X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0345013301000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0345013301000
 
| Well ID: 0345013301000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.957355, -114.076232 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.957355, -114.076232 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/01-33-034-01W5/0
 
| Location: 00/01-33-034-01W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/01-33-034-01 W5/00
 
| Location Alias 2: 00/01-33-034-01 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 034
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 01
 +
|-
 +
| Section: 33
 
|-
 
|-
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
Line 17: Line 27:
 
| Well Name: CLEARBROOK INNIS 1-33-34-1
 
| Well Name: CLEARBROOK INNIS 1-33-34-1
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Enhance Energy Inc.]]
 
|-
 
|-
 
| License Number: 0016558
 
| License Number: 0016558
Line 29: Line 39:
 
| Final Drill Date: 1959-03-08
 
| Final Drill Date: 1959-03-08
 
|-
 
|-
| Well Total Depth: 2661.8 m
+
| Well Total Depth: 2661.80 m
 
|-
 
|-
 
| Surface Hole Latitude: 51.957355
 
| Surface Hole Latitude: 51.957355
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1959-01-09
 +
| Obtained License
 +
|-
 +
| 1959-03-05
 +
| Production Casing Operation Performed
 +
|-
 +
| 1959-03-08
 +
| Finished Drilling
 +
|-
 +
| 1959-03-08
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1959-03-08
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1959-03-13
 +
| Well Began Production
 +
|-
 +
| 1959-03-13
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1959-03-13
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1988-11-22
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1988-11-22
 +
| Plug Back Performed
 +
|-
 +
| 1988-11-22
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1988-11-22
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2008-01-20
 +
| Well Log Performed
 +
|-
 +
| 2008-01-23
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2008-02-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-02-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-02-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-02-02
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-02-04
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-02-04
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-02-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-02-06
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-02-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-02-10
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-02-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-02-13
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-14
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2008-02-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-02-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-02-20
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 201:
 
| 1959-03-08
 
| 1959-03-08
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 2657.9
+
| style="text-align: right;" | 2657.90
| style="text-align: right;" | 2661.8
+
| style="text-align: right;" | 2661.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988-11-22
 
| 1988-11-22
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2609
+
| style="text-align: right;" | 2609.00
| style="text-align: right;" | 2620
+
| style="text-align: right;" | 2620.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-01-23
 
| 2008-01-23
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 2657.9
+
| style="text-align: right;" | 2657.90
| style="text-align: right;" | 2661.8
+
| style="text-align: right;" | 2661.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-01
 
| 2008-02-01
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2632
+
| style="text-align: right;" | 2632.00
| style="text-align: right;" | 2641
+
| style="text-align: right;" | 2641.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-01
 
| 2008-02-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2178
+
| style="text-align: right;" | 2178.00
| style="text-align: right;" | 2179
+
| style="text-align: right;" | 2179.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-02-02
 
| 2008-02-02
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 2178
+
| style="text-align: right;" | 2178.00
| style="text-align: right;" | 2179
+
| style="text-align: right;" | 2179.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-02
 
| 2008-02-02
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2161.5
+
| style="text-align: right;" | 2161.50
| style="text-align: right;" | 2171.5
+
| style="text-align: right;" | 2171.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-03
 
| 2008-02-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2129
+
| style="text-align: right;" | 2129.00
| style="text-align: right;" | 2130
+
| style="text-align: right;" | 2130.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-02-04
 
| 2008-02-04
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 2129
+
| style="text-align: right;" | 2129.00
| style="text-align: right;" | 2130
+
| style="text-align: right;" | 2130.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-04
 
| 2008-02-04
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2042
+
| style="text-align: right;" | 2042.00
| style="text-align: right;" | 2122
+
| style="text-align: right;" | 2122.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-05
 
| 2008-02-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1906
+
| style="text-align: right;" | 1906.00
| style="text-align: right;" | 1907
+
| style="text-align: right;" | 1907.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-02-06
 
| 2008-02-06
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1906
+
| style="text-align: right;" | 1906.00
| style="text-align: right;" | 1907
+
| style="text-align: right;" | 1907.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-06
 
| 2008-02-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1874
+
| style="text-align: right;" | 1874.00
| style="text-align: right;" | 1898
+
| style="text-align: right;" | 1898.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-07
 
| 2008-02-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1293
+
| style="text-align: right;" | 1293.00
| style="text-align: right;" | 1294
+
| style="text-align: right;" | 1294.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-02-10
 
| 2008-02-10
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1293
+
| style="text-align: right;" | 1293.00
| style="text-align: right;" | 1294
+
| style="text-align: right;" | 1294.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-10
 
| 2008-02-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1090
+
| style="text-align: right;" | 1090.00
| style="text-align: right;" | 1296
+
| style="text-align: right;" | 1296.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-11
 
| 2008-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1084
+
| style="text-align: right;" | 1084.00
| style="text-align: right;" | 1085
+
| style="text-align: right;" | 1085.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-02-13
 
| 2008-02-13
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1084
+
| style="text-align: right;" | 1084.00
| style="text-align: right;" | 1085
+
| style="text-align: right;" | 1085.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-13
 
