X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0394242311002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0394242311002
 
| Well ID: 0394242311002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.3704485, -113.3545599 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.371350, -113.354398 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/11-23-039-24W4/2
 +
|-
 +
| Location Alias: 00/11-23-39-24 W4M
 +
|-
 +
| Location Alias 2: 00/11-23-039-24 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 039
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 23
 +
|-
 +
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]]
 
|-
 
|-
 
| Well Name: FAIRBORNE CLIVE 6-23-39-24
 
| Well Name: FAIRBORNE CLIVE 6-23-39-24
 
|-
 
|-
| Operator:
+
| Operator Name: [[Tourmaline Oil Corp.]]
 +
|-
 +
| License Number: 0132893
 
|-
 
|-
 
| License Date: 1988-03-04
 
| License Date: 1988-03-04
 
|-
 
|-
| Final Drilling Date: 1988-03-21
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1988-03-09
 +
|-
 +
| Final Drill Date: 1988-03-21
 +
|-
 +
| Well Total Depth: 1938.00 m
 +
|-
 +
| Surface Hole Latitude: 52.371350
 +
|-
 +
| Surface Hole Longitude: -113.354398
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1988-03-04
 +
| Obtained License
 +
|-
 +
| 1988-03-10
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1988-03-21
 +
| Finished Drilling
 +
|-
 +
| 1988-03-21
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1988-03-22
 +
| Well Log Performed
 +
|-
 +
| 1988-03-23
 +
| Drill Stem Test Performed
 +
|-
 +
| 1988-03-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 1988-03-26
 +
| Rig Released
 +
|-
 +
| 1988-03-31
 +
| Well Log Performed
 +
|-
 +
| 1988-04-02
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1988-04-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-04-02
 +
| Well Log Performed
 +
|-
 +
| 1988-04-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-04-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1988-04-04
 +
| Well Log Performed
 +
|-
 +
| 1988-04-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1988-04-06
 +
| Well Log Performed
 +
|-
 +
| 1988-04-07
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1988-04-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-04-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1988-04-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-04-12
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1988-04-13
 +
| Well Log Performed
 +
|-
 +
| 1988-04-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1988-04-16
 +
| Well Log Performed
 +
|-
 +
| 1988-04-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1988-04-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-05-15
 +
| Well Began Production
 +
|-
 +
| 1988-05-15
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1988-05-15
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1991-04-18
 +
| Well Log Performed
 +
|-
 +
| 1991-04-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1991-04-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1991-04-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1991-06-26
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1991-06-27
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-04-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-04-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-04-27
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-04-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1993-05-05
 +
| Well Log Performed
 +
|-
 +
| 1993-05-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-05-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-05-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1993-05-12
 +
| Plug Back Performed
 +
|-
 +
| 1993-05-12
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1993-05-12
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1996-05-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-05-08
 +
| Plug Back Performed
 +
|-
 +
| 1996-06-03
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1996-06-03
 +
| Well Mode changed to Abandoned and Whipstocked
 +
|-
 +
| 1996-08-01
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1988-04-02
 +
| Perforation
 +
| style="text-align: right;" | 1903.00
 +
| style="text-align: right;" | 1904.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1988-04-12
 +
| Acid Wash
 +
| style="text-align: right;" | 1864.00
 +
| style="text-align: right;" | 1865.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-04-14
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1864.00
 +
| style="text-align: right;" | 1865.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-04-17
 +
| Perforation
 +
| style="text-align: right;" | 1866.00
 +
| style="text-align: right;" | 1866.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1988-04-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 1866.00
 +
| style="text-align: right;" | 1866.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1991-04-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1903.00
 +
| style="text-align: right;" | 1904.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1991-04-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1866.00
 +
| style="text-align: right;" | 1866.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1991-04-25
 +
| Perforation
 +
| style="text-align: right;" | 1898.50
 +
| style="text-align: right;" | 1900.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1991-04-30
 +
| Perforation
 +
| style="text-align: right;" | 1856.50
 +
| style="text-align: right;" | 1858.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1991-06-26
 +
| Acid Treatment
 +
| style="text-align: right;" | 1856.50
 +
| style="text-align: right;" | 1858.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1991-06-27
 +
| Acid Treatment
 +
| style="text-align: right;" | 1856.50
 +
| style="text-align: right;" | 1858.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-04-02
 +
| Acid Wash
 +
| style="text-align: right;" | 1903.00
 +
| style="text-align: right;" | 1904.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-04-22
 +
| Acid Treatment
 +
| style="text-align: right;" | 1898.50
 +
| style="text-align: right;" | 1900.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-04-24
 +
| Acid Treatment
 +
| style="text-align: right;" | 1856.50
 +
| style="text-align: right;" | 1858.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-04-27
 +
| Acid Treatment
 +
| style="text-align: right;" | 1856.50
 +
| style="text-align: right;" | 1858.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-04-30
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1856.50
 +
| style="text-align: right;" | 1858.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 1938.0m
+
| 1993-05-06
 +
| Perforation
 +
| style="text-align: right;" | 1862.00
 +
| style="text-align: right;" | 1863.00
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1993-05-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 1862.00
 +
| style="text-align: right;" | 1863.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Abandoned and Whipstocked
+
| 1993-05-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1862.00
 +
| style="text-align: right;" | 1863.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 1996-05-08
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1879.00
 +
| style="text-align: right;" | 1887.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Horizontal
+
| 1988-04-03
 +
| Perforation
 +
| style="text-align: right;" | 1870.50
 +
| style="text-align: right;" | 1871.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Violations:
+
| 1988-04-04
 +
| Acid Treatment
 +
| style="text-align: right;" | 1870.50
 +
| style="text-align: right;" | 1871.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 52.3704485
+
| 1988-04-05
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1870.50
 +
| style="text-align: right;" | 1871.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -113.3545599
+
| 1988-04-07
 +
| Perforation
 +
| style="text-align: right;" | 1867.00
 +
| style="text-align: right;" | 1868.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1988-04-07
 +
| Acid Wash
 +
| style="text-align: right;" | 1867.00
 +
| style="text-align: right;" | 1871.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-04-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1867.00
 +
| style="text-align: right;" | 1868.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-04-11
 +
| Perforation
 +
| style="text-align: right;" | 1864.00
 +
| style="text-align: right;" | 1865.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 4969
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 8037
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1990
 +
| style="text-align: right;" | 8474
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1991
 +
| style="text-align: right;" | 7678
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1992
 +
| style="text-align: right;" | 1848
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:04, 18 January 2021

