If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354100710F20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.9913,"lon":-111.417607,"icon":""}]} |
Location: F2/10-07-035-10W4/0 | |
Location Alias: F2/10-07-35-10 W4M | |
Location Alias 2: F2/10-07-035-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 10 | |
Section: 07 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: APACHE HAMIL WW A10-7-35-10 | |
Operator Name: Brae Canada Ltd. | |
License Number: 0032825 | |
License Date: 1967-09-27 | |
License Status: RecExempt | |
Spud Date: 1967-09-27 | |
Final Drill Date: 1967-10-02 | |
Well Total Depth: 308.20 m | |
Surface Hole Latitude: 51.991300 | |
Surface Hole Longitude: -111.417607 |
Date | Event |
---|---|
1967-09-27 | Obtained License |
1967-10-02 | Finished Drilling |
1967-10-02 | Perforation Treatment Performed - Open-Hole Completion |
1967-10-02 | Rig Released |
1967-10-02 | Surface Casing Operation Performed |
1967-10-02 | Well Mode changed to Drilled and Cased |
1967-10-21 | Well Began Production |
1967-10-21 | Well Fluid changed to Water |
1967-10-21 | Well Type changed to Source |
1969-08-07 | Perforation Treatment Performed - Cement Plug |
1969-08-07 | Perforation Treatment Performed - Cement Squeeze |
1969-08-07 | Perforation Treatment Performed - Jet Perforation |
1969-08-07 | Perforation Treatment Performed - Open-Hole Completion |
1969-08-07 | Plug Back Performed |
1969-08-07 | Production Casing Operation Performed |
1969-08-07 | Well Abandoned |
1969-08-07 | Well Fluid changed to Water |
1969-08-07 | Well Mode changed to Abandoned |
1969-08-07 | Well Type changed to Source |
1969-08-11 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-10-02 | Open Hole/Barefoot Completion | 86.90 | 115.80 | 0 |
1969-08-07 | Perforation | 239.00 | 240.20 | 7 |
1969-08-07 | Perforation | 241.40 | 244.40 | 7 |
1969-08-07 | Perforation | 255.70 | 258.50 | 7 |
1969-08-07 | Perforation | 262.70 | 277.40 | 7 |
1969-08-07 | Perforation | 281.90 | 294.70 | 7 |
1969-08-07 | Cement Plug | 86.90 | 308.20 | 0 |
1969-08-07 | Open Hole/Barefoot Completion | 86.90 | 308.20 | 0 |
1969-08-07 | Cement Squeeze | 86.90 | 308.20 | 0 |
1969-08-07 | Perforation | 160.00 | 164.60 | 7 |
1969-08-07 | Perforation | 183.50 | 188.10 | 7 |
1969-08-07 | Perforation | 201.20 | 204.20 | 7 |
1969-08-07 | Perforation | 208.20 | 209.70 | 7 |
1969-08-07 | Perforation | 216.40 | 220.10 | 7 |
1969-08-07 | Perforation | 233.50 | 234.70 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]