| 2008-02-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 648.2
+
| style="text-align: right;" | 648.20
| style="text-align: right;" | 1080
+
| style="text-align: right;" | 1080.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-14
 
| 2008-02-14
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 555
+
| style="text-align: right;" | 555.00
| style="text-align: right;" | 648.2
+
| style="text-align: right;" | 648.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-19
 
| 2008-02-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 548
+
| style="text-align: right;" | 548.00
| style="text-align: right;" | 549
+
| style="text-align: right;" | 549.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-02-20
 
| 2008-02-20
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 548
+
| style="text-align: right;" | 548.00
| style="text-align: right;" | 549
+
| style="text-align: right;" | 549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-20
 
| 2008-02-20
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 344
+
| style="text-align: right;" | 344.00
| style="text-align: right;" | 544
+
| style="text-align: right;" | 544.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 214: Line 341:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 247: Line 388:
 
| 1961
 
| 1961
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 2193.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1966
 
| 1966
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 809.0
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 259: Line 400:
 
| 1986
 
| 1986
 
| style="text-align: right;" | 2193
 
| style="text-align: right;" | 2193
| style="text-align: right;" | 457.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 4455.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 267: Line 408:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 05:16, 13 July 2020

Well Details

Well ID: 0345013301000
Loading map...
Location: 00/01-33-034-01W5/0
Location Alias: 00/01-33-34-01 W5M
Location Alias 2: 00/01-33-034-01 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 01
Section: 33
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 1-33-34-1
Operator Name: Enhance Energy Inc.
License Number: 0016558
License Date: 1959-01-09
License Status: Suspension
Spud Date: 1959-01-27
Final Drill Date: 1959-03-08
Well Total Depth: 2661.80 m
Surface Hole Latitude: 51.957355
Surface Hole Longitude: -114.076232

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-01-09 Obtained License
1959-03-05 Production Casing Operation Performed
1959-03-08 Finished Drilling
1959-03-08 Perforation Treatment Performed - Open-Hole Completion
1959-03-08 Well Mode changed to Drilled and Cased
1959-03-13 Well Began Production
1959-03-13 Well Fluid changed to Crude Oil
1959-03-13 Well Mode changed to Flowing
1988-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-22 Plug Back Performed
1988-11-22 Well Fluid changed to Crude Oil
1988-11-22 Well Mode changed to Abandoned Zone
2008-01-20 Well Log Performed
2008-01-23 Perforation Treatment Performed - Open-Hole Completion
2008-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-01 Perforation Treatment Performed - Jet Perforation
2008-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-02 Perforation Treatment Performed - Remedial Casing
2008-02-03 Perforation Treatment Performed - Jet Perforation
2008-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-04 Perforation Treatment Performed - Remedial Casing
2008-02-05 Perforation Treatment Performed - Jet Perforation
2008-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-06 Perforation Treatment Performed - Remedial Casing
2008-02-07 Perforation Treatment Performed - Jet Perforation
2008-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-10 Perforation Treatment Performed - Remedial Casing
2008-02-11 Perforation Treatment Performed - Jet Perforation
2008-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-13 Perforation Treatment Performed - Remedial Casing
2008-02-14 Perforation Treatment Performed - Cement Plug
2008-02-19 Perforation Treatment Performed - Jet Perforation
2008-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-20 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-03-08 Open Hole/Barefoot Completion 2657.90 2661.80 0
1988-11-22 Packing Device Capped w/Cement 2609.00 2620.00 0
2008-01-23 Open Hole/Barefoot Completion 2657.90 2661.80 0
2008-02-01 Packing Device Capped w/Cement 2632.00 2641.00 0
2008-02-01 Perforation 2178.00 2179.00 20
2008-02-02 Remedial Casing Cementing 2178.00 2179.00 0
2008-02-02 Packing Device Capped w/Cement 2161.50 2171.50 0
2008-02-03 Perforation 2129.00 2130.00 20
2008-02-04 Remedial Casing Cementing 2129.00 2130.00 0
2008-02-04 Packing Device Capped w/Cement 2042.00 2122.00 0
2008-02-05 Perforation 1906.00 1907.00 20
2008-02-06 Remedial Casing Cementing 1906.00 1907.00 0
2008-02-06 Packing Device Capped w/Cement 1874.00 1898.00 0
2008-02-07 Perforation 1293.00 1294.00 20
2008-02-10 Remedial Casing Cementing 1293.00 1294.00 0
2008-02-10 Packing Device Capped w/Cement 1090.00 1296.00 0
2008-02-11 Perforation 1084.00 1085.00 20
2008-02-13 Remedial Casing Cementing 1084.00 1085.00 0
2008-02-13 Packing Device Capped w/Cement 648.20 1080.00 0
2008-02-14 Cement Plug 555.00 648.20 0
2008-02-19 Perforation 548.00 549.00 20
2008-02-20 Remedial Casing Cementing 548.00 549.00 0
2008-02-20 Packing Device Capped w/Cement 344.00 544.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1986 2193 0.0 0.0 0.0

For data sources see[5]

References