Well Details

Well ID: 0394242311002
Loading map...
Location: 00/11-23-039-24W4/2
Location Alias: 00/11-23-39-24 W4M
Location Alias 2: 00/11-23-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 23
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 6-23-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0132893
License Date: 1988-03-04
License Status: Suspension
Spud Date: 1988-03-09
Final Drill Date: 1988-03-21
Well Total Depth: 1938.00 m
Surface Hole Latitude: 52.371350
Surface Hole Longitude: -113.354398

For data sources see[1][2]

Well History

Date Event
1988-03-04 Obtained License
1988-03-10 Surface Casing Operation Performed
1988-03-21 Finished Drilling
1988-03-21 Well Mode changed to Drilled and Cased
1988-03-22 Well Log Performed
1988-03-23 Drill Stem Test Performed
1988-03-25 Production Casing Operation Performed
1988-03-26 Rig Released
1988-03-31 Well Log Performed
1988-04-02 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-02 Perforation Treatment Performed - Jet Perforation
1988-04-02 Well Log Performed
1988-04-03 Perforation Treatment Performed - Jet Perforation
1988-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-04 Well Log Performed
1988-04-05 Perforation Treatment Performed - Cement Squeeze
1988-04-06 Well Log Performed
1988-04-07 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-07 Perforation Treatment Performed - Jet Perforation
1988-04-09 Perforation Treatment Performed - Cement Squeeze
1988-04-11 Perforation Treatment Performed - Jet Perforation
1988-04-12 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-13 Well Log Performed
1988-04-14 Perforation Treatment Performed - Cement Squeeze
1988-04-16 Well Log Performed
1988-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-17 Perforation Treatment Performed - Jet Perforation
1988-05-15 Well Began Production
1988-05-15 Well Fluid changed to Crude Oil
1988-05-15 Well Mode changed to Pumping
1991-04-18 Well Log Performed
1991-04-20 Perforation Treatment Performed - Cement Squeeze
1991-04-25 Perforation Treatment Performed - Jet Perforation
1991-04-30 Perforation Treatment Performed - Jet Perforation
1991-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-30 Perforation Treatment Performed - Cement Squeeze
1993-05-05 Well Log Performed
1993-05-06 Perforation Treatment Performed - Jet Perforation
1993-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-12 Perforation Treatment Performed - Cement Squeeze
1993-05-12 Plug Back Performed
1993-05-12 Well Fluid changed to Crude Oil
1993-05-12 Well Mode changed to Abandoned Zone
1996-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-08 Plug Back Performed
1996-06-03 Well Fluid changed to Crude Oil
1996-06-03 Well Mode changed to Abandoned and Whipstocked
1996-08-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-04-02 Perforation 1903.00 1904.00 13
1988-04-12 Acid Wash 1864.00 1865.00 0
1988-04-14 Cement Squeeze 1864.00 1865.00 0
1988-04-17 Perforation 1866.00 1866.30 13
1988-04-17 Acid Treatment 1866.00 1866.30 0
1991-04-20 Cement Squeeze 1903.00 1904.00 0
1991-04-20 Cement Squeeze 1866.00 1866.30 0
1991-04-25 Perforation 1898.50 1900.50 17
1991-04-30 Perforation 1856.50 1858.50 17
1991-06-26 Acid Treatment 1856.50 1858.50 0
1991-06-27 Acid Treatment 1856.50 1858.50 0
1988-04-02 Acid Wash 1903.00 1904.00 0
1993-04-22 Acid Treatment 1898.50 1900.50 0
1993-04-24 Acid Treatment 1856.50 1858.50 0
1993-04-27 Acid Treatment 1856.50 1858.50 0
1993-04-30 Cement Squeeze 1856.50 1858.50 0
1993-05-06 Perforation 1862.00 1863.00 17
1993-05-12 Acid Treatment 1862.00 1863.00 0
1993-05-12 Cement Squeeze 1862.00 1863.00 0
1996-05-08 Packing Device Capped w/Cement 1879.00 1887.00 0
1988-04-03 Perforation 1870.50 1871.50 13
1988-04-04 Acid Treatment 1870.50 1871.50 0
1988-04-05 Cement Squeeze 1870.50 1871.50 0
1988-04-07 Perforation 1867.00 1868.50 13
1988-04-07 Acid Wash 1867.00 1871.50 0
1988-04-09 Cement Squeeze 1867.00 1868.50 0
1988-04-11 Perforation 1864.00 1865.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4969 0.0 0.0 0.0
1989 8037 0.0 0.0 0.0
1990 8474 0.0 0.0 0.0
1991 7678 0.0 0.0 0.0
1992 1848 0.0 0.0 0.0

For data sources see[5]

References