If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0655200504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.577954,"lon":-116.965908,"icon":""}]} |
Location: 00/04-05-065-20W5/0 | |
Location Alias: 00/04-05-65-20 W5M | |
Location Alias 2: 00/04-05-065-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 5 | |
Range: 20 | |
Section: 05 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: MURPHY 3-33D HZ KAYBOB 4-5-65-20 | |
Operator Name: Murphy Oil Company Ltd. | |
License Number: 0486542 | |
License Date: 2017-11-27 | |
License Status: Amended | |
Spud Date: 2018-01-30 | |
Final Drill Date: 2018-03-07 | |
Well Total Depth: 5701.00 m | |
Surface Hole Latitude: 54.577954 | |
Surface Hole Longitude: -116.965908 |
Date | Event |
---|---|
2017-11-27 | Obtained License |
2018-01-31 | Surface Casing Operation Performed |
2018-02-15 | Well Log Performed |
2018-02-26 | Direction Drilling Operation Performed - Deviate |
2018-03-01 | Intermediate Casing Operation Performed |
2018-03-05 | Direction Drilling Operation Performed - Horizontal |
2018-03-07 | Finished Drilling |
2018-03-07 | Well Log Performed |
2018-03-07 | Well Mode changed to Drilled and Cased |
2018-03-08 | Production Casing Operation Performed |
2018-03-10 | Rig Released |
2018-05-04 | Perforation Treatment Performed - Open-Hole Completion |
2018-05-07 | Perforation Treatment Performed - Jet Perforation |
2018-05-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-25 | Perforation Treatment Performed - Jet Perforation |
2018-05-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-26 | Perforation Treatment Performed - Jet Perforation |
2018-05-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-27 | Perforation Treatment Performed - Jet Perforation |
2018-05-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-28 | Perforation Treatment Performed - Jet Perforation |
2018-05-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-29 | Perforation Treatment Performed - Jet Perforation |
2018-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-30 | Perforation Treatment Performed - Jet Perforation |
2018-05-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-31 | Perforation Treatment Performed - Jet Perforation |
2018-05-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-01 | Perforation Treatment Performed - Jet Perforation |
2018-06-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-01 | Well Fluid changed to Gas |
2018-06-01 | Well Mode changed to Testing |
2018-06-02 | Perforation Treatment Performed - Jet Perforation |
2018-06-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-03 | Perforation Treatment Performed - Jet Perforation |
2018-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-04 | Perforation Treatment Performed - Jet Perforation |
2018-06-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-05 | Perforation Treatment Performed - Jet Perforation |
2018-06-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-06 | Perforation Treatment Performed - Jet Perforation |
2018-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-07 | Perforation Treatment Performed - Jet Perforation |
2018-06-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-08 | Perforation Treatment Performed - Jet Perforation |
