If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096081003022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.443419,"lon":-119.245128,"icon":""}]} |
Location: 02/03-10-109-08W6/2 | |
Location Alias: 02/03-10-09-08 W6M | |
Location Alias 2: 02/03-10-109-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 08 | |
Section: 10 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW A3-10-109-8 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0028065 | |
License Date: 1965-03-30 | |
License Status: Issued | |
Spud Date: 1965-03-25 | |
Final Drill Date: 1965-04-30 | |
Well Total Depth: 2114.10 m | |
Surface Hole Latitude: 58.443419 | |
Surface Hole Longitude: -119.245128 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-03-30 | Obtained License |
1965-04-20 | Drill Stem Test Performed |
1965-04-30 | Finished Drilling |
1965-04-30 | Well Mode changed to Drilled and Cased |
1965-05-02 | Drill Stem Test Performed |
1965-05-02 | Well Log Performed |
1965-05-03 | Drill Stem Test Performed |
1965-05-04 | Liner Casing Operation Performed |
1965-11-16 | Perforation Treatment Performed - Bullet Perforation |
1965-11-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
1965-11-24 | Perforation Treatment Performed - Acid Wash - No Pressure |
1965-11-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1969-12-19 | Perforation Treatment Performed - Jet Perforation |
1969-12-20 | Perforation Treatment Performed - Acid Wash - No Pressure |
1982-12-09 | Perforation Treatment Performed - Jet Perforation |
1982-12-10 | Perforation Treatment Performed - Jet Perforation |
1992-01-04 | Perforation Treatment Performed - Jet Perforation |
1992-01-04 | Well Log Performed |
1992-01-06 | Well Log Performed |
1992-01-07 | Perforation Treatment Performed - Jet Perforation |
1992-01-07 | Well Log Performed |
1992-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-11 | Perforation Treatment Performed - Cement Squeeze |
1998-07-16 | Well Log Performed |
1998-07-17 | Perforation Treatment Performed - Jet Perforation |
1998-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-23 | Well Log Performed |
1998-07-25 | Perforation Treatment Performed - Cement Squeeze |
1998-07-27 | Well Log Performed |
1998-07-28 | Perforation Treatment Performed - Jet Perforation |
1998-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-08-01 | Well Log Performed |
2006-07-16 | Perforation Treatment Performed - Jet Perforation |
2009-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-06-14 | Well Log Performed |
2011-08-13 | Perforation Treatment Performed - Cement Squeeze |
2011-08-19 | Well Log Performed |
2011-08-20 | Well Log Performed |
2011-08-21 | Perforation Treatment Performed - Jet Perforation |
2011-08-21 | Well Log Performed |
2011-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-23 | Well Log Performed |
2011-08-25 | Well Log Performed |
2011-08-26 | Perforation Treatment Performed - Jet Perforation |
2011-08-26 | Well Log Performed |
2011-08-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-28 | Perforation Treatment Performed - Remedial Casing |
2011-08-29 | Perforation Treatment Performed - Jet Perforation |
2011-08-29 | Well Log Performed |
2011-09-03 | Well Log Performed |
2011-09-04 | Perforation Treatment Performed - Remedial Casing |
2011-09-11 | Production Casing Operation Performed |
2011-09-23 | Well Log Performed |
2012-03-05 | Well Began Injection |
2012-03-05 | Well Fluid changed to Water |
2012-03-05 | Well Type changed to Injection |
2012-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-02-05 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-11-16 | Bullet Perforation | 1837.50 | 1839.50 | 7 |
