X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424012901000

Well Details

Well ID: 0424012901000
Loading map...
Location: 00/01-29-042-01W4/0
Location Alias: 00/01-29-42-01 W4M
Location Alias 2: 00/01-29-042-01 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN CHAUVINS 1-29-42-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0024293
License Date: 1963-06-11
License Status: RecCertified
Spud Date: 1963-06-11
Final Drill Date: 1963-06-13
Well Total Depth: 707.40 m
Surface Hole Latitude: 52.639422
Surface Hole Longitude: -110.104706

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-06-11 Obtained License
1963-06-13 Finished Drilling
1963-06-13 Well Mode changed to Drilled and Cased
1963-06-14 Drill Stem Test Performed
1963-06-15 Drill Stem Test Performed
1963-06-16 Production Casing Operation Performed
1963-07-12 Perforation Treatment Performed - Jet Perforation
1963-07-23 Well Began Production
1963-07-23 Well Fluid changed to Crude Oil
1963-07-23 Well Mode changed to Pumping
1969-01-07 Well Fluid changed to Crude Oil
1969-01-07 Well Mode changed to Suspended
1974-06-01 Well Fluid changed to Crude Oil
1974-06-01 Well Mode changed to Pumping
1977-10-17 Well Fluid changed to Crude Oil
1977-10-17 Well Mode changed to Suspended
1983-02-25 Well Fluid changed to Crude Oil
1983-02-25 Well Mode changed to Pumping
1989-09-30 Well Fluid changed to Crude Oil
1989-09-30 Well Mode changed to Suspended
1990-11-22 Well Fluid changed to Crude Oil
1990-11-22 Well Mode changed to Flowing
1997-03-31 Well Fluid changed to Crude Oil
1997-03-31 Well Mode changed to Suspended
1999-05-20 Perforation Treatment Performed - Jet Perforation
2003-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-18 Perforation Treatment Performed - Cement Plug
2003-09-18 Plug Back Performed
2003-09-18 Well Fluid changed to Crude Oil
2003-09-18 Well Log Performed
2003-09-18 Well Mode changed to Abandoned Zone
2003-09-20 Well Log Performed
2003-09-22 Perforation Treatment Performed - Jet Perforation
2003-09-22 Perforation Treatment Performed - Remedial Casing
2003-09-22 Well Log Performed
2004-07-17 Well Abandoned
2004-07-17 Well Fluid changed to Crude Oil
2004-07-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-07-12 Perforation 608.40 610.20 13
1963-07-12 Perforation 611.40 614.80 13
1999-05-20 Perforation 600.80 601.80 13
2003-09-18 Cement Plug 597.30 605.30 0
2003-09-18 Packing Device Capped w/Cement 586.80 594.80 0
2003-09-22 Perforation 210.00 211.00 20
2003-09-22 Remedial Casing Cementing 210.00 211.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1152 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1974 1009 0.0 0.0 0.0
1975 3216 0.0 0.0 0.0
1976 1969 0.0 0.0 0.0
1977 1 0.0 0.0 0.0
1983 7166 0.0 0.0 0.0
1984 5835 0.0 0.0 0.0
1985 8048 0.0 0.0 0.0
1986 1304 0.0 0.0 0.0
1987 3683 0.0 0.0 0.0
1988 1440 0.0 0.0 0.0
1990 744 0.0 0.0 0.0
1991 8585 0.0 0.0 0.0
1992 5028 0.0 0.0 0.0
1993 7295 0.0 0.0 0.0
1994 6397 0.0 0.0 0.0
1995 7839 0.0 0.0 0.0
1996 4642 0.0 0.0 0.0

For data sources see[5]

References