X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0325032214020"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0325032214020
 
| Well ID: 0325032214020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.75057700000002114, -114.3498939999999493 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.750577, -114.349894 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/14-22-032-03W5/0
 
| Location: 02/14-22-032-03W5/0
 
|-
 
|-
| Well Name: PBN ET AL 102 HZ HARME 14-22-32-3
+
| Location Alias: 02/14-22-32-03 W5M
 +
|-
 +
| Location Alias 2: 02/14-22-032-03 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 032
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 22
 +
|-
 +
| County/Municipality: [[Mountain View County,_Alberta|Mountain View County]]
 +
|-
 +
| Well Name: RIDGEBACK HARME 14-22-32-3
 +
|-
 +
| Operator Name: [[Ridgeback Resources Inc.]]
 +
|-
 +
| License Number: 0445297
 
|-
 
|-
 
| License Date: 2012-04-09
 
| License Date: 2012-04-09
 
|-
 
|-
| Final Drilling Date: 2012-07-27
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2012-07-15
 +
|-
 +
| Final Drill Date: 2012-07-27
 +
|-
 +
| Well Total Depth: 3524.00 m
 +
|-
 +
| Surface Hole Latitude: 51.750577
 +
|-
 +
| Surface Hole Longitude: -114.349894
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-04-09
 +
| Obtained License
 +
|-
 +
| 2012-07-17
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-07-20
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2012-07-21
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2012-07-27
 +
| Finished Drilling
 +
|-
 +
| 2012-07-27
 +
| Well Log Performed
 +
|-
 +
| 2012-07-27
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-07-28
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2012-07-28
 +
| Production Casing Operation Performed
 +
|-
 +
| 2012-07-29
 +
| Rig Released
 +
|-
 +
| 2012-08-09
 +
| Well Log Performed
 +
|-
 +
| 2012-08-16
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-08-17
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-08-19
 +
| Well Began Production
 +
|-
 +
| 2012-08-19
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2012-08-19
 +
| Well Mode changed to Pumping
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
| 2012-07-15
 +
| [[Savanna Drilling Corp.]]
 +
| style="text-align: right;" | 652E
 +
| style="text-align: right;" | N/A
 +
| Drill To LD
 +
|-
 +
| 2012-07-15
 +
| [[Savanna Drilling Corp.]]
 +
| style="text-align: right;" | 652E
 +
| style="text-align: right;" | N/A
 +
| Drill To LD
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-09 }}</ref>
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2012-07-20
 +
| style="text-align: right;" | 1624.50
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2012-07-21
 +
| style="text-align: right;" | 2121.30
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-07-28
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 3520.00
 +
| style="text-align: right;" | 3524.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3494.10
 +
| style="text-align: right;" | 3494.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3426.70
 +
| style="text-align: right;" | 3426.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3365.60
 +
| style="text-align: right;" | 3365.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3290.90
 +
| style="text-align: right;" | 3291.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3229.70
 +
| style="text-align: right;" | 3229.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3156.30
 +
| style="text-align: right;" | 3156.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3093.80
 +
| style="text-align: right;" | 3093.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3031.10
 +
| style="text-align: right;" | 3031.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2958.10
 +
| style="text-align: right;" | 2958.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2896.80
 +
| style="text-align: right;" | 2896.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2822.20
 +
| style="text-align: right;" | 2822.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-16
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2762.10
 +
| style="text-align: right;" | 2762.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2687.50
 +
| style="text-align: right;" | 2687.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2628.70
 +
| style="text-align: right;" | 2628.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2556.00
 +
| style="text-align: right;" | 2556.10
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 3524.0m
+
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2496.10
 +
| style="text-align: right;" | 2496.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2420.70
 +
| style="text-align: right;" | 2420.80
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Flowing
+
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2361.20
 +
| style="text-align: right;" | 2361.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2286.90
 +
| style="text-align: right;" | 2287.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Horizontal
+
| 2012-08-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2226.80
 +
| style="text-align: right;" | 2226.90
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 51.75057700000002114
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| Longitude: -114.3498939999999493
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 2352
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8696
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8591
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8153
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8513
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8591
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 7646
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8383
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2183
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-07-29
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2012-08-23
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 05:11, 12 July 2020

Well Details

Well ID: 0325032214020
Loading map...
Location: 02/14-22-032-03W5/0
Location Alias: 02/14-22-32-03 W5M
Location Alias 2: 02/14-22-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 22
County/Municipality: Mountain View County
Well Name: RIDGEBACK HARME 14-22-32-3
Operator Name: Ridgeback Resources Inc.
License Number: 0445297
License Date: 2012-04-09
License Status: Issued
Spud Date: 2012-07-15
Final Drill Date: 2012-07-27
Well Total Depth: 3524.00 m
Surface Hole Latitude: 51.750577
Surface Hole Longitude: -114.349894

For data sources see[1][2]

Well History

Date Event
2012-04-09 Obtained License
2012-07-17 Surface Casing Operation Performed
2012-07-20 Direction Drilling Operation Performed - Deviate
2012-07-21 Direction Drilling Operation Performed - Horizontal
2012-07-27 Finished Drilling
2012-07-27 Well Log Performed
2012-07-27 Well Mode changed to Drilled and Cased
2012-07-28 Perforation Treatment Performed - Open-Hole Completion
2012-07-28 Production Casing Operation Performed
2012-07-29 Rig Released
2012-08-09 Well Log Performed
2012-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-19 Well Began Production
2012-08-19 Well Fluid changed to Crude Oil
2012-08-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-15 Savanna Drilling Corp. 652E N/A Drill To LD
2012-07-15 Savanna Drilling Corp. 652E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-20 1624.50 Deviate (5 - 79 degrees)
2012-07-21 2121.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-28 Open Hole/Barefoot Completion 3520.00 3524.00 0
2012-08-16 Multi-Stage Fracture 3494.10 3494.20 0
2012-08-16 Multi-Stage Fracture 3426.70 3426.80 0
2012-08-16 Multi-Stage Fracture 3365.60 3365.70 0
2012-08-16 Multi-Stage Fracture 3290.90 3291.00 0
2012-08-16 Multi-Stage Fracture 3229.70 3229.80 0
2012-08-16 Multi-Stage Fracture 3156.30 3156.40 0
2012-08-16 Multi-Stage Fracture 3093.80 3093.90 0
2012-08-16 Multi-Stage Fracture 3031.10 3031.20 0
2012-08-16 Multi-Stage Fracture 2958.10 2958.20 0
2012-08-16 Multi-Stage Fracture 2896.80 2896.90 0
2012-08-16 Multi-Stage Fracture 2822.20 2822.30 0
2012-08-16 Multi-Stage Fracture 2762.10 2762.20 0
2012-08-17 Multi-Stage Fracture 2687.50 2687.60 0
2012-08-17 Multi-Stage Fracture 2628.70 2628.80 0
2012-08-17 Multi-Stage Fracture 2556.00 2556.10 0
2012-08-17 Multi-Stage Fracture 2496.10 2496.20 0
2012-08-17 Multi-Stage Fracture 2420.70 2420.80 0
2012-08-17 Multi-Stage Fracture 2361.20 2361.30 0
2012-08-17 Multi-Stage Fracture 2286.90 2287.00 0
2012-08-17 Multi-Stage Fracture 2226.80 2226.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2352 0.0 0.0 0.0
2013 8696 0.0 0.0 0.0
2014 8591 0.0 0.0 0.0
2015 8153 0.0 0.0 0.0
2016 8513 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 7646 0.0 0.0 0.0
2019 8383 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-29 No Incident Encountered 0.00 0.00
2012-08-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References