If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0275030801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.300809,"lon":-114.382106,"icon":""}]} |
Location: 00/01-08-027-03W5/0 | |
Location Alias: 00/01-08-27-03 W5M | |
Location Alias 2: 00/01-08-027-03 W5/00 | |
Province: Alberta | |
County/Municipality: Rocky View County | |
Well Name: RIDGEBACK LOCHEND 1-8-27-3 | |
Operator Name: NAL Resources Limited | |
License Number: 0433073 | |
License Date: 2011-04-20 | |
License Status: Issued | |
Spud Date: 2011-08-09 | |
Final Drill Date: 2011-08-30 | |
Well Total Depth: 3634 m | |
Surface Hole Latitude: 51.300809 | |
Surface Hole Longitude: -114.382106 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-15 | 1908 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-02 | Open Hole/Barefoot Completion | 3587 | 3634 | 0 |
2011-09-18 | Multi-Stage Fracture | 3595.4 | 3595.5 | 0 |
2011-09-18 | Multi-Stage Fracture | 3526 | 3526.1 | 0 |
2011-09-18 | Multi-Stage Fracture | 3474.9 | 3475 | 0 |
2011-09-18 | Multi-Stage Fracture | 3412.3 | 3412.4 | 0 |
2011-09-18 | Multi-Stage Fracture | 3350.4 | 3350.5 | 0 |
2011-09-18 | Multi-Stage Fracture | 3288 | 3288.1 | 0 |
2011-09-18 | Multi-Stage Fracture | 3237.2 | 3237.3 | 0 |
2011-09-19 | Multi-Stage Fracture | 3174.1 | 3174.2 | 0 |
2011-09-19 | Multi-Stage Fracture | 3111 | 3111.1 | 0 |
2011-09-19 | Multi-Stage Fracture | 3059.8 | 3059.9 | 0 |
2011-09-19 | Multi-Stage Fracture | 2997.6 | 2997.7 | 0 |
2011-09-19 | Multi-Stage Fracture | 2935 | 2935.1 | 0 |
2011-09-19 | Multi-Stage Fracture | 2883.6 | 2883.7 | 0 |
2011-09-19 | Multi-Stage Fracture | 2821.5 | 2821.6 | 0 |
2011-09-19 | Multi-Stage Fracture | 2758.4 | 2758.5 | 0 |
2011-09-19 | Multi-Stage Fracture | 2696.6 | 2696.7 | 0 |
2011-09-19 | Multi-Stage Fracture | 2646 | 2646.1 | 0 |
2011-09-19 | Multi-Stage Fracture | 2595.1 | 2595.2 | 0 |
2011-09-19 | Multi-Stage Fracture | 2532.2 | 2532.3 | 0 |
2011-09-19 | Multi-Stage Fracture | 2458.5 | 2458.6 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2226 | 1197.4 | 0.0 | 0.0 |
2012 | 7629 | 2480.8 | 0.0 | 0.0 |
2013 | 6702 | 2347.1 | 0.0 | 0.0 |
2014 | 4927 | 1408.6 | 0.0 | 0.0 |
2015 | 8643 | 1628.8 | 0.0 | 0.0 |
2016 | 8757 | 1231.3 | 0.0 | 21.8 |
2017 | 8713 | 1074.3 | 0.0 | 37.0 |
2018 | 8637 | 827.7 | 0.0 | 13.8 |
2019 | 2016 | 140.7 | 0.0 | 0.6 |
For data sources see[5]