X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655200504000

Well Details

Well ID: 0655200504000
Loading map...
Location: 00/04-05-065-20W5/0
Location Alias: 00/04-05-65-20 W5M
Location Alias 2: 00/04-05-065-20 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 20
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 3-33D HZ KAYBOB 4-5-65-20
Operator Name: Murphy Oil Company Ltd.
License Number: 0486542
License Date: 2017-11-27
License Status: Amended
Spud Date: 2018-01-30
Final Drill Date: 2018-03-07
Well Total Depth: 5701.00 m
Surface Hole Latitude: 54.577954
Surface Hole Longitude: -116.965908

For data sources see[1][2]

Well History

Date Event
2017-11-27 Obtained License
2018-01-31 Surface Casing Operation Performed
2018-02-15 Well Log Performed
2018-02-26 Direction Drilling Operation Performed - Deviate
2018-03-01 Intermediate Casing Operation Performed
2018-03-05 Direction Drilling Operation Performed - Horizontal
2018-03-07 Finished Drilling
2018-03-07 Well Log Performed
2018-03-07 Well Mode changed to Drilled and Cased
2018-03-08 Production Casing Operation Performed
2018-03-10 Rig Released
2018-05-04 Perforation Treatment Performed - Open-Hole Completion
2018-05-07 Perforation Treatment Performed - Jet Perforation
2018-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-25 Perforation Treatment Performed - Jet Perforation
2018-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-26 Perforation Treatment Performed - Jet Perforation
2018-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-27 Perforation Treatment Performed - Jet Perforation
2018-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-28 Perforation Treatment Performed - Jet Perforation
2018-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-29 Perforation Treatment Performed - Jet Perforation
2018-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-30 Perforation Treatment Performed - Jet Perforation
2018-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-31 Perforation Treatment Performed - Jet Perforation
2018-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-01 Perforation Treatment Performed - Jet Perforation
2018-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Testing
2018-06-02 Perforation Treatment Performed - Jet Perforation
2018-06-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-03 Perforation Treatment Performed - Jet Perforation
2018-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-04 Perforation Treatment Performed - Jet Perforation
2018-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-05 Perforation Treatment Performed - Jet Perforation
2018-06-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-06 Perforation Treatment Performed - Jet Perforation
2018-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-07 Perforation Treatment Performed - Jet Perforation
2018-06-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-08 Perforation Treatment Performed - Jet Perforation
2018-06-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-09 Perforation Treatment Performed - Jet Perforation
2018-06-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-10 Perforation Treatment Performed - Jet Perforation
