales meter with a current sales chart present tin the meter. Proper well identification is posted and a earthen dike is present around the production facility. |
For data sources see[9]