If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 1096070610002 | | Well ID: 1096070610002 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 58.436662, -119.152331 | width=100% | height=100% }} |
+ | |- | ||
+ | | Location: 00/10-06-109-07W6/2 | ||
+ | |- | ||
+ | | Location Alias: 00/10-06-09-07 W6M | ||
+ | |- | ||
+ | | Location Alias 2: 00/10-06-109-07 W6/02 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 109 | ||
+ | |- | ||
+ | | Meridian: 6 | ||
+ | |- | ||
+ | | Range: 07 | ||
+ | |- | ||
+ | | Section: 06 | ||
+ | |- | ||
+ | | County/Municipality: [[Mackenzie County,_Alberta|Mackenzie County]] | ||
|- | |- | ||
| Well Name: HUSKY MOBIL RAINBOW 10-6-109-7 | | Well Name: HUSKY MOBIL RAINBOW 10-6-109-7 | ||
|- | |- | ||
− | | Operator: | + | | Operator Name: [[Husky Oil Operations Limited]] |
+ | |- | ||
+ | | License Number: 0116648 | ||
|- | |- | ||
| License Date: 1985-08-02 | | License Date: 1985-08-02 | ||
|- | |- | ||
− | | Final Drilling Date | + | | License Status: Issued |
+ | |- | ||
+ | | Spud Date: 1985-08-06 | ||
+ | |- | ||
+ | | Final Drill Date: 1985-09-01 | ||
+ | |- | ||
+ | | Well Total Depth: 1958.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 58.436662 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -119.152331 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1985-08-02 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1985-08-08 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 1985-08-17 | ||
+ | | Kick Occurred | ||
+ | |- | ||
+ | | 1985-08-20 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-08-21 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-08-22 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1985-08-23 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1985-08-24 | ||
+ | | Intermediate Casing Operation Performed | ||
+ | |- | ||
+ | | 1985-08-28 | ||
+ | | Kick Occurred | ||
+ | |- | ||
+ | | 1985-09-01 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1985-09-01 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1985-09-02 | ||
+ | | Liner Casing Operation Performed | ||
+ | |- | ||
+ | | 1985-09-02 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-09-04 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 1985-10-03 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-10-06 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1985-10-09 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1985-10-10 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1985-10-11 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1985-10-12 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1988-05-19 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1988-05-29 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1988-05-31 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1988-06-03 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1988-06-04 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1999-03-11 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1999-03-17 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1999-03-18 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1999-03-19 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1999-03-20 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1999-03-21 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1999-03-21 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1999-03-22 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1999-03-23 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1999-03-27 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1999-04-16 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-07-27 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-07-28 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-07-29 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-07-30 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2012-08-01 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2012-08-03 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2012-08-05 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2012-08-10 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-09-10 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 2012-09-10 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2012-09-10 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | | 2013-07-10 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2013-07-10 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 2013-09-20 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2013-09-24 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2013-09-26 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 2013-09-27 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2013-09-27 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2013-09-28 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2013-09-30 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2013-10-03 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
|- | |- | ||
− | | | + | |}--> |
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
|- | |- | ||
− | | | + | |}--> |
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
|- | |- | ||
