Well Details

Well ID: 1096070610002
Loading map...
Location: 00/10-06-109-07W6/2
Location Alias: 00/10-06-09-07 W6M
Location Alias 2: 00/10-06-109-07 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 06
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 10-6-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0116648
License Date: 1985-08-02
License Status: Issued
Spud Date: 1985-08-06
Final Drill Date: 1985-09-01
Well Total Depth: 1958.00 m
Surface Hole Latitude: 58.436662
Surface Hole Longitude: -119.152331

For data sources see[1][2]

Well History

Date Event
1985-08-02 Obtained License
1985-08-08 Surface Casing Operation Performed
1985-08-17 Kick Occurred
1985-08-20 Well Log Performed
1985-08-21 Well Log Performed
1985-08-22 Drill Stem Test Performed
1985-08-23 Drill Stem Test Performed
1985-08-24 Intermediate Casing Operation Performed
1985-08-28 Kick Occurred
1985-09-01 Finished Drilling
1985-09-01 Well Mode changed to Drilled and Cased
1985-09-02 Liner Casing Operation Performed
1985-09-02 Well Log Performed
1985-09-04 Rig Released
1985-10-03 Well Log Performed
1985-10-06 Perforation Treatment Performed - Jet Perforation
1985-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-11 Perforation Treatment Performed - Jet Perforation
1985-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-19 Perforation Treatment Performed - Cement Squeeze
1988-05-29 Perforation Treatment Performed - Open-Hole Completion
1988-05-31 Well Log Performed
1988-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-11 Perforation Treatment Performed - Jet Perforation
1999-03-17 Perforation Treatment Performed - Jet Perforation
1999-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-21 Perforation Treatment Performed - Jet Perforation
1999-03-21 Well Log Performed
1999-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-23 Well Log Performed
1999-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-31 Perforation Treatment Performed - Cement Plug
1999-03-31 Perforation Treatment Performed - Cement Squeeze
1999-04-07 Perforation Treatment Performed - Jet Perforation
1999-04-16 Well Log Performed
2012-07-27 Well Log Performed
2012-07-28 Well Log Performed
2012-07-29 Perforation Treatment Performed - Jet Perforation
2012-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-08-10 Well Log Performed
2012-09-10 Well Began Production
2012-09-10 Well Fluid changed to Crude Oil
2012-09-10 Well Mode changed to Pumping
2013-07-10 Well Fluid changed to Crude Oil
2013-07-10 Well Mode changed to Suspended
2013-09-20 Well Log Performed
2013-09-24 Well Log Performed
2013-09-26 Perforation Treatment Performed - Open-Hole Completion
2013-09-27 Perforation Treatment Performed - Jet Perforation
2013-09-27 Well Log Performed
2013-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-09-30 Well Log Performed
2013-10-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-06 Perforation 1824.50 1828.50 13
1988-06-04 Acid Treatment 1904.00 1958.00 0
1999-03-11 Perforation 1816.00 1817.00 13
1999-03-11 Perforation 1819.00 1820.00 13
1999-03-17 Perforation 1858.00 1860.00 13
1999-03-17 Perforation 1852.00 1854.00 13
1999-03-17 Perforation 1846.00 1848.00 13
1999-03-17 Perforation 1840.00 1841.50 13
1999-03-17 Perforation 1827.50 1829.00 13
1999-03-18 Acid Treatment 1858.00 1860.00 0
1999-03-18 Acid Treatment 1852.00 1854.00 0
1985-10-06 Perforation 1839.00 1842.00 13
1999-03-19 Acid Treatment 1846.00 1848.00 0
1999-03-19 Acid Treatment 1840.00 1841.50 0
1999-03-20 Acid Treatment 1852.00 1854.00 0
1999-03-21 Perforation 1825.00 1829.00 13
1999-03-22 Acid Treatment 1825.00 1829.00 0
1999-03-27 Acid Treatment 1825.00 1829.00 0
1999-03-27 Acid Treatment 1819.00 1820.00 0
1999-03-31 Cement Plug 1921.00 1958.00 0
1999-03-31 Cement Squeeze 1858.00 1860.00 0
1999-03-31 Cement Squeeze 1852.00 1854.00 0
1985-10-09 Acid Treatment 1839.00 1842.00 0
1999-03-31 Cement Squeeze 1846.00 1848.00 0
1999-03-31 Cement Squeeze 1840.00 1841.50 0
1999-03-31 Cement Squeeze 1827.50 1829.00 0
1999-03-31 Cement Squeeze 1819.00 1820.00 0
1999-03-31 Cement Squeeze 1816.00 1817.00 0
1999-04-07 Perforation 1858.00 1860.00 13
1999-04-07 Perforation 1852.00 1854.00 13
1999-04-07 Perforation 1846.50 1848.00 13
1999-04-07 Perforation 1840.00 1841.50 13
1999-04-07 Perforation 1828.00 1829.00 13
1985-10-10 Acid Treatment 1824.50 1828.50 0
1999-04-07 Perforation 1825.00 1826.00 13
1999-04-07 Perforation 1819.00 1820.00 13
1999-04-07 Perforation 1816.00 1817.00 13
2012-07-29 Perforation 1751.00 1753.50 13
2012-07-29 Perforation 1690.00 1692.00 13
2012-07-30 Acid Treatment 1751.00 1753.50 0
2012-08-01 Acid Treatment 1751.00 1753.50 0
2012-08-03 Acid Treatment 1690.00 1692.00 0
2012-08-05 Acid Treatment 1751.00 1753.50 0
2013-09-26 Open Hole/Barefoot Completion 1904.00 1958.00 0
1985-10-11 Perforation 1824.50 1828.50 13
2013-09-27 Perforation 1895.00 1897.00 13
2013-09-27 Perforation 1884.00 1889.00 13
2013-09-27 Perforation 1876.00 1878.00 13
2013-09-27 Perforation 1863.00 1865.00 13
2013-09-28 Acid Treatment 1863.00 1897.00 0
1985-10-12 Acid Treatment 1824.50 1828.50 0
1988-05-19 Cement Squeeze 1824.50 1842.00 0
1988-05-29 Open Hole/Barefoot Completion 1904.00 1958.00 0
1988-06-03 Acid Treatment 1904.00 1958.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 560 0.0 0.0 0.0
2013 356 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-08-17 Kick 1683.00 1692.00
1985-08-28 Kick 1828.00 1828.00
1999-04-17 No Incident Encountered 0.00 0.00
2012-08-13 No Incident Encountered 0.00 0.00
2012-08-13 No Incident Encountered 0.00 0.00
2013-10-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References