2018-06-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-09 | Perforation Treatment Performed - Jet Perforation |
2018-06-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-10 | Perforation Treatment Performed - Jet Perforation |
2018-06-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-13 | Perforation Treatment Performed - Jet Perforation |
2018-06-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-14 | Perforation Treatment Performed - Jet Perforation |
2018-06-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-30 | Well Began Production |
2018-06-30 | Well Fluid changed to Gas |
2018-06-30 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-03-03 | Horizon Drilling Inc. | 55 | N/A | Resumption |
2018-01-30 | Horizon Drilling Inc. | 55 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-26 | 752.70 | Deviate (5 - 79 degrees) |
2018-03-05 | 3142.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-05-04 | Open Hole/Barefoot Completion | 5696.00 | 5701.00 | 0 |
2018-05-25 | Perforation | 5582.00 | 5582.50 | 4 |
2018-05-31 | Perforation | 4682.00 | 4682.50 | 3 |
2018-05-31 | Perforation | 4694.00 | 4694.50 | 3 |
2018-05-31 | Multi-Stage Fracture | 4646.00 | 4694.50 | 0 |
2018-05-31 | Perforation | 4586.00 | 4586.50 | 3 |
2018-05-31 | Perforation | 4598.00 | 4598.50 | 3 |
2018-05-31 | Perforation | 4610.00 | 4610.50 | 4 |
2018-05-31 | Perforation | 4622.00 | 4622.50 | 3 |
2018-05-31 | Perforation | 4634.00 | 4634.50 | 3 |
2018-05-31 | Multi-Stage Fracture | 4586.00 | 4634.50 | 0 |
2018-06-01 | Perforation | 4526.00 | 4526.50 | 3 |
2018-05-25 | Perforation | 5594.00 | 5594.50 | 4 |
2018-06-01 | Perforation | 4538.00 | 4538.50 | 3 |
2018-06-01 | Perforation | 4550.00 | 4550.50 | 4 |
2018-06-01 | Perforation | 4562.00 | 4562.50 | 3 |
2018-06-01 | Perforation | 4574.00 | 4574.50 | 3 |
2018-06-01 | Multi-Stage Fracture | 4526.00 | 4574.50 | 0 |
2018-06-01 | Perforation | 4466.00 | 4466.50 | 3 |
2018-06-01 | Perforation | 4478.00 | 4478.50 | 3 |
2018-06-01 | Perforation | 4490.00 | 4490.50 | 4 |
2018-06-01 | Perforation | 4502.00 | 4502.50 | 3 |
2018-06-01 | Perforation | 4514.00 | 4514.50 | 3 |
2018-05-25 | Multi-Stage Fracture | 5546.00 | 5594.50 | 0 |
2018-06-01 | Multi-Stage Fracture | 4466.00 | 4514.50 | 0 |
2018-06-01 | Perforation | 4406.00 | 4406.50 | 3 |
2018-06-01 | Perforation | 4418.00 | 4418.50 | 3 |
2018-06-01 | Perforation | 4430.00 | 4430.50 | 4 |
2018-06-01 | Perforation | 4442.00 | 4442.50 | 3 |
2018-06-01 | Perforation | 4454.00 | 4454.50 | 3 |
2018-06-01 | Multi-Stage Fracture | 4406.00 | 4454.50 | 0 |
2018-06-02 | Perforation | 4346.00 | 4346.50 | 3 |
2018-06-02 | Perforation | 4358.00 | 4358.50 | 3 |
2018-06-02 | Perforation | 4370.00 | 4370.50 | 4 |
2018-05-26 | Perforation | 5486.00 | 5486.50 | 4 |
2018-06-02 | Perforation | 4382.00 | 4382.50 | 3 |
2018-06-02 | Perforation | 4394.00 | 4394.50 | 3 |
2018-06-02 | Multi-Stage Fracture | 4346.00 | 4394.50 | 0 |
2018-06-02 | Perforation | 4286.00 | 4286.50 | 3 |
2018-06-02 | Perforation | 4298.00 | 4298.50 | 3 |
2018-06-02 | Perforation | 4310.00 | 4310.50 | 4 |
2018-06-02 | Perforation | 4322.00 | 4322.50 | 3 |
2018-06-02 | Perforation | 4334.00 | 4334.50 | 3 |
2018-06-02 | Multi-Stage Fracture | 4286.00 | 4334.50 | 0 |
2018-06-03 | Perforation | 4226.00 | 4226.50 | 3 |
2018-05-26 | Perforation | 5498.00 | 5498.50 | 4 |
