If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254250916020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.126946,"lon":-113.426216,"icon":""}]} |
Location: 02/16-09-025-25W4/0 | |
Location Alias: 02/16-09-25-25 W4M | |
Location Alias 2: 02/16-09-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 09 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 16-9-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423754 | |
License Date: 2010-09-22 | |
License Status: Issued | |
Spud Date: 2010-10-10 | |
Final Drill Date: 2010-10-11 | |
Well Total Depth: 809.00 m | |
Surface Hole Latitude: 51.126946 | |
Surface Hole Longitude: -113.426216 |
Date | Event |
---|---|
2010-09-22 | Obtained License |
2010-10-10 | Direction Drilling Operation Performed - Deviate |
2010-10-10 | Surface Casing Operation Performed |
2010-10-11 | Finished Drilling |
2010-10-11 | Production Casing Operation Performed |
2010-10-11 | Rig Released |
2010-10-11 | Well Mode changed to Drilled and Cased |
2010-10-14 | Well Log Performed |
2011-02-02 | Perforation Treatment Performed - Jet Perforation |
2011-02-18 | Perforation Treatment Performed - Fractured |
2011-03-01 | Perforation Treatment Performed - Jet Perforation |
2011-03-08 | Perforation Treatment Performed - Fractured |
2011-03-19 | Well Began Production |
2011-03-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-19 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-10 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-02 | Perforation | 253.00 | 256.00 | 13 |
2011-03-01 | Perforation | 448.20 | 448.70 | 13 |
2011-03-01 | Perforation | 453.90 | 454.90 | 13 |
2011-03-01 | Perforation | 499.10 | 502.10 | 13 |
2011-03-01 | Perforation | 568.50 | 569.00 | 13 |
2011-03-01 | Perforation | 581.20 | 582.20 | 13 |
2011-03-01 | Perforation | 565.60 | 566.10 | 13 |
2011-03-01 | Perforation | 535.70 | 536.20 | 13 |
2011-03-01 | Perforation | 562.50 | 564.00 | 13 |
2011-03-01 | Perforation | 438.00 | 439.00 | 13 |
2011-03-01 | Perforation | 294.90 | 295.40 | 13 |
2011-02-02 | Perforation | 468.00 | 471.00 | 13 |
2011-03-01 | Perforation | 298.00 | 298.50 | 13 |
2011-03-01 | Perforation | 286.00 | 286.50 | 13 |
2011-03-01 | Perforation | 262.90 | 263.40 | 13 |
2011-03-01 | Perforation | 276.60 | 277.10 | 13 |
2011-03-01 | Perforation | 320.60 | 321.10 | 13 |
2011-03-01 | Perforation | 430.30 | 432.30 | 13 |
2011-03-01 | Perforation | 434.20 | 435.20 | 13 |
2011-03-01 | Perforation | 426.00 | 426.50 | 13 |
2011-03-01 | Perforation | 345.20 | 345.70 | 13 |
2011-03-01 | Perforation | 403.50 | 404.00 | 13 |
2011-02-02 | Perforation | 777.00 | 780.00 | 13 |
2011-03-01 | Perforation | 266.00 | 268.00 | 13 |
2011-03-01 | Perforation | 273.00 | 274.00 | 13 |
2011-03-01 | Perforation | 245.00 | 246.00 | 13 |
2011-03-01 | Perforation | 226.00 | 228.00 | 13 |
2011-03-01 | Perforation | 230.00 | 232.00 | 13 |
2011-03-01 | Perforation | 303.00 | 305.00 | 13 |
2011-03-01 | Perforation | 340.00 | 341.00 | 13 |
2011-03-01 | Perforation | 542.50 | 544.50 | 13 |
2011-03-01 | Perforation | 328.00 | 331.00 | 13 |
2011-03-01 | Perforation | 307.00 | 310.00 | 13 |
2011-02-18 | Fracture | 253.00 | 256.00 | 0 |
2011-03-01 | Perforation | 313.00 | 315.00 | 13 |
2011-03-01 | Perforation | 639.30 | 639.80 | 13 |
2011-03-01 | Perforation | 642.70 | 643.20 | 13 |
2011-03-01 | Perforation | 638.00 | 638.50 | 13 |
2011-03-01 | Perforation | 588.80 | 590.80 | 13 |
2011-03-01 | Perforation | 595.50 | 597.00 | 13 |
2011-03-01 | Perforation | 644.80 | 645.30 | 13 |
2011-03-01 | Perforation | 597.20 | 598.20 | 13 |
2011-03-08 | Fracture | 262.90 | 263.40 | 0 |
2011-03-08 | Fracture | 562.50 | 598.20 | 0 |
2011-02-18 | Fracture | 468.00 | 471.00 | 0 |
2011-03-08 | Fracture | 480.50 | 536.20 | 0 |
2011-03-08 | Fracture | 345.20 | 454.90 | 0 |
2011-03-08 | Fracture | 320.60 | 321.10 | 0 |
2011-03-08 | Fracture | 276.60 | 298.50 | 0 |
2011-03-08 | Fracture | 266.00 | 274.00 | 0 |
2011-03-08 | Fracture | 303.00 | 315.00 | 0 |
2011-03-08 | Fracture | 328.00 | 341.00 | 0 |
2011-03-08 | Fracture | 638.00 | 645.30 | 0 |
2011-03-08 | Fracture | 542.50 | 544.50 | 0 |
2011-03-08 | Fracture | 245.00 | 246.00 | 0 |
2011-02-18 | Fracture | 777.00 | 780.00 | 0 |
2011-03-01 | Perforation | 480.50 | 481.50 | 13 |
2011-03-01 | Perforation | 485.30 | 487.30 | 13 |
2011-03-01 | Perforation | 475.10 | 475.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6909 | 0.0 | 0.0 | 0.0 |
2012 | 8189 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8661 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]