2018-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-13 Perforation Treatment Performed - Jet Perforation
2018-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-14 Perforation Treatment Performed - Jet Perforation
2018-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-30 Well Began Production
2018-06-30 Well Fluid changed to Gas
2018-06-30 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-03-03 Horizon Drilling Inc. 55 N/A Resumption
2018-01-30 Horizon Drilling Inc. 55 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-26 752.70 Deviate (5 - 79 degrees)
2018-03-05 3142.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-05-04 Open Hole/Barefoot Completion 5696.00 5701.00 0
2018-05-25 Perforation 5582.00 5582.50 4
2018-05-31 Perforation 4682.00 4682.50 3
2018-05-31 Perforation 4694.00 4694.50 3
2018-05-31 Multi-Stage Fracture 4646.00 4694.50 0
2018-05-31 Perforation 4586.00 4586.50 3
2018-05-31 Perforation 4598.00 4598.50 3
2018-05-31 Perforation 4610.00 4610.50 4
2018-05-31 Perforation 4622.00 4622.50 3
2018-05-31 Perforation 4634.00 4634.50 3
2018-05-31 Multi-Stage Fracture 4586.00 4634.50 0
2018-06-01 Perforation 4526.00 4526.50 3
2018-05-25 Perforation 5594.00 5594.50 4
2018-06-01 Perforation 4538.00 4538.50 3
2018-06-01 Perforation 4550.00 4550.50 4
2018-06-01 Perforation 4562.00 4562.50 3
2018-06-01 Perforation 4574.00 4574.50 3
2018-06-01 Multi-Stage Fracture 4526.00 4574.50 0
2018-06-01 Perforation 4466.00 4466.50 3
2018-06-01 Perforation 4478.00 4478.50 3
2018-06-01 Perforation 4490.00 4490.50 4
2018-06-01 Perforation 4502.00 4502.50 3
2018-06-01 Perforation 4514.00 4514.50 3
2018-05-25 Multi-Stage Fracture 5546.00 5594.50 0
2018-06-01 Multi-Stage Fracture 4466.00 4514.50 0
2018-06-01 Perforation 4406.00 4406.50 3
2018-06-01 Perforation 4418.00 4418.50 3
2018-06-01 Perforation 4430.00 4430.50 4
2018-06-01 Perforation 4442.00 4442.50 3
2018-06-01 Perforation 4454.00 4454.50 3
2018-06-01 Multi-Stage Fracture 4406.00 4454.50 0
2018-06-02 Perforation 4346.00 4346.50 3
2018-06-02 Perforation 4358.00 4358.50 3
2018-06-02 Perforation 4370.00 4370.50 4
2018-05-26 Perforation 5486.00 5486.50 4
2018-06-02 Perforation 4382.00 4382.50 3
2018-06-02 Perforation 4394.00 4394.50 3
2018-06-02 Multi-Stage Fracture 4346.00 4394.50 0
2018-06-02 Perforation 4286.00 4286.50 3
2018-06-02 Perforation 4298.00 4298.50 3
2018-06-02 Perforation 4310.00 4310.50 4
2018-06-02 Perforation 4322.00 4322.50 3
2018-06-02 Perforation 4334.00 4334.50 3
2018-06-02 Multi-Stage Fracture 4286.00 4334.50 0
2018-06-03 Perforation 4226.00 4226.50 3
2018-05-26 Perforation 5498.00 5498.50 4
2018-06-03 Perforation 4238.00 4238.50 3
2018-06-03 Perforation 4250.00 4250.50 4
2018-06-03 Perforation 4262.00 4262.50 3
2018-06-03 Perforation 4274.00 4274.50 3
2018-06-03 Multi-Stage Fracture 4226.00 4274.50 0
2018-06-03 Perforation 4166.00 4166.50 3
2018-06-03 Perforation 4178.00 4178.50 3
2018-06-03 Perforation 4190.00 4190.50 4
2018-06-03 Perforation 4202.00 4202.50 3
2018-06-03 Perforation 4214.00 4214.50 3
2018-05-26 Perforation 5510.00 5510.50 4
2018-06-03 Multi-Stage Fracture 4166.00 4214.50 0
2018-06-04 Perforation 4106.00 4106.50 3
2018-06-04 Perforation 4118.00 4118.50 3
2018-06-04 Perforation 4130.00 4130.50 4
