If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-093-20086 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.4689316571,"lon":-81.984109029,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1936-06-03 | |
Unconventional: | |
Horizontal: | |
Producing: | |
Violations: 0 | |
Latitude: 41.4689316571 | |
Longitude: -81.984109029 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1268419811 | 2010-03-12 | Met with Tim Carter, Project Engineer, with Donley's. He represents the Cleveland Clinic. 400' NE of new hospital foundation is a abandoned Clinton well. Last known owner was Dempsay in 1936. It is shut in on 3 casing and has valve attached. No leakage at this time. It has 10, 5 and 3 in well. Cement has been poured between annular spaces. The well record is attached to file. Accsess to the well will be thru main entrance and off of a new parking lot for the new hospital. I mailed an application to Tim Carter and explained the program to him and associates. Area is under construction at this time. No well owner found in search. | ||||
1294951920 | 2014-05-01 | Visited location on 05/01/2014 to meet with architect Tim Lannon, who is working on the Cleveland Clinic expansion project. The well is located ~8" from the curb in the northwest corner of the parking lot. At one point the well likely stuck out of the ground, but as the area around the well was built up ~6' in order to construct the parking lot, all that can be seen of the well is a 3" diameter steel pipe which sticks out of the ground ~6" with a plug on top. An open ended, ~1.5" diameter steel pipe is sticking up ~8" from the well. Occasional whiffs of gas were noted at the time of the inspection. Mr. Lannon was provided with information regarding well ownership and plugging procedures (should the Cleveland Clinic choose to plug the well themselves) and information regarding the orphan well program (should they choose to wait and allow the orphan well program to plug it). | ||||
245340248 | 2010-02-12 | Requested by Ron Gibson to locate well and set plugging procedure. Cleveland Clinic purchased property and wants to expand. Will pay for plugging of old Clinton gas well. Well was drilled by Ohio Fuel Gas. Snow, 25 degrees. |