− | | | + | | 1985-10-06 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1824.50 | ||
+ | | style="text-align: right;" | 1828.50 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1988-06-04 |
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1904.00 | ||
+ | | style="text-align: right;" | 1958.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1999-03-11 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1816.00 | ||
+ | | style="text-align: right;" | 1817.00 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1999-03-11 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1819.00 | ||
+ | | style="text-align: right;" | 1820.00 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1999-03-17 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1858.00 | ||
+ | | style="text-align: right;" | 1860.00 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1999-03-17 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1852.00 | ||
+ | | style="text-align: right;" | 1854.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-03-17 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1846.00 | ||
+ | | style="text-align: right;" | 1848.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-03-17 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1840.00 | ||
+ | | style="text-align: right;" | 1841.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-03-17 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1827.50 | ||
+ | | style="text-align: right;" | 1829.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-03-18 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1858.00 | ||
+ | | style="text-align: right;" | 1860.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-18 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1852.00 | ||
+ | | style="text-align: right;" | 1854.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-10-06 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1839.00 | ||
+ | | style="text-align: right;" | 1842.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-03-19 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1846.00 | ||
+ | | style="text-align: right;" | 1848.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-19 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1840.00 | ||
+ | | style="text-align: right;" | 1841.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-20 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1852.00 | ||
+ | | style="text-align: right;" | 1854.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-21 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1825.00 | ||
+ | | style="text-align: right;" | 1829.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-03-22 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1825.00 | ||
+ | | style="text-align: right;" | 1829.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-27 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1825.00 | ||
+ | | style="text-align: right;" | 1829.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-27 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1819.00 | ||
+ | | style="text-align: right;" | 1820.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 1921.00 | ||
+ | | style="text-align: right;" | 1958.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1858.00 | ||
+ | | style="text-align: right;" | 1860.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1852.00 | ||
+ | | style="text-align: right;" | 1854.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-10-09 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1839.00 | ||
+ | | style="text-align: right;" | 1842.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1846.00 | ||
+ | | style="text-align: right;" | 1848.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1840.00 | ||
+ | | style="text-align: right;" | 1841.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1827.50 | ||
+ | | style="text-align: right;" | 1829.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1819.00 | ||
+ | | style="text-align: right;" | 1820.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-03-31 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1816.00 | ||
+ | | style="text-align: right;" | 1817.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1858.00 | ||
+ | | style="text-align: right;" | 1860.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1852.00 | ||
+ | | style="text-align: right;" | 1854.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1846.50 | ||
+ | | style="text-align: right;" | 1848.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1840.00 | ||
+ | | style="text-align: right;" | 1841.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1828.00 | ||
+ | | style="text-align: right;" | 1829.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1985-10-10 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1824.50 | ||
+ | | style="text-align: right;" | 1828.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1825.00 | ||
+ | | style="text-align: right;" | 1826.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1819.00 | ||
+ | | style="text-align: right;" | 1820.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-04-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1816.00 | ||