2018-06-04 Perforation 4142.00 4142.50 3
2018-06-04 Perforation 4154.00 4154.50 3
2018-06-04 Multi-Stage Fracture 4106.00 4154.50 0
2018-06-04 Perforation 4046.00 4046.50 3
2018-06-04 Perforation 4058.00 4058.50 3
2018-06-04 Perforation 4070.00 4070.50 4
2018-05-26 Perforation 5522.00 5522.50 4
2018-06-04 Perforation 4082.00 4082.50 3
2018-06-04 Perforation 4094.00 4094.50 3
2018-06-04 Multi-Stage Fracture 4046.00 4094.50 0
2018-06-04 Perforation 3986.00 3986.50 3
2018-06-04 Perforation 3998.00 3998.50 3
2018-06-04 Perforation 4010.00 4010.50 4
2018-06-04 Perforation 4022.00 4022.50 3
2018-06-04 Perforation 4034.00 4034.50 3
2018-06-04 Multi-Stage Fracture 3986.00 4034.50 0
2018-06-05 Perforation 3926.00 3926.50 3
2018-05-26 Perforation 5534.00 5534.50 4
2018-06-05 Perforation 3938.00 3938.50 3
2018-06-05 Perforation 3950.00 3950.50 4
2018-06-05 Perforation 3962.00 3962.50 3
2018-06-05 Perforation 3974.00 3974.50 3
2018-06-05 Multi-Stage Fracture 3926.00 3974.50 0
2018-06-06 Perforation 3866.00 3866.50 3
2018-06-06 Perforation 3878.00 3878.50 3
2018-06-06 Perforation 3890.00 3890.50 4
2018-06-06 Perforation 3902.00 3902.50 3
2018-06-06 Perforation 3914.00 3914.50 3
2018-05-26 Multi-Stage Fracture 5486.00 5534.50 0
2018-06-06 Multi-Stage Fracture 3866.00 3914.50 0
2018-06-07 Perforation 3806.00 3806.50 3
2018-06-07 Perforation 3818.00 3818.50 3
2018-06-07 Perforation 3830.00 3830.50 4
2018-06-07 Perforation 3842.00 3842.50 3
2018-06-07 Perforation 3854.00 3854.50 3
2018-06-07 Multi-Stage Fracture 3806.00 3854.50 0
2018-06-07 Perforation 3746.00 3746.50 3
2018-06-07 Perforation 3758.00 3758.50 3
2018-06-07 Perforation 3770.00 3770.50 4
2018-05-26 Perforation 5426.00 5426.50 4
2018-06-07 Perforation 3782.00 3782.50 3
2018-06-07 Perforation 3794.00 3794.50 3
2018-06-07 Multi-Stage Fracture 3746.00 3794.50 0
2018-06-07 Perforation 3686.00 3686.50 3
2018-06-07 Perforation 3698.00 3698.50 3
2018-06-07 Perforation 3710.00 3710.50 4
2018-06-07 Perforation 3722.00 3722.50 3
2018-06-07 Perforation 3734.00 3734.50 3
2018-06-07 Multi-Stage Fracture 3686.00 3734.50 0
2018-06-08 Perforation 3626.00 3626.50 3
2018-05-07 Perforation 5612.50 5613.00 2
2018-05-26 Perforation 5438.00 5438.50 4
2018-06-08 Perforation 3638.00 3638.50 3
2018-06-08 Perforation 3650.00 3650.50 4
2018-06-08 Perforation 3662.00 3662.50 3
2018-06-08 Perforation 3674.00 3674.50 3
2018-06-08 Multi-Stage Fracture 3626.00 3674.50 0
2018-06-08 Perforation 3566.00 3566.50 3
2018-06-08 Perforation 3578.00 3578.50 3
2018-06-08 Perforation 3590.00 3590.50 4
2018-06-08 Perforation 3602.00 3602.50 3
2018-06-08 Perforation 3614.00 3614.50 3
2018-05-26 Perforation 5450.00 5450.50 4
2018-06-08 Multi-Stage Fracture 3566.00 3614.50 0
2018-06-09 Perforation 3506.00 3506.50 3
2018-06-09 Perforation 3518.00 3518.50 3
2018-06-09 Perforation 3530.00 3530.50 4
2018-06-09 Perforation 3542.00 3542.50 3
2018-06-09 Perforation 3554.00 3554.50 3
2018-06-09 Multi-Stage Fracture 3506.00 3554.50 0
2018-06-09 Perforation 3446.00 3446.50 3
2018-06-09 Perforation 3458.00 3458.50 3
2018-06-09 Perforation 3470.00 3470.50 4
2018-05-26 Perforation 5462.00 5462.50 4
2018-06-09 Perforation 3482.00 3482.50 3
2018-06-09 Perforation 3494.00 3494.50 3
