If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20799 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.27,"lon":-80.79,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001599 | |
Farm/Lease Name: BUDDY SMF JF | |
License Status: Producing | |
License Date: 2018-12-28 | |
Spud Date: 2019-01-10 | |
Spud Drilling Contractor: | |
Final Drill Date: 2019-03-14 | |
Well Total Depth: 23151.00 ft | |
Configuration: Horizontal | |
Latitude: 40.270000 | |
Longitude: -80.790000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-12-28 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/28/2018, Expired Date:12/27/2020 12:00:00 PM, Drilling unit acres:634.878, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2019-01-11 | CORRECTION TO CASING PLAN PER OWNER REQUEST. |
Record Last Modified | 2019-01-18 | |
Construction Permit Expires | 2020-12-27 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
9931 | 23032 | 0 | |
9931 | 23032 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1073297792 | 2019-6-4 0:00:0 | CT | No Violations | 1.00 |
-1201421211 | 2020-1-28 0:00: | PW | No Violations | 1.00 |
-357011213 | 2019-5-7 0:00:0 | CT | No Violations | 1.00 |
-805046582 | 2019-5-15 0:00: | CT | No Violations | 1.00 |
-993762447 | 2019-6-27 0:00: | CT | No Violations | |
0132704222 | 2019-01-28 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 22 inch diameter open hole to a depth of 273 feet. They lost ~70% air returns during drilling. Previous casing set and cemented was 24 inch diameter conductor casing to a depth of 100 feet ground level. Wyoming Casing ran 269 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot, with 2 foot stick up. Shoe track is 23.5 feet long. Cement Baskets were set at 185 feet. Void encountered from 211-223 feet. All depths are based off of a 12 foot KB. CJ/Otex was onsite with 250 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 75 barrels of fresh water. 35 barrels of gel pumped ahead of cement. No cement returned to surface on conventional job. Top out was completed with an additonal 517 sacks of cement pumped through 1 inch diameter tubing. 10 barrels of cement returned to surface. |
0357011213 | 2019-05-07 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location. They are tied into Omaits 1H, 3H, and Buddy 5H, 7H wells. Wireline is setting plug and perforating stage 10/76 on this well. Stage 10 plug set at 21567, with bottom perforation at 21555 and top perforation at 21416. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 320 psi. |
0787511314 | 2019-01-13 | Drill / Deepen / Reopen | No Violations | PAD ADDRESS: 81 CR 10, dillonvale. On the day of my inspection I witnessed that on 1/11/19 Precision rathole had augured a 30 inch diameter hole to 100 feet. 103 feet of 24 inch diameter conductor casing was run. Drillers said hole was basically dry. Petroset was onsite and cemented the well with 250 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50 percent excess ran. Cement was displaced to 90 feet with 47 barrels of fresh water. 14 barrels of cement returned to surface. 10 feet of cement left in the casing. I did not witness the cement job, just that it was completed. |
0805046582 | 2019-05-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew is on location tied into the buddy 5H and 7H and omaits 1H and 3H wells. FTS is pumping stage 18/76. Stage 18 plug set at 20175 feet, with bottom perforation at 20164 feet and top perforation at 20024 feet. FTS pumped 48 barrels of 7.5% HCl, 4925 barrels of clean fluid, 40700 lbs of 100 mesh sand, and 189240 lbs of 40/70 mesh sand. Total sand pumped was 229940 lbs. Maximum treating pressure was 11622 psi and average treating pressure was 11027 psi. Maximum rate was 75.7 barrels per minute (BPM) and average rate was 73.5 bpm. Break down pressure was 7723 psi. Initial shut in pressure (ISIP) was 6384. 5 minute ISIP was 5822. Frac gradient of 1.11 psi/ft. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 680 psi. |
0818498447 | 2019-02-04 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1555 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 267 feet. Wyoming casing ran 1544 feet of 13.375 inch diameter casing, j-55, 54.5 lbs/foot with 2 foot stick up. Casing was centralized with 13 centralizers. Shoe track is 42 feet long. CJ/Otex was onsite with 1200 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.23. 40% excess ran in open hole. Cement displaced with 228 barrels of fresh water. 35 barrels of gel and 10 barrels of fresh water pumped ahead of cement. 58 barrels of cement returned to surface weighing 15.6 ppg, and floats held with 1.5 barrels back. KB is 12 feet. |
1073297792 | 2019-06-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location tied into the Buddy 5H and 7H and Omaits 1H and 3H wells. Stage 60/76 is beginning frac. Stage 60 plug set at 12867 feet, with bottom perforation at 12855 feet and top perforation at 12715 feet. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 25 psi. |
132704222 | 2019-1-28 0:00: | CS | No Violations | 1.00 |
1479171912 | 2019-8-13 0:00: | PL | No Violations | 1.00 |
1564387273 | 2019-05-21 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location. They are currently tied into the Omaits 1H and 3H, and the Buddy 5H and 7H wells. Stage 30/76 is perforated and awaiting frac. Stage 30 plug set at 18087, with bottom perforation at 18076 and top perforation at 17935. 9.625x5.5 annular pressure is 85 psi. |
522155991 | 2020-1-28 0:00: | PL | No Violations | 1.00 |
787511314 | 2019-1-13 0:00: | DD | No Violations | 2.00 |
818498447 | 2019-2-4 0:00:0 | CS | No Violations | 3.00 |
For data sources see[4]