X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354100710F20

Well Details

Well ID: 0354100710F20
Loading map...
Location: F2/10-07-035-10W4/0
Location Alias: F2/10-07-35-10 W4M
Location Alias 2: F2/10-07-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 07
County/Municipality: County of Paintearth No. 18
Well Name: APACHE HAMIL WW A10-7-35-10
Operator Name: Brae Canada Ltd.
License Number: 0032825
License Date: 1967-09-27
License Status: RecExempt
Spud Date: 1967-09-27
Final Drill Date: 1967-10-02
Well Total Depth: 308.20 m
Surface Hole Latitude: 51.991300
Surface Hole Longitude: -111.417607

For data sources see[1][2]

Well History

Date Event
1967-09-27 Obtained License
1967-10-02 Finished Drilling
1967-10-02 Perforation Treatment Performed - Open-Hole Completion
1967-10-02 Rig Released
1967-10-02 Surface Casing Operation Performed
1967-10-02 Well Mode changed to Drilled and Cased
1967-10-21 Well Began Production
1967-10-21 Well Fluid changed to Water
1967-10-21 Well Type changed to Source
1969-08-07 Perforation Treatment Performed - Cement Plug
1969-08-07 Perforation Treatment Performed - Cement Squeeze
1969-08-07 Perforation Treatment Performed - Jet Perforation
1969-08-07 Perforation Treatment Performed - Open-Hole Completion
1969-08-07 Plug Back Performed
1969-08-07 Production Casing Operation Performed
1969-08-07 Well Abandoned
1969-08-07 Well Fluid changed to Water
1969-08-07 Well Mode changed to Abandoned
1969-08-07 Well Type changed to Source
1969-08-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-10-02 Open Hole/Barefoot Completion 86.90 115.80 0
1969-08-07 Perforation 239.00 240.20 7
1969-08-07 Perforation 241.40 244.40 7
1969-08-07 Perforation 255.70 258.50 7
1969-08-07 Perforation 262.70 277.40 7
1969-08-07 Perforation 281.90 294.70 7
1969-08-07 Cement Plug 86.90 308.20 0
1969-08-07 Open Hole/Barefoot Completion 86.90 308.20 0
1969-08-07 Cement Squeeze 86.90 308.20 0
1969-08-07 Perforation 160.00 164.60 7
1969-08-07 Perforation 183.50 188.10 7
1969-08-07 Perforation 201.20 204.20 7
1969-08-07 Perforation 208.20 209.70 7
1969-08-07 Perforation 216.40 220.10 7
1969-08-07 Perforation 233.50 234.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0

For data sources see[5]

References