2018-06-09 Multi-Stage Fracture 3446.00 3494.50 0
2018-06-10 Perforation 3386.00 3386.50 3
2018-06-10 Perforation 3398.00 3398.50 3
2018-06-10 Perforation 3410.00 3410.50 4
2018-06-10 Perforation 3422.00 3422.50 3
2018-06-10 Perforation 3434.00 3434.50 3
2018-06-10 Multi-Stage Fracture 3386.00 3434.50 0
2018-06-10 Perforation 3326.00 3326.50 3
2018-05-26 Perforation 5474.00 5474.50 3
2018-06-10 Perforation 3338.00 3338.50 3
2018-06-10 Perforation 3350.00 3350.50 4
2018-06-10 Perforation 3362.00 3362.50 3
2018-06-10 Perforation 3374.00 3374.50 3
2018-06-10 Multi-Stage Fracture 3326.00 3374.50 0
2018-06-13 Perforation 3266.00 3266.50 3
2018-06-13 Perforation 3278.00 3278.50 3
2018-06-13 Perforation 3290.00 3290.50 4
2018-06-13 Perforation 3302.00 3302.50 3
2018-06-13 Perforation 3314.00 3314.50 3
2018-05-26 Multi-Stage Fracture 5426.00 5474.50 0
2018-06-13 Multi-Stage Fracture 3266.00 3314.50 0
2018-06-14 Perforation 3206.00 3206.50 3
2018-06-14 Perforation 3218.00 3218.50 3
2018-06-14 Perforation 3230.00 3230.50 4
2018-06-14 Perforation 3242.00 3242.50 3
2018-06-14 Perforation 3254.00 3254.50 3
2018-06-14 Multi-Stage Fracture 3206.00 3254.50 0
2018-05-26 Perforation 5366.00 5366.50 4
2018-05-26 Perforation 5378.00 5378.50 4
2018-05-26 Perforation 5390.00 5390.50 4
2018-05-26 Perforation 5402.00 5402.50 4
2018-05-26 Perforation 5414.00 5414.50 3
2018-05-07 Perforation 5625.00 5625.50 2
2018-05-26 Multi-Stage Fracture 5366.00 5414.50 0
2018-05-27 Perforation 5306.00 5306.50 3
2018-05-27 Perforation 5318.00 5318.50 4
2018-05-27 Perforation 5330.00 5330.50 4
2018-05-27 Perforation 5342.00 5342.50 4
2018-05-27 Perforation 5354.00 5354.50 3
2018-05-27 Multi-Stage Fracture 5306.00 5354.50 0
2018-05-27 Perforation 5246.00 5246.50 3
2018-05-27 Perforation 5258.00 5258.50 4
2018-05-27 Perforation 5270.00 5270.50 4
2018-05-07 Perforation 5637.50 5638.00 2
2018-05-27 Perforation 5282.00 5282.50 4
2018-05-27 Perforation 5294.00 5294.50 3
2018-05-27 Multi-Stage Fracture 5246.00 5294.50 0
2018-05-27 Perforation 5186.00 5186.50 3
2018-05-27 Perforation 5198.00 5198.50 4
2018-05-27 Perforation 5210.00 5210.50 4
2018-05-27 Perforation 5222.00 5222.50 4
2018-05-27 Perforation 5234.00 5234.50 3
2018-05-27 Multi-Stage Fracture 5186.00 5234.50 0
2018-05-28 Perforation 5126.00 5126.50 3
2018-05-07 Perforation 5650.00 5650.50 2
2018-05-28 Perforation 5138.00 5138.50 4
2018-05-28 Perforation 5150.00 5150.50 4
2018-05-28 Perforation 5162.00 5162.50 4
2018-05-28 Perforation 5174.00 5174.50 3
2018-05-28 Multi-Stage Fracture 5126.00 5174.50 0
2018-05-28 Perforation 5066.00 5066.50 3
2018-05-28 Perforation 5078.00 5078.50 4
2018-05-28 Perforation 5090.00 5090.50 4
2018-05-28 Perforation 5102.00 5102.50 3
2018-05-28 Perforation 5114.00 5114.50 3
2018-05-07 Multi-Stage Fracture 5612.50 5669.20 0
2018-05-28 Multi-Stage Fracture 5066.00 5114.50 0
2018-05-29 Perforation 5006.00 5006.50 3
2018-05-29 Perforation 5018.00 5018.50 4
2018-05-29 Perforation 5030.00 5030.50 4
2018-05-29 Perforation 5042.00 5042.50 3
2018-05-29 Perforation 5054.00 5054.50 3
2018-05-29 Multi-Stage Fracture 5006.00 5054.50 0
2018-05-29 Perforation 4946.00 4946.50 3
2018-05-29 Perforation 4958.00 4958.50 4
2018-05-29 Perforation 4970.00 4970.50 4
