X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475071605020

Well Details

Well ID: 0475071605020
Loading map...
Location: 02/05-16-047-07W5/0
Location Alias: 02/05-16-47-07 W5M
Location Alias 2: 02/05-16-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 16
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA 102 HZ PEMBINA 5-16-47-7
Operator Name: Bonterra Energy Corp.
License Number: 0487619
License Date: 2018-01-11
License Status: Issued
Spud Date: 2018-02-28
Final Drill Date: 2018-03-07
Well Total Depth: 3859.00 m
Surface Hole Latitude: 53.037448
Surface Hole Longitude: -114.949226

For data sources see[1][2]

Well History

Date Event
2018-01-11 Obtained License
2018-03-01 Surface Casing Operation Performed
2018-03-02 Direction Drilling Operation Performed - Deviate
2018-03-03 Direction Drilling Operation Performed - Horizontal
2018-03-07 Finished Drilling
2018-03-07 Well Log Performed
2018-03-07 Well Mode changed to Drilled and Cased
2018-03-09 Production Casing Operation Performed
2018-03-09 Rig Released
2018-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-07 Well Began Production
2018-04-07 Well Fluid changed to Crude Oil
2018-04-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-28 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-02 710.00 Deviate (5 - 79 degrees)
2018-03-03 1713.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-18 Multi-Stage Fracture 3841.70 3842.30 0
2018-03-18 Multi-Stage Fracture 3514.80 3516.70 0
2018-03-19 Multi-Stage Fracture 3486.80 3488.80 0
2018-03-19 Multi-Stage Fracture 3459.00 3460.90 0
2018-03-19 Multi-Stage Fracture 3431.50 3433.40 0
2018-03-19 Multi-Stage Fracture 3403.80 3405.70 0
2018-03-19 Multi-Stage Fracture 3376.60 3378.50 0
2018-03-19 Multi-Stage Fracture 3348.80 3350.70 0
2018-03-19 Multi-Stage Fracture 3321.10 3323.00 0
2018-03-19 Multi-Stage Fracture 3293.40 3295.30 0
2018-03-19 Multi-Stage Fracture 3265.60 3267.60 0
2018-03-18 Multi-Stage Fracture 3815.60 3817.50 0
2018-03-19 Multi-Stage Fracture 3237.80 3239.80 0
2018-03-19 Multi-Stage Fracture 3210.10 3212.00 0
2018-03-19 Multi-Stage Fracture 3182.60 3184.50 0
2018-03-19 Multi-Stage Fracture 3155.20 3157.10 0
2018-03-19 Multi-Stage Fracture 3127.60 3129.60 0
2018-03-19 Multi-Stage Fracture 3099.70 3101.60 0
2018-03-19 Multi-Stage Fracture 3071.90 3073.80 0
2018-03-19 Multi-Stage Fracture 3044.50 3046.40 0
2018-03-19 Multi-Stage Fracture 2936.20 2938.10 0
2018-03-19 Multi-Stage Fracture 2908.50 2910.40 0
2018-03-18 Multi-Stage Fracture 3788.20 3790.10 0
2018-03-19 Multi-Stage Fracture 2880.60 2882.50 0
2018-03-19 Multi-Stage Fracture 2853.00 2854.90 0
2018-03-19 Multi-Stage Fracture 2825.10 2827.10 0
2018-03-20 Multi-Stage Fracture 2797.40 2799.30 0
2018-03-20 Multi-Stage Fracture 2769.70 2771.60 0
2018-03-20 Multi-Stage Fracture 2742.00 2743.90 0
2018-03-20 Multi-Stage Fracture 2714.20 2716.10 0
2018-03-20 Multi-Stage Fracture 2686.20 2688.10 0
2018-03-20 Multi-Stage Fracture 2658.30 2660.20 0
2018-03-20 Multi-Stage Fracture 2630.60 2632.50 0
2018-03-18 Multi-Stage Fracture 3761.10 3763.10 0
2018-03-20 Multi-Stage Fracture 2602.90 2604.90 0
2018-03-20 Multi-Stage Fracture 2575.20 2577.10 0