2018-06-03 | Perforation | 4238.00 | 4238.50 | 3 |
2018-06-03 | Perforation | 4250.00 | 4250.50 | 4 |
2018-06-03 | Perforation | 4262.00 | 4262.50 | 3 |
2018-06-03 | Perforation | 4274.00 | 4274.50 | 3 |
2018-06-03 | Multi-Stage Fracture | 4226.00 | 4274.50 | 0 |
2018-06-03 | Perforation | 4166.00 | 4166.50 | 3 |
2018-06-03 | Perforation | 4178.00 | 4178.50 | 3 |
2018-06-03 | Perforation | 4190.00 | 4190.50 | 4 |
2018-06-03 | Perforation | 4202.00 | 4202.50 | 3 |
2018-06-03 | Perforation | 4214.00 | 4214.50 | 3 |
2018-05-26 | Perforation | 5510.00 | 5510.50 | 4 |
2018-06-03 | Multi-Stage Fracture | 4166.00 | 4214.50 | 0 |
2018-06-04 | Perforation | 4106.00 | 4106.50 | 3 |
2018-06-04 | Perforation | 4118.00 | 4118.50 | 3 |
2018-06-04 | Perforation | 4130.00 | 4130.50 | 4 |
2018-06-04 | Perforation | 4142.00 | 4142.50 | 3 |
2018-06-04 | Perforation | 4154.00 | 4154.50 | 3 |
2018-06-04 | Multi-Stage Fracture | 4106.00 | 4154.50 | 0 |
2018-06-04 | Perforation | 4046.00 | 4046.50 | 3 |
2018-06-04 | Perforation | 4058.00 | 4058.50 | 3 |
2018-06-04 | Perforation | 4070.00 | 4070.50 | 4 |
2018-05-26 | Perforation | 5522.00 | 5522.50 | 4 |
2018-06-04 | Perforation | 4082.00 | 4082.50 | 3 |
2018-06-04 | Perforation | 4094.00 | 4094.50 | 3 |
2018-06-04 | Multi-Stage Fracture | 4046.00 | 4094.50 | 0 |
2018-06-04 | Perforation | 3986.00 | 3986.50 | 3 |
2018-06-04 | Perforation | 3998.00 | 3998.50 | 3 |
2018-06-04 | Perforation | 4010.00 | 4010.50 | 4 |
2018-06-04 | Perforation | 4022.00 | 4022.50 | 3 |
2018-06-04 | Perforation | 4034.00 | 4034.50 | 3 |
2018-06-04 | Multi-Stage Fracture | 3986.00 | 4034.50 | 0 |
2018-06-05 | Perforation | 3926.00 | 3926.50 | 3 |
2018-05-26 | Perforation | 5534.00 | 5534.50 | 4 |
2018-06-05 | Perforation | 3938.00 | 3938.50 | 3 |
2018-06-05 | Perforation | 3950.00 | 3950.50 | 4 |
2018-06-05 | Perforation | 3962.00 | 3962.50 | 3 |
2018-06-05 | Perforation | 3974.00 | 3974.50 | 3 |
2018-06-05 | Multi-Stage Fracture | 3926.00 | 3974.50 | 0 |
2018-06-06 | Perforation | 3866.00 | 3866.50 | 3 |
2018-06-06 | Perforation | 3878.00 | 3878.50 | 3 |
2018-06-06 | Perforation | 3890.00 | 3890.50 | 4 |
2018-06-06 | Perforation | 3902.00 | 3902.50 | 3 |
2018-06-06 | Perforation | 3914.00 | 3914.50 | 3 |
2018-05-26 | Multi-Stage Fracture | 5486.00 | 5534.50 | 0 |
2018-06-06 | Multi-Stage Fracture | 3866.00 | 3914.50 | 0 |
2018-06-07 | Perforation | 3806.00 | 3806.50 | 3 |
2018-06-07 | Perforation | 3818.00 | 3818.50 | 3 |
2018-06-07 | Perforation | 3830.00 | 3830.50 | 4 |
2018-06-07 | Perforation | 3842.00 | 3842.50 | 3 |
2018-06-07 | Perforation | 3854.00 | 3854.50 | 3 |
2018-06-07 | Multi-Stage Fracture | 3806.00 | 3854.50 | 0 |
2018-06-07 | Perforation | 3746.00 | 3746.50 | 3 |
2018-06-07 | Perforation | 3758.00 | 3758.50 | 3 |
2018-06-07 | Perforation | 3770.00 | 3770.50 | 4 |
2018-05-26 | Perforation | 5426.00 | 5426.50 | 4 |
2018-06-07 | Perforation | 3782.00 | 3782.50 | 3 |
2018-06-07 | Perforation | 3794.00 | 3794.50 | 3 |
2018-06-07 | Multi-Stage Fracture | 3746.00 | 3794.50 | 0 |
2018-06-07 | Perforation | 3686.00 | 3686.50 | 3 |
2018-06-07 | Perforation | 3698.00 | 3698.50 | 3 |
2018-06-07 | Perforation | 3710.00 | 3710.50 | 4 |
2018-06-07 | Perforation | 3722.00 | 3722.50 | 3 |
2018-06-07 | Perforation | 3734.00 | 3734.50 | 3 |