1965-11-19 | Acid Wash | 1837.50 | 1839.50 | 0 |
1965-11-24 | Acid Wash | 1837.50 | 1839.50 | 0 |
1965-11-25 | Acid Wash | 1837.50 | 1839.50 | 0 |
1969-12-19 | Perforation | 1827.90 | 1830.60 | 7 |
1969-12-20 | Acid Wash | 1827.90 | 1830.60 | 0 |
1982-12-09 | Perforation | 1801.40 | 1802.90 | 13 |
1982-12-10 | Perforation | 1797.50 | 1800.50 | 13 |
1992-01-04 | Perforation | 1812.00 | 1815.00 | 13 |
1992-01-07 | Perforation | 1806.00 | 1809.00 | 13 |
1992-01-09 | Acid Treatment | 1806.00 | 1809.00 | 0 |
1998-07-11 | Cement Squeeze | 1837.50 | 1839.50 | 0 |
1998-07-11 | Cement Squeeze | 1827.90 | 1830.60 | 0 |
1998-07-11 | Cement Squeeze | 1812.00 | 1815.00 | 0 |
1998-07-11 | Cement Squeeze | 1806.00 | 1809.00 | 0 |
1998-07-11 | Cement Squeeze | 1801.40 | 1802.90 | 0 |
1998-07-11 | Cement Squeeze | 1797.50 | 1800.50 | 0 |
1998-07-17 | Perforation | 1841.00 | 1843.00 | 13 |
1998-07-17 | Perforation | 1834.00 | 1836.00 | 13 |
1998-07-17 | Perforation | 1829.00 | 1830.50 | 13 |
1998-07-17 | Perforation | 1823.00 | 1825.00 | 13 |
1998-07-17 | Perforation | 1814.00 | 1817.00 | 13 |
1998-07-17 | Perforation | 1801.00 | 1803.00 | 13 |
1998-07-18 | Acid Treatment | 1841.00 | 1843.00 | 0 |
1998-07-18 | Acid Treatment | 1834.00 | 1836.00 | 0 |
1998-07-19 | Acid Treatment | 1829.00 | 1830.50 | 0 |
1998-07-19 | Acid Treatment | 1823.00 | 1825.00 | 0 |
1998-07-19 | Acid Treatment | 1814.00 | 1817.00 | 0 |
1998-07-20 | Acid Treatment | 1801.00 | 1803.00 | 0 |
1998-07-20 | Acid Treatment | 1841.00 | 1843.00 | 0 |
1998-07-22 | Acid Treatment | 1841.00 | 1843.00 | 0 |
1998-07-25 | Cement Squeeze | 1829.00 | 1830.50 | 0 |
1998-07-25 | Cement Squeeze | 1823.00 | 1825.00 | 0 |
1998-07-28 | Perforation | 1841.00 | 1843.50 | 13 |
1998-07-28 | Perforation | 1834.00 | 1836.00 | 13 |
1998-07-28 | Perforation | 1829.50 | 1830.50 | 13 |
1998-07-28 | Perforation | 1823.00 | 1824.50 | 13 |
1998-07-29 | Acid Treatment | 1841.00 | 1843.50 | 0 |
1998-07-30 | Acid Treatment | 1834.00 | 1836.00 | 0 |
1998-07-30 | Acid Treatment | 1829.50 | 1830.50 | 0 |
1998-07-30 | Acid Treatment | 1823.00 | 1824.50 | 0 |
1998-07-31 | Acid Treatment | 1814.00 | 1817.00 | 0 |
1998-07-31 | Acid Treatment | 1801.00 | 1803.00 | 0 |
2006-07-16 | Perforation | 1847.00 | 1850.00 | 20 |
2006-07-16 | Perforation | 1844.50 | 1845.50 | 20 |
2009-10-22 | Acid Treatment | 1847.00 | 1850.00 | 0 |
2009-10-22 | Acid Treatment | 1844.00 | 1845.50 | 0 |
2009-10-22 | Acid Treatment | 1841.00 | 1843.00 | 0 |
2011-08-13 | Cement Squeeze | 1847.00 | 1850.00 | 0 |
2011-08-13 | Cement Squeeze | 1844.50 | 1845.50 | 0 |
2011-08-13 | Cement Squeeze | 1841.00 | 1843.00 | 0 |
2011-08-13 | Cement Squeeze | 1834.00 | 1836.00 | 0 |
2011-08-13 | Cement Squeeze | 1829.00 | 1830.50 | 0 |
2011-08-13 | Cement Squeeze | 1823.00 | 1825.00 | 0 |
2011-08-13 | Cement Squeeze | 1814.00 | 1817.00 | 0 |
2011-08-13 | Cement Squeeze | 1801.00 | 1803.00 | 0 |
2011-08-21 | Perforation | 1942.00 | 1948.00 | 13 |
2011-08-21 | Perforation | 1936.00 | 1942.00 | 13 |
2011-08-21 | Perforation | 1930.00 | 1936.00 | 13 |
2011-08-22 | Acid Treatment | 1942.00 | 1948.00 | 0 |
2011-08-22 | Acid Treatment | 1936.00 | 1942.00 | 0 |
2011-08-22 | Acid Treatment | 1930.00 | 1936.00 | 0 |
2011-08-26 | Perforation | 669.00 | 670.00 | 17 |
2011-08-27 | Acid Treatment | 669.00 | 670.00 | 0 |
2011-08-28 | Remedial Casing Cementing | 669.00 | 670.00 | 0 |
2011-08-29 | Perforation | 401.00 | 402.00 | 17 |
2011-09-04 | Remedial Casing Cementing | 401.00 | 402.00 | 0 |
2012-10-18 | Acid Treatment | 1930.00 | 1948.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]