+ | | style="text-align: right;" | 1817.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2012-07-29 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1751.00 | ||
+ | | style="text-align: right;" | 1753.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2012-07-29 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1690.00 | ||
+ | | style="text-align: right;" | 1692.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2012-07-30 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1751.00 | ||
+ | | style="text-align: right;" | 1753.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-08-01 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1751.00 | ||
+ | | style="text-align: right;" | 1753.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-08-03 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1690.00 | ||
+ | | style="text-align: right;" | 1692.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-08-05 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1751.00 | ||
+ | | style="text-align: right;" | 1753.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013-09-26 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1904.00 | ||
+ | | style="text-align: right;" | 1958.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-10-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1824.50 | ||
+ | | style="text-align: right;" | 1828.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2013-09-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1895.00 | ||
+ | | style="text-align: right;" | 1897.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2013-09-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1884.00 | ||
+ | | style="text-align: right;" | 1889.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2013-09-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1876.00 | ||
+ | | style="text-align: right;" | 1878.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2013-09-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1863.00 | ||
+ | | style="text-align: right;" | 1865.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2013-09-28 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1863.00 | ||
+ | | style="text-align: right;" | 1897.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-10-12 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1824.50 | ||
+ | | style="text-align: right;" | 1828.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1988-05-19 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1824.50 | ||
+ | | style="text-align: right;" | 1842.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1988-05-29 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1904.00 | ||
+ | | style="text-align: right;" | 1958.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1988-06-03 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1904.00 | ||
+ | | style="text-align: right;" | 1958.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2012 | ||
+ | | style="text-align: right;" | 560 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | style="text-align: right;" | 356 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | | 1985-08-17 | ||
+ | | Kick | ||
+ | | style="text-align: right;" | 1683.00 | ||
+ | | style="text-align: right;" | 1692.00 | ||
+ | |- | ||
+ | | 1985-08-28 | ||
+ | | Kick | ||
+ | | style="text-align: right;" | 1828.00 | ||
+ | | style="text-align: right;" | 1828.00 | ||
+ | |- | ||
+ | | 1999-04-17 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | | 2012-08-13 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | | 2012-08-13 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | | 2013-10-04 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Occurence Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 1096070610002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.436662,"lon":-119.152331,"icon":""}]} |
Location: 00/10-06-109-07W6/2 | |
Location Alias: 00/10-06-09-07 W6M | |
Location Alias 2: 00/10-06-109-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 07 | |
Section: 06 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW 10-6-109-7 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0116648 | |
License Date: 1985-08-02 | |
License Status: Issued | |
Spud Date: 1985-08-06 | |
Final Drill Date: 1985-09-01 | |
Well Total Depth: 1958.00 m | |
Surface Hole Latitude: 58.436662 | |
Surface Hole Longitude: -119.152331 |
Date | Event |
---|---|
1985-08-02 | Obtained License |
1985-08-08 | Surface Casing Operation Performed |
1985-08-17 | Kick Occurred |
1985-08-20 | Well Log Performed |
1985-08-21 | Well Log Performed |
1985-08-22 | Drill Stem Test Performed |
1985-08-23 | Drill Stem Test Performed |
1985-08-24 | Intermediate Casing Operation Performed |
1985-08-28 | Kick Occurred |
1985-09-01 | Finished Drilling |
1985-09-01 | Well Mode changed to Drilled and Cased |
1985-09-02 | Liner Casing Operation Performed |
1985-09-02 | Well Log Performed |
1985-09-04 | Rig Released |
1985-10-03 | Well Log Performed |
1985-10-06 | Perforation Treatment Performed - Jet Perforation |
1985-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-10-11 | Perforation Treatment Performed - Jet Perforation |
