Well ID: 34-059-24303 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.14,"lon":-81.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Londonderry Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000533 | |
Farm/Lease Name: RIPLEY | |
License Status: Producing | |
License Date: 2013-07-19 | |
Spud Date: 2014-05-14 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-07-18 | |
Well Total Depth: 13975.00 ft | |
Configuration: Horizontal | |
Latitude: 40.140000 | |
Longitude: -81.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-19 | Proposed Formations:POINT PLEASANT, Issued Date:7/19/2013, Expired Date:7/19/2015 12:00:00 PM, Drilling unit acres:625.078, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2014-06-27 | CHANGE IN TARGET INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 623.320 ACRES. |
Reached Total Depth | 2014-07-18 | |
Correction to Well | 2015-01-09 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-06-15 | |
Construction Permit Expires | 2015-07-19 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/07/2014 | 09/21/2014 | 7574 | 12,124,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | OptiKleen-WF(TM) | Halliburton | Concentrate | Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0119976 | 0 |
FE-2A | Halliburton | Additive | Citric acid | 77-92-9 | 60 | 0.00381781 | 0 | |
FRA-407 | Operator | Friction Reducer | Ammonium acetate | 631-61-8 | 5 | 0.0012 | 0 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 40 | 0.00962 | 0 | ||||
Water | 7732-18-5 | 55 | 0.01323 | 0 | ||||
HCl 10% | Halliburton | Solvent | Hydrochloric Acid | 7647-01-0 | 10 | 0.00191065 | 0 | |
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.000863072 | 0 | |
HCl 7.5% | Halliburton | Solvent | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0354148 | 0 | |
HCl 15% | Halliburton | Solvent | Hydrochloric Acid | 7647-01-0 | 15 | 0.014674 | 0 | |
Other Purpose | Ammonium chloride | 12125-02-9 | 0 | 0.00522303 | 0 | |||
Olefins | Confidential | 0 | 0.00003498 | 0 | ||||
Polyacrylate | Confidential | 0 | 0.00720888 | 0 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.000804485 | 0 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 0 | 0.000205493 | 0 | ||||
Formaldehyde | 50-00-0 | 0 | 0.00009881 | 0 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.000804485 | 0 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 0 | 0.000205493 | 0 | ||||
Organic phosphonate | Confidential | 0 | 0.00591646 | 0 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.00402155 | 0 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 0 | 0.00120148 | 0 | ||||
Alcohols ethoxylated | Confidential | 0 | 0.00402155 | 0 | ||||
Olefins | Confidential | 0 | 0.00000700 | 0 | ||||
Inorganic salt | Confidential | 0 | 0.00240296 | 0 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.0241276 | 0 | ||||
Water | 7732-18-5 | 0 | 0.0810335 | 0 | ||||
Fatty acid ester | Confidential | 0 | 0.000240471 | 0 | ||||
Amide | Confidential | 0 | 0.00522303 | 0 | ||||
Fatty acids, tall oil | Confidential | 0 | 0.000205493 | 0 | ||||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 10 | 0.00006908 | 0 | |
Methanol | 67-56-1 | 60 | 0.000410987 | 0 | ||||
Scalechek(R) LP-65 Scale Inhibitor | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.000986368 | 0 | |
FRA-405 | Operator | Friction Reducer | Water | 7732-18-5 | 36 | 0.02879 | 0 | |
Ammonium chloride | 12125-02-9 | 7 | 0.0056 | 0 | ||||
Alcohol, C12-16, Ethoxilated | 68551-12-2 | 7 | 0.0056 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 40 | 0.03199 | 0 | ||||
Sodium Chloride | 7647-14-5 | 10 | 0.008 | 0 | ||||
SAND - PREMIUM WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 10.8437 | 0 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.4197 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Acetic acid | 64-19-7 | 60 | 0.00331238 | 0 | |
Acetic anhydride | 108-24-7 | 100 | 0.00551947 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-09-07 | H2O | 0 | 377230 Gal | 155600 | Halliburton | STAGE 1/31
45 SHOTS STAGES 2-30 |
2014-09-20 | H2O | 8 | 370777 Gal | 156900 | Halliburton | STAGE 31/31
45 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | 63583 | 15047 | 30 |
2015 | GULFPORT ENERGY CORPORATION | 553946 | 111315 | 342 |
2016 | GULFPORT ENERGY CORPORATION | 294464 | 37085 | 347 |
2017 | GULFPORT ENERGY CORPORATION | 192199 | 21181 | 353 |
2018 | GULFPORT ENERGY CORPORATION | 131062 | 14815 | 297 |
2019 | GULFPORT ENERGY CORPORATION | 31919 | 3407 | 88 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | Brine | 4642 | 30 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 13998 | 342 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 3371 | 347 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 1951 | 353 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 2179 | 297 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 294 | 88 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1302053334 | 2016-9-6 0:00:0 | PW | No Violations | 0.20 |
-1820396205 | 2015-1-12 0:00: | PL | No Violations | 0.50 |
-2099071539 | 2014-7-7 0:00:0 | CS | No Violations | |
-234175438 | 2018-5-2 0:00:0 | PW | No Violations | 0.20 |
-25135081 | 2020-10-22 0:00 | PW | No Violations | 1.00 |
-367082164 | 2018-4-19 0:00: | PW | No Violations | 0.20 |
-961929668 | 2017-2-7 0:00:0 | PW | No Violations | 0.30 |
0234175438 | 2018-05-02 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. The production equipment consisted of eight 400 barrel tanks, one 50 barrel tank, a vapor recovery tower, two compressors, a vertical heater treater, a gas combustor, back-up flare stack, a horizontal line heater, a vertical separator, and a sand trap. |