2018-03-20 Multi-Stage Fracture 2547.20 2549.20 0
2018-03-20 Multi-Stage Fracture 2519.50 2521.40 0
2018-03-20 Multi-Stage Fracture 2491.70 2493.60 0
2018-03-20 Multi-Stage Fracture 2463.90 2465.80 0
2018-03-20 Multi-Stage Fracture 2366.90 2368.80 0
2018-03-20 Multi-Stage Fracture 2339.40 2341.30 0
2018-03-20 Multi-Stage Fracture 2311.70 2313.70 0
2018-03-20 Multi-Stage Fracture 2284.30 2286.20 0
2018-03-18 Multi-Stage Fracture 3733.40 3735.40 0
2018-03-20 Multi-Stage Fracture 2256.50 2258.40 0
2018-03-22 Multi-Stage Fracture 2146.60 2148.50 0
2018-03-22 Multi-Stage Fracture 2119.10 2121.00 0
2018-03-22 Multi-Stage Fracture 2091.20 2093.10 0
2018-03-22 Multi-Stage Fracture 2063.40 2065.30 0
2018-03-22 Multi-Stage Fracture 2035.60 2037.50 0
2018-03-22 Multi-Stage Fracture 2007.60 2009.50 0
2018-03-22 Multi-Stage Fracture 1979.80 1981.70 0
2018-03-22 Multi-Stage Fracture 1952.00 1953.90 0
2018-03-22 Multi-Stage Fracture 1924.00 1926.00 0
2018-03-18 Multi-Stage Fracture 3706.10 3708.00 0
2018-03-22 Multi-Stage Fracture 1896.50 1898.40 0
2018-03-22 Multi-Stage Fracture 1788.80 1790.70 0
2018-03-22 Multi-Stage Fracture 1760.50 1762.40 0
2018-03-22 Multi-Stage Fracture 1732.60 1734.50 0
2018-03-18 Multi-Stage Fracture 3678.40 3680.40 0
2018-03-18 Multi-Stage Fracture 3650.70 3652.60 0
2018-03-18 Multi-Stage Fracture 3623.00 3625.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-18 2018-03-22 1,574 6,275 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.8512 N/A
Sand - Tier 2 (20/40) Trican Well Service Aluminum Oxide 1344-28-1 100 12.7148 N/A
Crystalline silica. quartz 14808-60-7 100 12.7148 N/A
Iron Oxide 1309-37-1 100 12.7148 N/A
Titanium Oxide 13463-67-7 100 12.7147 N/A
Sand - Tier 2 (30/50) Trican Well Service Aluminum Oxide 1344-28-1 100 4.2382 N/A
Crystalline silica. quartz 14808-60-7 100 4.2382 N/A
Iron Oxide 1309-37-1 100 4.2382 N/A
Titanium Oxide 13463-67-7 100 4.2382 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.018 N/A
2-mercaptoethanol 60-24-2 100 0.018 N/A
dibromoacetonitrile 3252-43-5 100 0.018 N/A
non-hazardous ingredients Not Available 100 0.018 N/A
sodium bromide 7647-15-6 100 0.018 N/A
CC-7 (Clay Stabilizer) Trican Well Service Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0858 N/A
water Not Available 100 0.0858 N/A
FR-22 (Friction Reducer) Trican Well Service Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0497 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0497 N/A
non-hazardous ingredients Not Available 100 0.0497 N/A
MFR-2 (Metal Friction Reducer) Trican Well Service Friction Reducer No specific ingredients Not Available 100 0.0034 N/A
NMR-1 (Stimulation Surfactant) Trican Well Service Surfactant methanol 67-56-1 100 0.0384 N/A
non-hazardous ingredients Not Available 100 0.0384 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-18 2018-03-22 Surface Water - Runoff 730
2018-03-18 2018-03-22 Surface Water - Runoff 1142
2018-03-18 2018-03-22 Surface Water - Runoff 4319

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6249 0.0 0.0 0.0
2019 8520 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-09 No Incident Encountered 0.00 0.00
2018-03-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References