If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114242811002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.933455,"lon":-113.213073,"icon":""}]} |
Location: 00/11-28-011-24W4/2 | |
Location Alias: 00/11-28-11-24 W4M | |
Location Alias 2: 00/11-28-011-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 24 | |
Section: 28 | |
County/Municipality: Lethbridge County | |
Well Name: NEXEN KEHO 11-28-11-24 | |
Operator Name: TORC Oil & Gas Ltd. | |
License Number: 0428411 | |
License Date: 2010-12-20 | |
License Status: Suspension | |
Spud Date: 2011-01-17 | |
Final Drill Date: 2011-03-08 | |
Well Total Depth: 3522.00 m | |
Surface Hole Latitude: 49.933455 | |
Surface Hole Longitude: -113.213073 |
Date | Event |
---|---|
2010-12-20 | Obtained License |
2011-01-20 | Surface Casing Operation Performed |
2011-02-12 | Direction Drilling Operation Performed - Horizontal |
2011-02-27 | Intermediate Casing Operation Performed |
2011-03-08 | Finished Drilling |
2011-03-08 | Well Mode changed to Drilled and Cased |
2011-03-09 | Well Log Performed |
2011-03-11 | Rig Released |
2011-03-23 | Well Log Performed |
2011-03-26 | Well Log Performed |
2011-03-30 | Perforation Treatment Performed - Open-Hole Completion |
2011-04-15 | Well Log Performed |
2011-04-17 | Perforation Treatment Performed - Jet Perforation |
2011-04-17 | Well Log Performed |
2011-04-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-21 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-04-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-27 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-04-28 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-04-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-04-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-02 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-05-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-03 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-05-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-05-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-09 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-05-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-05-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-11 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-05-11 | Perforation Treatment Performed - Fractured |
2011-05-12 | Perforation Treatment Performed - Jet Perforation |
2011-05-14 | Perforation Treatment Performed - Jet Perforation |
2011-05-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-23 | Well Began Production |
2011-05-23 | Well Fluid changed to Crude Oil |
2011-05-23 | Well Mode changed to Pumping |
2011-05-25 | Well Log Performed |
2013-02-01 | Well Fluid changed to Crude Oil |
2013-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-12 | 2003.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-30 | Open Hole/Barefoot Completion | 2371.00 | 3521.00 | 0 |
2011-04-29 | Hydra Jet Perforation | 3177.50 | 3177.60 | 0 |
2011-04-29 | Multi-Stage Fracture | 3177.50 | 3177.60 | 0 |
2011-04-29 | Hydra Jet Perforation | 3131.00 | 3131.10 | 0 |
2011-04-29 | Multi-Stage Fracture | 3131.00 | 3131.10 | 0 |
2011-04-29 | Hydra Jet Perforation | 3037.50 | 3037.60 | 0 |
2011-05-01 | Multi-Stage Fracture | 3037.50 | 3037.60 | 0 |
2011-05-02 | Hydra Jet Perforation | 2962.10 | 2962.20 | 0 |
2011-05-02 | Multi-Stage Fracture | 2962.10 | 2962.20 | 0 |
2011-05-03 | Hydra Jet Perforation | 2881.80 | 2881.90 | 0 |
2011-05-06 | Multi-Stage Fracture | 2881.80 | 2881.90 | 0 |
2011-04-17 | Perforation | 3450.80 | 3450.90 | 17 |
2011-05-06 | Hydra Jet Perforation | 2813.30 | 2813.40 | 0 |
2011-05-08 | Multi-Stage Fracture | 2813.30 | 2813.40 | 0 |
2011-05-09 | Hydra Jet Perforation | 2757.00 | 2757.10 | 0 |
2011-05-09 | Multi-Stage Fracture | 2757.00 | 2757.10 | 0 |
2011-05-10 | Hydra Jet Perforation | 2700.30 | 2700.40 | 0 |
2011-05-10 | Multi-Stage Fracture | 2700.30 | 2700.40 | 0 |
2011-05-11 | Hydra Jet Perforation | 2548.30 | 2548.40 | 0 |
2011-05-11 | Fracture | 2548.30 | 2548.40 | 0 |
2011-05-12 | Perforation | 2498.90 | 2499.00 | 17 |
2011-05-14 | Perforation | 2467.90 | 2468.00 | 17 |
2011-04-18 | Multi-Stage Fracture | 3450.80 | 3450.90 | 0 |
2011-05-16 | Multi-Stage Fracture | 2467.90 | 2468.00 | 0 |
2011-04-21 | Hydra Jet Perforation | 3360.10 | 3360.20 | 0 |
2011-04-21 | Multi-Stage Fracture | 3360.10 | 3360.20 | 0 |
2011-04-27 | Hydra Jet Perforation | 3325.40 | 3325.60 | 0 |
2011-04-28 | Multi-Stage Fracture | 3325.50 | 3325.60 | 0 |
2011-04-28 | Hydra Jet Perforation | 3253.00 | 3253.10 | 0 |
2011-04-28 | Multi-Stage Fracture | 3253.00 | 3253.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3097 | 0.0 | 0.0 | 0.0 |
2012 | 7146 | 0.0 | 0.0 | 0.0 |
For data sources see[6]