X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475071605020

Well Details

Well ID: 0475071605020
Loading map...
Location: 02/05-16-047-07W5/0
Location Alias: 02/05-16-47-07 W5M
Location Alias 2: 02/05-16-047-07 W5/00
Province: Alberta
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA 102 HZ PEMBINA 5-16-47-7
Operator Name: Bonterra Energy Corp.
License Number: 0487619
License Date: 2018-01-11
License Status: Issued
Spud Date: 2018-02-28
Final Drill Date: 2018-03-07
Well Total Depth: 3859 m
Surface Hole Latitude: 53.037448
Surface Hole Longitude: -114.949226

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
28 Feb 2018 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-03-02 710
2018-03-03 1713 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-18 Multi-Stage Fracture 3841.7 3842.3 0
2018-03-18 Multi-Stage Fracture 3815.6 3817.5 0
2018-03-18 Multi-Stage Fracture 3788.2 3790.1 0
2018-03-18 Multi-Stage Fracture 3761.1 3763.1 0
2018-03-18 Multi-Stage Fracture 3733.4 3735.4 0
2018-03-18 Multi-Stage Fracture 3706.1 3708 0
2018-03-18 Multi-Stage Fracture 3678.4 3680.4 0
2018-03-18 Multi-Stage Fracture 3650.7 3652.6 0
2018-03-18 Multi-Stage Fracture 3623 3625 0
2018-03-18 Multi-Stage Fracture 3514.8 3516.7 0
2018-03-19 Multi-Stage Fracture 3486.8 3488.8 0
2018-03-19 Multi-Stage Fracture 3459 3460.9 0
2018-03-19 Multi-Stage Fracture 3431.5 3433.4 0
2018-03-19 Multi-Stage Fracture 3403.8 3405.7 0
2018-03-19 Multi-Stage Fracture 3376.6 3378.5 0
2018-03-19 Multi-Stage Fracture 3348.8 3350.7 0
2018-03-19 Multi-Stage Fracture 3321.1 3323 0
2018-03-19 Multi-Stage Fracture 3293.4 3295.3 0
2018-03-19 Multi-Stage Fracture 3265.6 3267.6 0
2018-03-19 Multi-Stage Fracture 3237.8 3239.8 0
2018-03-19 Multi-Stage Fracture 3210.1 3212 0
2018-03-19 Multi-Stage Fracture 3182.6 3184.5 0
2018-03-19 Multi-Stage Fracture 3155.2 3157.1 0
2018-03-19 Multi-Stage Fracture 3127.6 3129.6 0
2018-03-19 Multi-Stage Fracture 3099.7 3101.6 0
2018-03-19 Multi-Stage Fracture 3071.9 3073.8 0
2018-03-19 Multi-Stage Fracture 3044.5 3046.4 0
2018-03-19 Multi-Stage Fracture 2936.2 2938.1 0
2018-03-19 Multi-Stage Fracture 2908.5 2910.4 0
2018-03-19 Multi-Stage Fracture 2880.6 2882.5 0
2018-03-19 Multi-Stage Fracture 2853 2854.9 0
2018-03-19 Multi-Stage Fracture 2825.1 2827.1 0
2018-03-20 Multi-Stage Fracture 2797.4 2799.3 0
2018-03-20 Multi-Stage Fracture 2769.7 2771.6 0
2018-03-20 Multi-Stage Fracture 2742 2743.9 0
2018-03-20 Multi-Stage Fracture 2714.2 2716.1 0
2018-03-20 Multi-Stage Fracture 2686.2 2688.1 0
2018-03-20 Multi-Stage Fracture 2658.3 2660.2 0
2018-03-20 Multi-Stage Fracture 2630.6 2632.5 0
2018-03-20 Multi-Stage Fracture 2602.9 2604.9 0
2018-03-20 Multi-Stage Fracture 2575.2 2577.1 0
2018-03-20 Multi-Stage Fracture 2547.2 2549.2 0
2018-03-20 Multi-Stage Fracture 2519.5 2521.4 0
2018-03-20 Multi-Stage Fracture 2491.7 2493.6 0
2018-03-20 Multi-Stage Fracture 2463.9 2465.8 0
2018-03-20 Multi-Stage Fracture 2366.9 2368.8 0
2018-03-20 Multi-Stage Fracture 2339.4 2341.3 0
2018-03-20 Multi-Stage Fracture 2311.7 2313.7 0
2018-03-20 Multi-Stage Fracture 2284.3 2286.2 0
2018-03-20 Multi-Stage Fracture 2256.5 2258.4 0
2018-03-22 Multi-Stage Fracture 2146.6 2148.5 0
2018-03-22 Multi-Stage Fracture 2119.1 2121 0
2018-03-22 Multi-Stage Fracture 2091.2 2093.1 0
2018-03-22 Multi-Stage Fracture 2063.4 2065.3 0
2018-03-22 Multi-Stage Fracture 2035.6 2037.5 0
2018-03-22 Multi-Stage Fracture 2007.6 2009.5 0
2018-03-22 Multi-Stage Fracture 1979.8 1981.7 0
2018-03-22 Multi-Stage Fracture 1952 1953.9 0
2018-03-22 Multi-Stage Fracture 1924 1926 0
2018-03-22 Multi-Stage Fracture 1896.5 1898.4 0
2018-03-22 Multi-Stage Fracture 1788.8 1790.7 0
2018-03-22 Multi-Stage Fracture 1760.5 1762.4 0
2018-03-22 Multi-Stage Fracture 1732.6 1734.5 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
03/18/2018 03/22/2018 1.6-hexanediamine. dihydrochloride 6055-52-3 Clay Control 0.0858 Trican Well Service
Alcohols. C10-16. ethoxylated 68002-97-1 Friction Reducer 0.0497 Trican Well Service
distillates (petroleum). hydrotreated light 64742-47-8 Friction Reducer 0.0497 Trican Well Service

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
3/18/2018 3/22/2018 0:00 Surface Water - Runoff 730

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6249 175.1 0.0 12678.0
2019 1930 67.4 0.0 2911.7

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-09 No Incident N/A N/A
2018-03-22 No Incident N/A N/A

For data sources see[9]

References