2018-06-07 | Multi-Stage Fracture | 3686.00 | 3734.50 | 0 |
2018-06-08 | Perforation | 3626.00 | 3626.50 | 3 |
2018-05-07 | Perforation | 5612.50 | 5613.00 | 2 |
2018-05-26 | Perforation | 5438.00 | 5438.50 | 4 |
2018-06-08 | Perforation | 3638.00 | 3638.50 | 3 |
2018-06-08 | Perforation | 3650.00 | 3650.50 | 4 |
2018-06-08 | Perforation | 3662.00 | 3662.50 | 3 |
2018-06-08 | Perforation | 3674.00 | 3674.50 | 3 |
2018-06-08 | Multi-Stage Fracture | 3626.00 | 3674.50 | 0 |
2018-06-08 | Perforation | 3566.00 | 3566.50 | 3 |
2018-06-08 | Perforation | 3578.00 | 3578.50 | 3 |
2018-06-08 | Perforation | 3590.00 | 3590.50 | 4 |
2018-06-08 | Perforation | 3602.00 | 3602.50 | 3 |
2018-06-08 | Perforation | 3614.00 | 3614.50 | 3 |
2018-05-26 | Perforation | 5450.00 | 5450.50 | 4 |
2018-06-08 | Multi-Stage Fracture | 3566.00 | 3614.50 | 0 |
2018-06-09 | Perforation | 3506.00 | 3506.50 | 3 |
2018-06-09 | Perforation | 3518.00 | 3518.50 | 3 |
2018-06-09 | Perforation | 3530.00 | 3530.50 | 4 |
2018-06-09 | Perforation | 3542.00 | 3542.50 | 3 |
2018-06-09 | Perforation | 3554.00 | 3554.50 | 3 |
2018-06-09 | Multi-Stage Fracture | 3506.00 | 3554.50 | 0 |
2018-06-09 | Perforation | 3446.00 | 3446.50 | 3 |
2018-06-09 | Perforation | 3458.00 | 3458.50 | 3 |
2018-06-09 | Perforation | 3470.00 | 3470.50 | 4 |
2018-05-26 | Perforation | 5462.00 | 5462.50 | 4 |
2018-06-09 | Perforation | 3482.00 | 3482.50 | 3 |
2018-06-09 | Perforation | 3494.00 | 3494.50 | 3 |
2018-06-09 | Multi-Stage Fracture | 3446.00 | 3494.50 | 0 |
2018-06-10 | Perforation | 3386.00 | 3386.50 | 3 |
2018-06-10 | Perforation | 3398.00 | 3398.50 | 3 |
2018-06-10 | Perforation | 3410.00 | 3410.50 | 4 |
2018-06-10 | Perforation | 3422.00 | 3422.50 | 3 |
2018-06-10 | Perforation | 3434.00 | 3434.50 | 3 |
2018-06-10 | Multi-Stage Fracture | 3386.00 | 3434.50 | 0 |
2018-06-10 | Perforation | 3326.00 | 3326.50 | 3 |
2018-05-26 | Perforation | 5474.00 | 5474.50 | 3 |
2018-06-10 | Perforation | 3338.00 | 3338.50 | 3 |
2018-06-10 | Perforation | 3350.00 | 3350.50 | 4 |
2018-06-10 | Perforation | 3362.00 | 3362.50 | 3 |
2018-06-10 | Perforation | 3374.00 | 3374.50 | 3 |
2018-06-10 | Multi-Stage Fracture | 3326.00 | 3374.50 | 0 |
2018-06-13 | Perforation | 3266.00 | 3266.50 | 3 |
2018-06-13 | Perforation | 3278.00 | 3278.50 | 3 |
2018-06-13 | Perforation | 3290.00 | 3290.50 | 4 |
2018-06-13 | Perforation | 3302.00 | 3302.50 | 3 |
2018-06-13 | Perforation | 3314.00 | 3314.50 | 3 |
2018-05-26 | Multi-Stage Fracture | 5426.00 | 5474.50 | 0 |
2018-06-13 | Multi-Stage Fracture | 3266.00 | 3314.50 | 0 |
2018-06-14 | Perforation | 3206.00 | 3206.50 | 3 |
2018-06-14 | Perforation | 3218.00 | 3218.50 | 3 |
2018-06-14 | Perforation | 3230.00 | 3230.50 | 4 |
2018-06-14 | Perforation | 3242.00 | 3242.50 | 3 |
2018-06-14 | Perforation | 3254.00 | 3254.50 | 3 |
2018-06-14 | Multi-Stage Fracture | 3206.00 | 3254.50 | 0 |
2018-05-26 | Perforation | 5366.00 | 5366.50 | 4 |
2018-05-26 | Perforation | 5378.00 | 5378.50 | 4 |
2018-05-26 | Perforation | 5390.00 | 5390.50 | 4 |
2018-05-26 | Perforation | 5402.00 | 5402.50 | 4 |
2018-05-26 | Perforation | 5414.00 | 5414.50 | 3 |
2018-05-07 | Perforation | 5625.00 | 5625.50 | 2 |
2018-05-26 | Multi-Stage Fracture | 5366.00 | 5414.50 | 0 |
2018-05-27 | Perforation | 5306.00 | 5306.50 | 3 |
