X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254250916020

Well Details

Well ID: 0254250916020
Loading map...
Location: 02/16-09-025-25W4/0
Location Alias: 02/16-09-25-25 W4M
Location Alias 2: 02/16-09-025-25 W4/00
Province: Alberta
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 16-9-25-25
Operator Name: Ember Resources Inc.
License Number: 0423754
License Date: 2010-09-22
License Status: Issued
Spud Date: 2010-10-10
Final Drill Date: 2010-10-11
Well Total Depth: 809 m
Surface Hole Latitude: 51.126946
Surface Hole Longitude: -113.426216

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2010-10-10 0

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-02 Perforation 253 256 13
2011-02-02 Perforation 468 471 13
2011-02-02 Perforation 777 780 13
2011-02-18 Fracture 253 256 0
2011-02-18 Fracture 468 471 0
2011-02-18 Fracture 777 780 0
2011-03-01 Perforation 480.5 481.5 13
2011-03-01 Perforation 485.3 487.3 13
2011-03-01 Perforation 475.1 475.6 13
2011-03-01 Perforation 448.2 448.7 13
2011-03-01 Perforation 453.9 454.9 13
2011-03-01 Perforation 499.1 502.1 13
2011-03-01 Perforation 568.5 569 13
2011-03-01 Perforation 581.2 582.2 13
2011-03-01 Perforation 565.6 566.1 13
2011-03-01 Perforation 535.7 536.2 13
2011-03-01 Perforation 562.5 564 13
2011-03-01 Perforation 438 439 13
2011-03-01 Perforation 294.9 295.4 13
2011-03-01 Perforation 298 298.5 13
2011-03-01 Perforation 286 286.5 13
2011-03-01 Perforation 262.9 263.4 13
2011-03-01 Perforation 276.6 277.1 13
2011-03-01 Perforation 320.6 321.1 13
2011-03-01 Perforation 430.3 432.3 13
2011-03-01 Perforation 434.2 435.2 13
2011-03-01 Perforation 426 426.5 13
2011-03-01 Perforation 345.2 345.7 13
2011-03-01 Perforation 403.5 404 13
2011-03-01 Perforation 266 268 13
2011-03-01 Perforation 273 274 13
2011-03-01 Perforation 245 246 13
2011-03-01 Perforation 226 228 13
2011-03-01 Perforation 230 232 13
2011-03-01 Perforation 303 305 13
2011-03-01 Perforation 340 341 13
2011-03-01 Perforation 542.5 544.5 13
2011-03-01 Perforation 328 331 13
2011-03-01 Perforation 307 310 13
2011-03-01 Perforation 313 315 13
2011-03-01 Perforation 639.3 639.8 13
2011-03-01 Perforation 642.7 643.2 13
2011-03-01 Perforation 638 638.5 13
2011-03-01 Perforation 588.8 590.8 13
2011-03-01 Perforation 595.5 597 13
2011-03-01 Perforation 644.8 645.3 13
2011-03-01 Perforation 597.2 598.2 13
2011-03-08 Fracture 262.9 263.4 0
2011-03-08 Fracture 562.5 598.2 0
2011-03-08 Fracture 480.5 536.2 0
2011-03-08 Fracture 345.2 454.9 0
2011-03-08 Fracture 320.6 321.1 0
2011-03-08 Fracture 276.6 298.5 0
2011-03-08 Fracture 266 274 0
2011-03-08 Fracture 303 315 0
2011-03-08 Fracture 328 341 0
2011-03-08 Fracture 638 645.3 0
2011-03-08 Fracture 542.5 544.5 0
2011-03-08 Fracture 245 246 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6909 143.6 0.0 0.3
2012 8189 140.9 0.0 0.0
2013 8639 137.7 0.0 4.3
2014 8655 111.3 0.0 0.0
2015 8661 92.9 0.0 2.0
2016 8699 96.5 0.0 7.8
2017 8708 114.0 0.0 3.1
2018 8750 101.6 0.0 0.0
2019 2153 18.1 0.0 0.0

For data sources see[5]

References