2018-05-25 Perforation 5546.00 5546.50 4
2018-05-29 Perforation 4982.00 4982.50 3
2018-05-29 Perforation 4994.00 4994.50 3
2018-05-29 Multi-Stage Fracture 4946.00 4994.50 0
2018-05-29 Perforation 4886.00 4886.50 3
2018-05-29 Perforation 4898.00 4898.50 4
2018-05-29 Perforation 4910.00 4910.50 4
2018-05-29 Perforation 4922.00 4922.50 3
2018-05-29 Perforation 4934.00 4934.50 3
2018-05-29 Multi-Stage Fracture 4886.00 4934.50 0
2018-05-30 Perforation 4826.00 4826.50 3
2018-05-25 Perforation 5558.00 5558.50 4
2018-05-30 Perforation 4838.00 4838.50 3
2018-05-30 Perforation 4850.00 4850.50 4
2018-05-30 Perforation 4862.00 4862.50 3
2018-05-30 Perforation 4874.00 4874.50 3
2018-05-30 Multi-Stage Fracture 4826.00 4874.50 0
2018-05-30 Perforation 4766.00 4766.50 3
2018-05-30 Perforation 4778.00 4778.50 3
2018-05-30 Perforation 4790.00 4790.50 4
2018-05-30 Perforation 4802.00 4802.50 3
2018-05-30 Perforation 4814.00 4814.50 3
2018-05-25 Perforation 5570.00 5570.50 4
2018-05-30 Multi-Stage Fracture 4766.00 4814.50 0
2018-05-30 Perforation 4706.00 4706.50 3
2018-05-30 Perforation 4718.00 4718.50 3
2018-05-30 Perforation 4730.00 4730.50 4
2018-05-30 Perforation 4742.00 4742.50 3
2018-05-30 Perforation 4754.00 4754.50 3
2018-05-30 Multi-Stage Fracture 4706.00 4754.50 0
2018-05-31 Perforation 4646.00 4646.50 3
2018-05-31 Perforation 4658.00 4658.50 3
2018-05-31 Perforation 4670.00 4670.50 4

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-07 2018-06-14 3,003 46,422 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 91.8849 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 5.1216 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.1942 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.4231 N/A
Water 7732-18-5 100 0.4231 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0093 N/A
Dibromoacetonitrile 3252-43-5 100 0.0093 N/A
Polyethylene Glycol 25322-68-3 100 0.0093 N/A
Sodium Bromide 7647-15-6 100 0.0093 N/A
Water 7732-18-5 100 0.0093 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0975 N/A
Non-hazardous Not Available 100 0.0975 N/A
Water 7732-18-5 100 0.0975 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0033 N/A
Methanol 67-56-1 100 0.0033 N/A
Modified thiourea polymer 68527-49-1 100 0.0033 N/A
Olefin 64743-02-8 100 0.0033 N/A
Polyoxyalkylenes 68951-67-7 100 0.0033 N/A
Propargyl alcohol 107-19-7 100 0.0033 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0008 N/A
Isopropanol 67-63-0 100 0.0008 N/A
Methanol 67-56-1 100 0.0008 N/A
ThinFrac MP BJ Services Friction Reducer Anionic terpolymer 12054 100 0.0907 N/A
Oxyalkylated alcohol 12054 100 0.0907 N/A
Petroleum distillates 64742-47-8 100 0.0907 N/A
Sodium chloride 7647-14-5 100 0.0907 N/A
Water 7732-18-5 100 0.0907 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0037 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0114 N/A
Water 7732-18-5 100 0.0114 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-05-23 2018-06-15 Surface Water - Runoff 46575

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5007 0.0 0.0 0.0
2019 8512 0.0 0.0 0.0
2020 2012 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-10 No Incident Encountered 0.00 0.00
2018-06-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References