0367082164 | 2018-04-19 | Production Wells | No Violations | The purpose of my inspection was to follow up on a fire that occurred on the Northeast side of the pad. The containment under the vertical heater treater ignited and caught fire which eventually spread to the vegetation beside the pad. During my inspection the wells were shut in and contractors were installing new containment under the vertical heater treater. The production equipment consisted of eight 400 barrel tanks, one 50 barrel tank, a vapor recovery tower, two compressors, a vertical heater treater, a gas combustor, back-up flare stack, a horizontal line heater, a vertical separator, and a sand trap. |
0521404994 | 2019-02-14 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present with valves reading 0 pounds per square inch on the 13.375-inch diameter surface casing, and 200 pounds per square inch on the 9.625-inch diameter intermediate casing which was plumbed into the production flow line. The production equipment on pad consisted of four vertical separators, four sand traps, four horizontal indirect line heaters, one vertical heater treater, eight 400-barrel tanks, one 50-barrel tank, one vapor recovery tower, one gas combustor, and one flare stack. Identification was located on the wellhead. |
0859296207 | 2016-04-07 | Production Wells | No Violations | On the day of my inspection I witnessed that the location was gated and locked. The production equipment included 8-400bbl tanks and 1-50bbl tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 3-26H, and Ripley 4-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a production tree with valves in the open position with 550psi on the tubing and 300psi on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
0928372958 | 2014-07-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson Drilling Rig#257 had skidded from the 3-26H and drilled a 17.5 inch diameter hole to the depth of 357 feet. Franks Casing Crew was on site and began to run casing and on the second joint their tongs broke and became stuck on the casing. I left and will return later after repairs are made. |
0958142348 | 2014-07-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson UTI Drilling Rig #257 drilled a 12.25 inch diameter hole to the depth of 2070 feet and Wyoming Casing crew ran 2050 feet of 9.625 inch 36#/ft. J-55 Intermediate Casing. Stingray Cementing pumped 50bbls of gel, 10bbls of fresh water and cemented casing with 799 sacks of class A cement. Good cement returns of 38bbls plug was landed @980and pressured up to 1480psi for 5 minutes and the floats held. Cement stayed to surface. |
0961929668 | 2017-02-07 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 8-400 barrel tanks and 1-50 barrel tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 3-26H, and Ripley 4-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a production tree with valves in the open position with 200 pounds per square inch on the tubing and 450 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
1302053334 | 2016-09-06 | Production Wells | No Violations | On the day of my inspection I witnessed that the location was gated and locked. The production equipment included 8-400 barrel tanks and 1-50 barrel tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 3-26H, and Ripley 4-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a production tree with valves in the open position with 200 pounds per square inch the tubing and 400 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
1400256169 | 2014-05-16 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Express Energy Services drilled a 32 inch diameter hole to the depth of 100 feet and ran 105 feet of 26 inch 102.63#/ft conductor pipe. Stingray Cementing was on site and gained circulation with 25bbls of fresh water. Stingray pumped 15bbls of gel, 10bbls of fresh water and cemented pipe with 236 sacks of class A cement. Good returns of 9bbls and cement stayed surface. |
1404797915 | 2014-07-08 | Casing String Witnessed | No Violations
-55 casing. Patterson 257 had to wash down the last joint of casing. Stingray Cementing was on site and circulated the hole with 110bbls of fresh water. Stingray Cementing pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 474 sacks of class A cement 15.6ppg, 1.2cuft/sk. cement. Displaced cement with 49bbls of fresh water had good cement returns of 9bbls, plug was landed and pressured to 509psi for 5 minutes and the floats held. | |
1406247434 | 2014-07-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson Drilling Rig #257 had drilled a 17.5 inch diameter hole to the depth 357 feet and 357 feet of 13.375 inch 54.5#/ft. casing. Stingray Cementing LLC cemented said casing with Inspector Mike Hartshorn witnessing 10bbls of cement to surface. Casing head failed pressure test and had to be cut off and replaced with a new head. Casing head passed pressure test along with BOP test. |
1729304961 | 2014-07-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that BOP testing was completed and Patterson Drilling Rig #257 was mist drilling with a 12.25 inch diameter bit at a depth of 1009 feet with an estimated td of 2050 feet with intermediate casing to follow. Walk around with Company Man Manuel Olmos revealed no violations. |
1820396205 | 2015-01-12 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A. |
1854721157 | 2017-07-25 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 8-400 barrel tanks and 1-50 barrel tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 3-26H, and Ripley 4-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a plunger lift system with valves in the open position with 250 pounds per square inch on the tubing and 400 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
2099071539 | 2014-07-07 | Casing String Witnessed | No Violations | |
521404994 | 2019-2-14 0:00: | PW | No Violations | 0.30 |
859296207 | 2016-4-7 0:00:0 | PW | No Violations | 0.20 |
928372958 | 2014-7-7 0:00:0 | DD | No Violations | 2.00 |
958142348 | 2014-7-10 0:00: | DD | No Violations | 5.50 |