2018-05-27 | Perforation | 5318.00 | 5318.50 | 4 |
2018-05-27 | Perforation | 5330.00 | 5330.50 | 4 |
2018-05-27 | Perforation | 5342.00 | 5342.50 | 4 |
2018-05-27 | Perforation | 5354.00 | 5354.50 | 3 |
2018-05-27 | Multi-Stage Fracture | 5306.00 | 5354.50 | 0 |
2018-05-27 | Perforation | 5246.00 | 5246.50 | 3 |
2018-05-27 | Perforation | 5258.00 | 5258.50 | 4 |
2018-05-27 | Perforation | 5270.00 | 5270.50 | 4 |
2018-05-07 | Perforation | 5637.50 | 5638.00 | 2 |
2018-05-27 | Perforation | 5282.00 | 5282.50 | 4 |
2018-05-27 | Perforation | 5294.00 | 5294.50 | 3 |
2018-05-27 | Multi-Stage Fracture | 5246.00 | 5294.50 | 0 |
2018-05-27 | Perforation | 5186.00 | 5186.50 | 3 |
2018-05-27 | Perforation | 5198.00 | 5198.50 | 4 |
2018-05-27 | Perforation | 5210.00 | 5210.50 | 4 |
2018-05-27 | Perforation | 5222.00 | 5222.50 | 4 |
2018-05-27 | Perforation | 5234.00 | 5234.50 | 3 |
2018-05-27 | Multi-Stage Fracture | 5186.00 | 5234.50 | 0 |
2018-05-28 | Perforation | 5126.00 | 5126.50 | 3 |
2018-05-07 | Perforation | 5650.00 | 5650.50 | 2 |
2018-05-28 | Perforation | 5138.00 | 5138.50 | 4 |
2018-05-28 | Perforation | 5150.00 | 5150.50 | 4 |
2018-05-28 | Perforation | 5162.00 | 5162.50 | 4 |
2018-05-28 | Perforation | 5174.00 | 5174.50 | 3 |
2018-05-28 | Multi-Stage Fracture | 5126.00 | 5174.50 | 0 |
2018-05-28 | Perforation | 5066.00 | 5066.50 | 3 |
2018-05-28 | Perforation | 5078.00 | 5078.50 | 4 |
2018-05-28 | Perforation | 5090.00 | 5090.50 | 4 |
2018-05-28 | Perforation | 5102.00 | 5102.50 | 3 |
2018-05-28 | Perforation | 5114.00 | 5114.50 | 3 |
2018-05-07 | Multi-Stage Fracture | 5612.50 | 5669.20 | 0 |
2018-05-28 | Multi-Stage Fracture | 5066.00 | 5114.50 | 0 |
2018-05-29 | Perforation | 5006.00 | 5006.50 | 3 |
2018-05-29 | Perforation | 5018.00 | 5018.50 | 4 |
2018-05-29 | Perforation | 5030.00 | 5030.50 | 4 |
2018-05-29 | Perforation | 5042.00 | 5042.50 | 3 |
2018-05-29 | Perforation | 5054.00 | 5054.50 | 3 |
2018-05-29 | Multi-Stage Fracture | 5006.00 | 5054.50 | 0 |
2018-05-29 | Perforation | 4946.00 | 4946.50 | 3 |
2018-05-29 | Perforation | 4958.00 | 4958.50 | 4 |
2018-05-29 | Perforation | 4970.00 | 4970.50 | 4 |
2018-05-25 | Perforation | 5546.00 | 5546.50 | 4 |
2018-05-29 | Perforation | 4982.00 | 4982.50 | 3 |
2018-05-29 | Perforation | 4994.00 | 4994.50 | 3 |
2018-05-29 | Multi-Stage Fracture | 4946.00 | 4994.50 | 0 |
2018-05-29 | Perforation | 4886.00 | 4886.50 | 3 |
2018-05-29 | Perforation | 4898.00 | 4898.50 | 4 |
2018-05-29 | Perforation | 4910.00 | 4910.50 | 4 |
2018-05-29 | Perforation | 4922.00 | 4922.50 | 3 |
2018-05-29 | Perforation | 4934.00 | 4934.50 | 3 |
2018-05-29 | Multi-Stage Fracture | 4886.00 | 4934.50 | 0 |
2018-05-30 | Perforation | 4826.00 | 4826.50 | 3 |
2018-05-25 | Perforation | 5558.00 | 5558.50 | 4 |
2018-05-30 | Perforation | 4838.00 | 4838.50 | 3 |
2018-05-30 | Perforation | 4850.00 | 4850.50 | 4 |
2018-05-30 | Perforation | 4862.00 | 4862.50 | 3 |
2018-05-30 | Perforation | 4874.00 | 4874.50 | 3 |
2018-05-30 | Multi-Stage Fracture | 4826.00 | 4874.50 | 0 |
2018-05-30 | Perforation | 4766.00 | 4766.50 | 3 |
2018-05-30 | Perforation | 4778.00 | 4778.50 | 3 |
2018-05-30 | Perforation | 4790.00 | 4790.50 | 4 |
2018-05-30 | Perforation | 4802.00 | 4802.50 | 3 |
2018-05-30 | Perforation | 4814.00 | 4814.50 | 3 |