1985-10-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-05-19 | Perforation Treatment Performed - Cement Squeeze |
1988-05-29 | Perforation Treatment Performed - Open-Hole Completion |
1988-05-31 | Well Log Performed |
1988-06-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-11 | Perforation Treatment Performed - Jet Perforation |
1999-03-17 | Perforation Treatment Performed - Jet Perforation |
1999-03-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-21 | Perforation Treatment Performed - Jet Perforation |
1999-03-21 | Well Log Performed |
1999-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-23 | Well Log Performed |
1999-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-31 | Perforation Treatment Performed - Cement Plug |
1999-03-31 | Perforation Treatment Performed - Cement Squeeze |
1999-04-07 | Perforation Treatment Performed - Jet Perforation |
1999-04-16 | Well Log Performed |
2012-07-27 | Well Log Performed |
2012-07-28 | Well Log Performed |
2012-07-29 | Perforation Treatment Performed - Jet Perforation |
2012-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-08-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-08-10 | Well Log Performed |
2012-09-10 | Well Began Production |
2012-09-10 | Well Fluid changed to Crude Oil |
2012-09-10 | Well Mode changed to Pumping |
2013-07-10 | Well Fluid changed to Crude Oil |
2013-07-10 | Well Mode changed to Suspended |
2013-09-20 | Well Log Performed |
2013-09-24 | Well Log Performed |
2013-09-26 | Perforation Treatment Performed - Open-Hole Completion |
2013-09-27 | Perforation Treatment Performed - Jet Perforation |
2013-09-27 | Well Log Performed |
2013-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-09-30 | Well Log Performed |
2013-10-03 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-10-06 | Perforation | 1824.50 | 1828.50 | 13 |
1988-06-04 | Acid Treatment | 1904.00 | 1958.00 | 0 |
1999-03-11 | Perforation | 1816.00 | 1817.00 | 13 |
1999-03-11 | Perforation | 1819.00 | 1820.00 | 13 |
1999-03-17 | Perforation | 1858.00 | 1860.00 | 13 |
1999-03-17 | Perforation | 1852.00 | 1854.00 | 13 |
1999-03-17 | Perforation | 1846.00 | 1848.00 | 13 |
1999-03-17 | Perforation | 1840.00 | 1841.50 | 13 |
1999-03-17 | Perforation | 1827.50 | 1829.00 | 13 |
1999-03-18 | Acid Treatment | 1858.00 | 1860.00 | 0 |
1999-03-18 | Acid Treatment | 1852.00 | 1854.00 | 0 |
1985-10-06 | Perforation | 1839.00 | 1842.00 | 13 |
1999-03-19 | Acid Treatment | 1846.00 | 1848.00 | 0 |
1999-03-19 | Acid Treatment | 1840.00 | 1841.50 | 0 |
1999-03-20 | Acid Treatment | 1852.00 | 1854.00 | 0 |
1999-03-21 | Perforation | 1825.00 | 1829.00 | 13 |
1999-03-22 | Acid Treatment | 1825.00 | 1829.00 | 0 |
1999-03-27 | Acid Treatment | 1825.00 | 1829.00 | 0 |
1999-03-27 | Acid Treatment | 1819.00 | 1820.00 | 0 |
1999-03-31 | Cement Plug | 1921.00 | 1958.00 | 0 |
1999-03-31 | Cement Squeeze | 1858.00 | 1860.00 | 0 |
1999-03-31 | Cement Squeeze | 1852.00 | 1854.00 | 0 |
1985-10-09 | Acid Treatment | 1839.00 | 1842.00 | 0 |
1999-03-31 | Cement Squeeze | 1846.00 | 1848.00 | 0 |
1999-03-31 | Cement Squeeze | 1840.00 | 1841.50 | 0 |
1999-03-31 | Cement Squeeze | 1827.50 | 1829.00 | 0 |
1999-03-31 | Cement Squeeze | 1819.00 | 1820.00 | 0 |
1999-03-31 | Cement Squeeze | 1816.00 | 1817.00 | 0 |
1999-04-07 | Perforation | 1858.00 | 1860.00 | 13 |
1999-04-07 | Perforation | 1852.00 | 1854.00 | 13 |
1999-04-07 | Perforation | 1846.50 | 1848.00 | 13 |
1999-04-07 | Perforation | 1840.00 | 1841.50 | 13 |
1999-04-07 | Perforation | 1828.00 | 1829.00 | 13 |
1985-10-10 | Acid Treatment | 1824.50 | 1828.50 | 0 |
1999-04-07 | Perforation | 1825.00 | 1826.00 | 13 |
1999-04-07 | Perforation | 1819.00 | 1820.00 | 13 |
1999-04-07 | Perforation | 1816.00 | 1817.00 | 13 |
2012-07-29 | Perforation | 1751.00 | 1753.50 | 13 |
2012-07-29 | Perforation | 1690.00 | 1692.00 | 13 |
2012-07-30 | Acid Treatment | 1751.00 | 1753.50 | 0 |
2012-08-01 | Acid Treatment | 1751.00 | 1753.50 | 0 |
2012-08-03 | Acid Treatment | 1690.00 | 1692.00 | 0 |
2012-08-05 | Acid Treatment | 1751.00 | 1753.50 | 0 |
2013-09-26 | Open Hole/Barefoot Completion | 1904.00 | 1958.00 | 0 |
1985-10-11 | Perforation | 1824.50 | 1828.50 | 13 |
2013-09-27 | Perforation | 1895.00 | 1897.00 | 13 |
2013-09-27 | Perforation | 1884.00 | 1889.00 | 13 |
2013-09-27 | Perforation | 1876.00 | 1878.00 | 13 |
2013-09-27 | Perforation | 1863.00 | 1865.00 | 13 |
2013-09-28 | Acid Treatment | 1863.00 | 1897.00 | 0 |
1985-10-12 | Acid Treatment | 1824.50 | 1828.50 | 0 |
1988-05-19 | Cement Squeeze | 1824.50 | 1842.00 | 0 |
1988-05-29 | Open Hole/Barefoot Completion | 1904.00 | 1958.00 | 0 |
1988-06-03 | Acid Treatment | 1904.00 | 1958.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 560 | 0.0 | 0.0 | 0.0 |
2013 | 356 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-08-17 | Kick | 1683.00 | 1692.00 |
1985-08-28 | Kick | 1828.00 | 1828.00 |
1999-04-17 | No Incident Encountered | 0.00 | 0.00 |
2012-08-13 | No Incident Encountered | 0.00 | 0.00 |
2012-08-13 | No Incident Encountered | 0.00 | 0.00 |
2013-10-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]