X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096081003022

Well Details

Well ID: 1096081003022
Loading map...
Location: 02/03-10-109-08W6/2
Location Alias: 02/03-10-09-08 W6M
Location Alias 2: 02/03-10-109-08 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 10
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW A3-10-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0028065
License Date: 1965-03-30
License Status: Issued
Spud Date: 1965-03-25
Final Drill Date: 1965-04-30
Well Total Depth: 2114.10 m
Surface Hole Latitude: 58.443419
Surface Hole Longitude: -119.245128

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-30 Obtained License
1965-04-20 Drill Stem Test Performed
1965-04-30 Finished Drilling
1965-04-30 Well Mode changed to Drilled and Cased
1965-05-02 Drill Stem Test Performed
1965-05-02 Well Log Performed
1965-05-03 Drill Stem Test Performed
1965-05-04 Liner Casing Operation Performed
1965-11-16 Perforation Treatment Performed - Bullet Perforation
1965-11-19 Perforation Treatment Performed - Acid Wash - No Pressure
1965-11-24 Perforation Treatment Performed - Acid Wash - No Pressure
1965-11-25 Perforation Treatment Performed - Acid Wash - No Pressure
1969-12-19 Perforation Treatment Performed - Jet Perforation
1969-12-20 Perforation Treatment Performed - Acid Wash - No Pressure
1982-12-09 Perforation Treatment Performed - Jet Perforation
1982-12-10 Perforation Treatment Performed - Jet Perforation
1992-01-04 Perforation Treatment Performed - Jet Perforation
1992-01-04 Well Log Performed
1992-01-06 Well Log Performed
1992-01-07 Perforation Treatment Performed - Jet Perforation
1992-01-07 Well Log Performed
1992-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-11 Perforation Treatment Performed - Cement Squeeze
1998-07-16 Well Log Performed
1998-07-17 Perforation Treatment Performed - Jet Perforation
1998-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-23 Well Log Performed
1998-07-25 Perforation Treatment Performed - Cement Squeeze
1998-07-27 Well Log Performed
1998-07-28 Perforation Treatment Performed - Jet Perforation
1998-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-01 Well Log Performed
2006-07-16 Perforation Treatment Performed - Jet Perforation
2009-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-14 Well Log Performed
2011-08-13 Perforation Treatment Performed - Cement Squeeze
2011-08-19 Well Log Performed
2011-08-20 Well Log Performed
2011-08-21 Perforation Treatment Performed - Jet Perforation
2011-08-21 Well Log Performed
2011-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-23 Well Log Performed
2011-08-25 Well Log Performed
2011-08-26 Perforation Treatment Performed - Jet Perforation
2011-08-26 Well Log Performed
2011-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-28 Perforation Treatment Performed - Remedial Casing
2011-08-29 Perforation Treatment Performed - Jet Perforation
2011-08-29 Well Log Performed
2011-09-03 Well Log Performed
2011-09-04 Perforation Treatment Performed - Remedial Casing
2011-09-11 Production Casing Operation Performed
2011-09-23 Well Log Performed
2012-03-05 Well Began Injection
2012-03-05 Well Fluid changed to Water
2012-03-05 Well Type changed to Injection
2012-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-16 Bullet Perforation 1837.50 1839.50 7
1992-01-07 Perforation 1806.00 1809.00 13
1992-01-09 Acid Treatment 1806.00 1809.00 0
1998-07-11 Cement Squeeze 1837.50 1839.50 0
1998-07-11 Cement Squeeze 1827.90 1830.60 0
1998-07-11 Cement Squeeze 1812.00 1815.00 0
1998-07-11 Cement Squeeze 1806.00 1809.00 0
1998-07-11 Cement Squeeze 1801.40 1802.90 0
1998-07-11 Cement Squeeze 1797.50 1800.50 0
1998-07-17 Perforation 1841.00 1843.00 13
1998-07-17 Perforation 1834.00 1836.00 13
1965-11-19 Acid Wash 1837.50 1839.50 0
1998-07-17 Perforation 1829.00 1830.50 13
1998-07-17 Perforation 1823.00 1825.00 13
1998-07-17 Perforation 1814.00 1817.00 13
1998-07-17 Perforation 1801.00 1803.00 13
1998-07-18 Acid Treatment 1841.00 1843.00 0
1998-07-18 Acid Treatment 1834.00 1836.00 0
1998-07-19 Acid Treatment 1829.00 1830.50 0
1998-07-19 Acid Treatment 1823.00 1825.00 0
1998-07-19 Acid Treatment 1814.00 1817.00 0
1998-07-20 Acid Treatment 1801.00 1803.00 0
1965-11-24 Acid Wash 1837.50 1839.50 0
1998-07-20 Acid Treatment 1841.00 1843.00 0
1998-07-22 Acid Treatment 1841.00 1843.00 0
1998-07-25 Cement Squeeze 1829.00 1830.50 0
1998-07-25 Cement Squeeze 1823.00 1825.00 0
1998-07-28 Perforation 1841.00 1843.50 13
1998-07-28 Perforation 1834.00 1836.00 13
1998-07-28 Perforation 1829.50 1830.50 13
1998-07-28 Perforation 1823.00 1824.50 13
1998-07-29 Acid Treatment 1841.00 1843.50 0
1998-07-30 Acid Treatment 1834.00 1836.00 0
1965-11-25 Acid Wash 1837.50 1839.50 0
1998-07-30 Acid Treatment 1829.50 1830.50 0
1998-07-30 Acid Treatment 1823.00 1824.50 0
1998-07-31 Acid Treatment 1814.00 1817.00 0
1998-07-31 Acid Treatment 1801.00 1803.00 0
2006-07-16 Perforation 1847.00 1850.00 20
2006-07-16 Perforation 1844.50 1845.50 20
2009-10-22 Acid Treatment 1847.00 1850.00 0
2009-10-22 Acid Treatment 1844.00 1845.50 0
2009-10-22 Acid Treatment 1841.00 1843.00 0
2011-08-13 Cement Squeeze 1847.00 1850.00 0
1969-12-19 Perforation 1827.90 1830.60 7
2011-08-13 Cement Squeeze 1844.50 1845.50 0
2011-08-13 Cement Squeeze 1841.00 1843.00 0
2011-08-13 Cement Squeeze 1834.00 1836.00 0
2011-08-13 Cement Squeeze 1829.00 1830.50 0
2011-08-13 Cement Squeeze 1823.00 1825.00 0
2011-08-13 Cement Squeeze 1814.00 1817.00 0
2011-08-13 Cement Squeeze 1801.00 1803.00 0
2011-08-21 Perforation 1942.00 1948.00 13
2011-08-21 Perforation 1936.00 1942.00 13
2011-08-21 Perforation 1930.00 1936.00 13
1969-12-20 Acid Wash 1827.90 1830.60 0
2011-08-22 Acid Treatment 1942.00 1948.00 0
2011-08-22 Acid Treatment 1936.00 1942.00 0
2011-08-22 Acid Treatment 1930.00 1936.00 0
2011-08-26 Perforation 669.00 670.00 17
2011-08-27 Acid Treatment 669.00 670.00 0
2011-08-28 Remedial Casing Cementing 669.00 670.00 0
2011-08-29 Perforation 401.00 402.00 17
2011-09-04 Remedial Casing Cementing 401.00 402.00 0
2012-10-18 Acid Treatment 1930.00 1948.00 0
1982-12-09 Perforation 1801.40 1802.90 13
1982-12-10 Perforation 1797.50 1800.50 13
1992-01-04 Perforation 1812.00 1815.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References