X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242311002

Well Details

Well ID: 0394242311002
Loading map...
Location: 00/11-23-039-24W4/2
Location Alias: 00/11-23-39-24 W4M
Location Alias 2: 00/11-23-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 23
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 6-23-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0132893
License Date: 1988-03-04
License Status: Suspension
Spud Date: 1988-03-09
Final Drill Date: 1988-03-21
Well Total Depth: 1938.00 m
Surface Hole Latitude: 52.371350
Surface Hole Longitude: -113.354398

For data sources see[1][2]

Well History

Date Event
1988-03-04 Obtained License
1988-03-10 Surface Casing Operation Performed
1988-03-21 Finished Drilling
1988-03-21 Well Mode changed to Drilled and Cased
1988-03-22 Well Log Performed
1988-03-23 Drill Stem Test Performed
1988-03-25 Production Casing Operation Performed
1988-03-26 Rig Released
1988-03-31 Well Log Performed
1988-04-02 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-02 Perforation Treatment Performed - Jet Perforation
1988-04-02 Well Log Performed
1988-04-03 Perforation Treatment Performed - Jet Perforation
1988-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-04 Well Log Performed
1988-04-05 Perforation Treatment Performed - Cement Squeeze
1988-04-06 Well Log Performed
1988-04-07 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-07 Perforation Treatment Performed - Jet Perforation
1988-04-09 Perforation Treatment Performed - Cement Squeeze
1988-04-11 Perforation Treatment Performed - Jet Perforation
1988-04-12 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-13 Well Log Performed
1988-04-14 Perforation Treatment Performed - Cement Squeeze
1988-04-16 Well Log Performed
1988-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-17 Perforation Treatment Performed - Jet Perforation
1988-05-15 Well Began Production
1988-05-15 Well Fluid changed to Crude Oil
1988-05-15 Well Mode changed to Pumping
1991-04-18 Well Log Performed
1991-04-20 Perforation Treatment Performed - Cement Squeeze
1991-04-25 Perforation Treatment Performed - Jet Perforation
1991-04-30 Perforation Treatment Performed - Jet Perforation
1991-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-30 Perforation Treatment Performed - Cement Squeeze
1993-05-05 Well Log Performed
1993-05-06 Perforation Treatment Performed - Jet Perforation
1993-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-12 Perforation Treatment Performed - Cement Squeeze
1993-05-12 Plug Back Performed
1993-05-12 Well Fluid changed to Crude Oil
1993-05-12 Well Mode changed to Abandoned Zone
1996-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-08 Plug Back Performed
1996-06-03 Well Fluid changed to Crude Oil
1996-06-03 Well Mode changed to Abandoned and Whipstocked
1996-08-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-04-02 Perforation 1903.00 1904.00 13
1988-04-12 Acid Wash 1864.00 1865.00 0
1988-04-14 Cement Squeeze 1864.00 1865.00 0
1988-04-17 Perforation 1866.00 1866.30 13
1988-04-17 Acid Treatment 1866.00 1866.30 0
1991-04-20 Cement Squeeze 1903.00 1904.00 0
1991-04-20 Cement Squeeze 1866.00 1866.30 0
1991-04-25 Perforation 1898.50 1900.50 17
1991-04-30 Perforation 1856.50 1858.50 17
1991-06-26 Acid Treatment 1856.50 1858.50 0
1991-06-27 Acid Treatment 1856.50 1858.50 0
1988-04-02 Acid Wash 1903.00 1904.00 0
1993-04-22 Acid Treatment 1898.50 1900.50 0
1993-04-24 Acid Treatment 1856.50 1858.50 0
1993-04-27 Acid Treatment 1856.50 1858.50 0
1993-04-30 Cement Squeeze 1856.50 1858.50 0
1993-05-06 Perforation 1862.00 1863.00 17
1993-05-12 Acid Treatment 1862.00 1863.00 0
1993-05-12 Cement Squeeze 1862.00 1863.00 0
1996-05-08 Packing Device Capped w/Cement 1879.00 1887.00 0
1988-04-03 Perforation 1870.50 1871.50 13
1988-04-04 Acid Treatment 1870.50 1871.50 0
1988-04-05 Cement Squeeze 1870.50 1871.50 0
1988-04-07 Perforation 1867.00 1868.50 13
1988-04-07 Acid Wash 1867.00 1871.50 0
1988-04-09 Cement Squeeze 1867.00 1868.50 0
1988-04-11 Perforation 1864.00 1865.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4969 0.0 0.0 0.0
1989 8037 0.0 0.0 0.0
1990 8474 0.0 0.0 0.0
1991 7678 0.0 0.0 0.0
1992 1848 0.0 0.0 0.0

For data sources see[5]

References