X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-23440

Well Details

Well ID: 37-015-23440
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Troy Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 155406
Farm/Lease Name: BROADLEAF HOLDINGS (01-115-06) 6H
License Status: Active
Spud Date: 2018-12-18
Permit Date: 2018-08-30
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.821817
Longitude: -76.789650

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 REPSOL OIL & GAS USA LLC Drill Cuttings (in Tons) RWC 810 28.77 Tons LANDFILL 8-0728-0004/013

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2791342 Primary Facility 2018-10-18 Preoperation Inspection No Violations Noted This inspection fulfills Oil & Gas Act 3258 (a.1) Pre-operation Inspections.

I spoke with Jeff Watts (JL Watts) and Tyrell Wheeler (Repsol) on site. They explained that the heavy equipment (e.g. bulldozers) constructing the pad utilize GPS systems to guide their operators. JLP

2816801 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted At time of inspection, crew were spudding/setting conductor pipe.
2825700 Primary Facility 2019-01-11 Routine/Partial Inspection No Violations Noted Repsol spudded 4 Marcellus wells (photo 1) here in December, 2018. JLP
2851322 Primary Facility 2019-03-11 Drilling/Alteration No Violations Noted At time of inspection, crew was still moving onto well pad and setting up rig.

Will return at a later date when drilling operations begin to perform a complete inspection.

2853937 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted I spoke with Terry Anderson (Repsol) on site. He said they'll be drilling the 4 Marcellus wells on this pad for about 2 more months.

I used an Oakton PCSTestr 35 to get electrical conductivity readings from pooled water on site. A puddle on the secondary containment liner returned 0.23 mS/cm, a puddle in the rock lined ditch near access road returned 0.34 mS/cm. JLP

For data sources see[6]

References