Well ID: 34-067-21217 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.17,"lon":-81.07,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Athens Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000697 | |
Farm/Lease Name: WAGNER | |
License Status: Producing | |
License Date: 2013-07-08 | |
Spud Date: 2013-11-15 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-12-31 | |
Well Total Depth: 17646.00 ft | |
Configuration: Horizontal | |
Latitude: 40.170000 | |
Longitude: -81.070000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-08 | Proposed Formations:POINT PLEASANT, Issued Date:7/8/2013, Expired Date:7/8/2015 12:00:00 PM, Drilling unit acres:912.254, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-12-31 | |
Completion Report Received | 2015-03-15 | |
Construction Permit Expires | 2015-07-08 | |
Correction to Well | 2015-12-18 | TARGET/TAKEPOINT CHANGE PER AS-DRILLED PLAT-ALE |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/05/2014 | 07/21/2014 | 8605 | 13,641,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | TCA 6038F | X-Chem, LLC | Corossion Inhibitor | Water | 7732-18-5 | 80 | 0.00127888 | 0 |
Methanol | 67-56-1 | 20 | 0.00031972 | 0 | ||||
Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 90.0271 | 0 | |
Scale Clear 112 | Weatherford | Scale Inhibitor | Water | 7732-18-5 | 60 | 0.006036 | 0 | |
Proprietary | Proprietary | 40 | 0.004024 | 0 | ||||
40/70 White | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 9.86118 | 0 | |
Breaker 3l | Weatherford | Breaker | Potassium Chloride | 7447-40-7 | 10 | 0.000922781 | 0 | |
Water | 7732-18-5 | 45 | 0.00415252 | 0 | ||||
Sodium Chlorite | 7758-19-2 | 5 | 0.000461391 | 0 | ||||
Sodium Chloride | 7647-14-5 | 40 | 0.00369112 | 0 | ||||
FRA 405 | Weatherford | Friction Reducer | Alcohol, C12-16, Ethoxilated | 68551-12-2 | 7 | 0.00719239 | 0 | |
Petroleum Distillate | 64742-47-8 | 40 | 0.0410994 | 0 | ||||
Ammonium chloride | 12125-02-9 | 7 | 0.00719239 | 0 | ||||
Sodium Chloride | 7647-14-5 | 10 | 0.0102748 | 0 | ||||
Water | 7732-18-5 | 36 | 0.0369894 | 0 | ||||
Muriatic Acid | Axiall, LLC | Acid | Water | 7732-18-5 | 85 | 0.200115 | 0 | |
Hydrogen chloride | 7647-01-0 | 15 | 0.0353145 | 0 | ||||
BioClear 5000 | Weatherford | Biocide | 2,2-dibromo-3-nitril oprop ionam ide | 10222-01-2 | 5 | 0.00121089 | 0 | |
Water | 7732-18-5 | 95 | 0.0230069 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-07-20 | H2O | 15 | 489451 Gal | 395900 | STINGRAY PRESSURE PUMPING LLC | STAGE 34/34
40 STAGES |
2014-07-05 | H2O | 15 | 432041 Gal | 338140 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/34
40 SHOTS STAGES 2-33 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | 612416 | 6942 | 68 |
2015 | GULFPORT ENERGY CORPORATION | 2264514 | 15059 | 342 |
2016 | GULFPORT ENERGY CORPORATION | 1547361 | 1132 | 362 |
2017 | GULFPORT ENERGY CORPORATION | 933295 | 224 | 364 |
2018 | GULFPORT ENERGY CORPORATION | 664377 | 91 | 361 |
2019 | GULFPORT ENERGY CORPORATION | 138099 | 39 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | Brine | 6647 | 68 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 8179 | 342 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 4816 | 362 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 3199 | 364 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 2449 | 361 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 467 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1441137926 | 2013-11-21 0:00 | DD | No Violations | 3.50 |
-1495758981 | 2014-8-12 0:00: | CT | No Violations | 1.00 |
1351795169 | 2017-09-06 | Preliminary Restoration | No Violations | On the day of my inspection I found the Darla wellpad to contain four properly labeled texas style wellheads. Production equipment includes two horizontal seperators, four gas production units, three 400 barrel steel condensate tanks, three 400 barrel steel brine, a 50 barrel steel brine tank, and a combustor. Tanks are in their own steel containment. Production records current in RBDMS. Site passes preliminary restoration according to ORC 1509.072A. |
1384655625 | 2013-11-16 | Drill / Deepen / Reopen | No Violations | |
1384993661 | 2013-11-20 | Drill / Deepen / Reopen | No Violations | |
1386606249 | 2013-12-09 | Drill / Deepen / Reopen | No Violations
-- | |
1387208355 | 2013-12-16 | Drill / Deepen / Reopen | No Violations | |
1387382980 | 2013-12-18 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Nomac Drilling Rig #310 had reached a total depth of 7440 feet and Franks Casing Crew had just finished running 7440 feet of 9.625 inch 473#/ft. N-80 casing. Singray Cementing LLC was onsite and preparing to do a two stage cement job on the casing. |
1387902240 | 2013-12-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Nomac Drilling Rig #310 had completed their curve and was drilling ahead in the lateral with an 8.5 inch diameter bit on 12lb mud at 9544 feet with a planned td of 17700 feet. Containments were in good shape with all the rain water pumped out and removed from site. Erosion control as requested was in place on the northeast side of the pad. |
1388416265 | 2013-12-30 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Nomac Drilling Rig #310 drilling ahead in the lateral on 12.6 mud at 16998 feet with an estimated td of 17646 feet with 5.5 inch production casing and cementing to follow. Site inspection revealed no violations. |
1388763915 | 2014-01-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Nomac Drilling Rig #310 drilled an 8.5 inch diameter hole to the depth of 17646 feet and Wyoming Casing Crew ran and set 17643 feet of 5.5 inch 23#/ft P-110 casing. Universal Well Service was on site and gained circulation with 70bbls of mud flush and 84bbls of fresh water. Began cementing casing with a lead of 815 sacks of 50/50 Poz cement due to time had to leave. Received phone call at 8:25pm during before the start of the tail cement Universal bulk truck broke down and lead cement had to be flushed back to surface. At that time they went back on mud circulating the hole waiting on new cement and new equipment to arrive and then they were to begin the job again. |
1389021214 | 2014-01-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that the long string cement job was completed yesterday 1/5/14 after unsuccessful job on 1/3/15. Nomac Drilling Rig #310 is skidding back to the Darla 2-22H to drill the lateral. BOP testing will be done this afternoon with drilling out the shoe track to follow. |
1441137926 | 2013-11-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that the spill which was reported last night had been cleaned up. As a cement bulk truck was being spotted the fuel tank came in contact with the metal berm ramp rupturing the tank. 10 gallons of fuel was released, 9 gallons inside containment and 1 gallon outside. Berm repairs are completed and contaminated stone has been removed, placed in roll off container and replaced with fresh stone. No violations. |
1495758981 | 2014-08-12 | Completion Testing | No Violations | I am on site today to check on the containment which is in place for the completion of this well. I checked the liner for leaks or tears and did not find a problem during this inspection. |
1534936910 | 2013-12-11 | Drill / Deepen / Reopen | No Violations |
For data sources see[9]