If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635111904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.459629,"lon":-115.661815,"icon":""}]} |
Location: 00/04-19-063-11W5/0 | |
Location Alias: 00/04-19-63-11 W5M | |
Location Alias 2: 00/04-19-063-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 11 | |
Section: 19 | |
County/Municipality: Woodlands County | |
Well Name: ACCEL JUDYCK 4-19-63-11 | |
Operator Name: ACCEL Energy Canada Limited | |
License Number: 0019455 | |
License Date: 1960-07-28 | |
License Status: Suspension | |
Spud Date: 1960-08-02 | |
Final Drill Date: 1960-10-10 | |
Well Total Depth: 2762.10 m | |
Surface Hole Latitude: 54.459629 | |
Surface Hole Longitude: -115.661815 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-07-28 | Obtained License |
1960-10-10 | Finished Drilling |
1960-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-10-10 | Perforation Treatment Performed - Jet Perforation |
1960-10-10 | Production Casing Operation Performed |
1960-10-10 | Well Mode changed to Drilled and Cased |
1960-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1960-10-12 | Perforation Treatment Performed - Jet Perforation |
1960-10-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1960-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-10-21 | Perforation Treatment Performed - Jet Perforation |
1960-10-30 | Well Began Production |
1960-10-30 | Well Fluid changed to Crude Oil |
1960-10-30 | Well Mode changed to Flowing |
1977-02-05 | Perforation Treatment Performed - Jet Perforation |
1977-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-04-07 | Well Fluid changed to Crude Oil |
1979-04-07 | Well Mode changed to Gas Lift |
1979-04-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-09-19 | Perforation Treatment Performed - Jet Perforation |
1981-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-01 | Well Fluid changed to Crude Oil |
1982-06-01 | Well Mode changed to Suspended |
1996-09-03 | Perforation Treatment Performed - Cement Squeeze |
1996-09-07 | Perforation Treatment Performed - Jet Perforation |
1996-09-07 | Well Log Performed |
1996-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-11 | Perforation Treatment Performed - Cement Squeeze |
1996-09-11 | Well Log Performed |
1996-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-22 | Perforation Treatment Performed - Jet Perforation |
1996-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-28 | Plug Back Performed |
1996-09-28 | Well Fluid changed to Crude Oil |
1996-09-28 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-10-10 | Perforation | 2683.20 | 2686.20 | 3 |
1960-10-10 | Acid Treatment | 2683.20 | 2686.20 | 0 |
1960-10-12 | Packing Device Capped w/Cement | 2680.40 | 2680.40 | 0 |
1960-10-12 | Perforation | 2673.40 | 2674.90 | 3 |
1960-10-12 | Perforation | 2675.20 | 2676.80 | 3 |
1960-10-14 | Acid Treatment | 2673.40 | 2676.80 | 0 |
1960-10-20 | Packing Device Capped w/Cement | 2664.00 | 2664.00 | 0 |
1960-10-21 | Perforation | 2639.90 | 2644.40 | 3 |
1960-10-21 | Acid Treatment | 2639.90 | 2644.40 | 0 |
1977-02-05 | Perforation | 2635.30 | 2639.60 | 3 |
1977-02-05 | Perforation | 2646.30 | 2650.80 | 3 |
1977-02-05 | Perforation | 2657.90 | 2658.80 | 3 |
1977-02-09 | Acid Treatment | 2635.30 | 2658.80 | 0 |
1979-04-14 | Acid Treatment | 2635.30 | 2658.80 | 0 |
1981-09-19 | Packing Device Capped w/Cement | 2671.50 | 2671.50 | 0 |
1981-09-19 | Perforation | 2654.20 | 2656.00 | 7 |
1981-09-19 | Perforation | 2657.90 | 2658.80 | 7 |
1981-09-19 | Perforation | 2662.10 | 2663.60 | 7 |
1981-09-19 | Perforation | 2664.90 | 2666.70 | 7 |
1981-09-21 | Acid Treatment | 2654.20 | 2666.70 | 0 |
1996-09-03 | Cement Squeeze | 2635.30 | 2644.40 | 0 |
1996-09-07 | Perforation | 2646.20 | 2651.10 | 7 |
1996-09-07 | Perforation | 2653.00 | 2656.00 | 13 |
1996-09-07 | Perforation | 2657.80 | 2659.10 | 13 |
1996-09-07 | Perforation | 2662.10 | 2663.60 | 13 |
1996-09-07 | Perforation | 2665.20 | 2666.70 | 13 |
1996-09-09 | Acid Treatment | 2646.20 | 2666.70 | 0 |
1996-09-11 | Cement Squeeze | 2635.30 | 2644.40 | 0 |
1996-09-16 | Acid Treatment | 2646.20 | 2666.70 | 0 |
1996-09-19 | Acid Treatment | 2646.20 | 2666.70 | 0 |
1996-09-22 | Perforation | 2640.80 | 2644.40 | 13 |
1996-09-23 | Acid Treatment | 2640.80 | 2644.40 | 0 |
1996-09-28 | Packing Device Capped w/Cement | 2051.00 | 2624.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 7838 | 0.0 | 0.0 | 0.0 |
1968 | 7984 | 0.0 | 0.0 | 0.0 |
1969 | 6579 | 0.0 | 0.0 | 0.0 |
1970 | 8101 | 0.0 | 0.0 | 0.0 |
1971 | 7622 | 0.0 | 0.0 | 0.0 |
1972 | 7332 | 0.0 | 0.0 | 0.0 |
1973 | 6966 | 0.0 | 0.0 | 0.0 |
1974 | 4834 | 0.0 | 0.0 | 0.0 |
1979 | 1802 | 0.0 | 0.0 | 0.0 |
1981 | 1052 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]