2018-05-25 | Perforation | 5570.00 | 5570.50 | 4 |
2018-05-30 | Multi-Stage Fracture | 4766.00 | 4814.50 | 0 |
2018-05-30 | Perforation | 4706.00 | 4706.50 | 3 |
2018-05-30 | Perforation | 4718.00 | 4718.50 | 3 |
2018-05-30 | Perforation | 4730.00 | 4730.50 | 4 |
2018-05-30 | Perforation | 4742.00 | 4742.50 | 3 |
2018-05-30 | Perforation | 4754.00 | 4754.50 | 3 |
2018-05-30 | Multi-Stage Fracture | 4706.00 | 4754.50 | 0 |
2018-05-31 | Perforation | 4646.00 | 4646.50 | 3 |
2018-05-31 | Perforation | 4658.00 | 4658.50 | 3 |
2018-05-31 | Perforation | 4670.00 | 4670.50 | 4 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-05-07 | 2018-06-14 | 3,003 | 46,422 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 91.8849 | N/A | |||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.1216 | N/A | ||
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.1942 | N/A | ||
Hydrochloric Acid 28% | BJ Services | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.4231 | N/A | |
Water | 7732-18-5 | 100 | 0.4231 | N/A | ||||
Alpha 544 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0093 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.0093 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0093 | N/A | ||||
Sodium Bromide | 7647-15-6 | 100 | 0.0093 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0093 | N/A | ||||
CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0975 | N/A | |
Non-hazardous | Not Available | 100 | 0.0975 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0975 | N/A | ||||
CI-27 | BJ Services | Corrosion Inhibitor | Fatty acids | 61790-12-3 | 100 | 0.0033 | N/A | |
Methanol | 67-56-1 | 100 | 0.0033 | N/A | ||||
Modified thiourea polymer | 68527-49-1 | 100 | 0.0033 | N/A | ||||
Olefin | 64743-02-8 | 100 | 0.0033 | N/A | ||||
Polyoxyalkylenes | 68951-67-7 | 100 | 0.0033 | N/A | ||||
Propargyl alcohol | 107-19-7 | 100 | 0.0033 | N/A | ||||
FP-12L | BJ Services | Defoamer | Methylcellulose | 9004-67-5 | 100 | 0 | N/A | |
Non-hazardous | Not Available | 100 | 0 | N/A | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0001 | N/A | ||||
Polydimethylsiloxane | 63148-62-9 | 100 | 0 | N/A | ||||
Water | 7732-18-5 | 100 | 0 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0008 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0008 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0008 | N/A | ||||
ThinFrac MP | BJ Services | Friction Reducer | Anionic terpolymer | 12054 | 100 | 0.0907 | N/A | |
Oxyalkylated alcohol | 12054 | 100 | 0.0907 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.0907 | N/A | ||||
Sodium chloride | 7647-14-5 | 100 | 0.0907 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0907 | N/A | ||||
Ferrotrol 800 | BJ Services | Iron Control | Trisodium nitrilotriacetate monohydrate | 18662-53-8 | 100 | 0.0037 | N/A | |
ScaleTrol 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0114 | N/A | |
Water | 7732-18-5 | 100 | 0.0114 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-05-23 | 2018-06-15 | Surface Water - Runoff | 46575 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5007 | 0.0 | 0.0 | 0.0 |
2019 | 8512 | 0.0 | 0.0 | 0.0 |
2020 | 2012 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-03-10 | No Incident Encountered | 0.00 | 0.00 |
2018-06-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]