If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424012901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.639422,"lon":-110.104706,"icon":""}]} |
Location: 00/01-29-042-01W4/0 | |
Location Alias: 00/01-29-42-01 W4M | |
Location Alias 2: 00/01-29-042-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 01 | |
Section: 29 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN CHAUVINS 1-29-42-1 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0024293 | |
License Date: 1963-06-11 | |
License Status: RecCertified | |
Spud Date: 1963-06-11 | |
Final Drill Date: 1963-06-13 | |
Well Total Depth: 707.40 m | |
Surface Hole Latitude: 52.639422 | |
Surface Hole Longitude: -110.104706 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-06-11 | Obtained License |
1963-06-13 | Finished Drilling |
1963-06-13 | Well Mode changed to Drilled and Cased |
1963-06-14 | Drill Stem Test Performed |
1963-06-15 | Drill Stem Test Performed |
1963-06-16 | Production Casing Operation Performed |
1963-07-12 | Perforation Treatment Performed - Jet Perforation |
1963-07-23 | Well Began Production |
1963-07-23 | Well Fluid changed to Crude Oil |
1963-07-23 | Well Mode changed to Pumping |
1969-01-07 | Well Fluid changed to Crude Oil |
1969-01-07 | Well Mode changed to Suspended |
1974-06-01 | Well Fluid changed to Crude Oil |
1974-06-01 | Well Mode changed to Pumping |
1977-10-17 | Well Fluid changed to Crude Oil |
1977-10-17 | Well Mode changed to Suspended |
1983-02-25 | Well Fluid changed to Crude Oil |
1983-02-25 | Well Mode changed to Pumping |
1989-09-30 | Well Fluid changed to Crude Oil |
1989-09-30 | Well Mode changed to Suspended |
1990-11-22 | Well Fluid changed to Crude Oil |
1990-11-22 | Well Mode changed to Flowing |
1997-03-31 | Well Fluid changed to Crude Oil |
1997-03-31 | Well Mode changed to Suspended |
1999-05-20 | Perforation Treatment Performed - Jet Perforation |
2003-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-09-18 | Perforation Treatment Performed - Cement Plug |
2003-09-18 | Plug Back Performed |
2003-09-18 | Well Fluid changed to Crude Oil |
2003-09-18 | Well Log Performed |
2003-09-18 | Well Mode changed to Abandoned Zone |
2003-09-20 | Well Log Performed |
2003-09-22 | Perforation Treatment Performed - Jet Perforation |
2003-09-22 | Perforation Treatment Performed - Remedial Casing |
2003-09-22 | Well Log Performed |
2004-07-17 | Well Abandoned |
2004-07-17 | Well Fluid changed to Crude Oil |
2004-07-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-07-12 | Perforation | 608.40 | 610.20 | 13 |
1963-07-12 | Perforation | 611.40 | 614.80 | 13 |
1999-05-20 | Perforation | 600.80 | 601.80 | 13 |
2003-09-18 | Cement Plug | 597.30 | 605.30 | 0 |
2003-09-18 | Packing Device Capped w/Cement | 586.80 | 594.80 | 0 |
2003-09-22 | Perforation | 210.00 | 211.00 | 20 |
2003-09-22 | Remedial Casing Cementing | 210.00 | 211.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1152 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 1009 | 0.0 | 0.0 | 0.0 |
1975 | 3216 | 0.0 | 0.0 | 0.0 |
1976 | 1969 | 0.0 | 0.0 | 0.0 |
1977 | 1 | 0.0 | 0.0 | 0.0 |
1983 | 7166 | 0.0 | 0.0 | 0.0 |
1984 | 5835 | 0.0 | 0.0 | 0.0 |
1985 | 8048 | 0.0 | 0.0 | 0.0 |
1986 | 1304 | 0.0 | 0.0 | 0.0 |
1987 | 3683 | 0.0 | 0.0 | 0.0 |
1988 | 1440 | 0.0 | 0.0 | 0.0 |
1990 | 744 | 0.0 | 0.0 | 0.0 |
1991 | 8585 | 0.0 | 0.0 | 0.0 |
1992 | 5028 | 0.0 | 0.0 | 0.0 |
1993 | 7295 | 0.0 | 0.0 | 0.0 |
1994 | 6397 | 0.0 | 0.0 | 0.0 |
1995 | 7839 | 0.0 | 0.0 | 0.0 |
1996 | 4642 | 0.0 | 0.0 | 0.0 |
For data sources see[5]