X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-151-25865

Well Details

Well ID: 34-151-25865
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Washington Township
Operator Name: C & T ENERGY OF EAST CANTON IN
Well Pad ID:
Farm/Lease Name: WALKER
License Status: Producing
License Date: 2014-05-28
Spud Date: 2014-06-19
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2014-06-24
Well Total Depth: 5543 ft
Configuration: Vertical
Latitude: 40.815489770
Longitude: -81.12232431

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-05-28 Proposed Formations:CLINTON, Issued Date:5/28/2014, Expired Date:5/27/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-06-24
Completion Report Received 2014-09-04
Construction Permit Expires 2016-05-27
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-09-09 5356 5441 57

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-07-14 H2O 8 110015 Gal 77500 OTHER 57 Shots

Nabors Completion Services

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 C & T ENERGY OF EAST CANTON IN 1114 766 161
2015 C & T ENERGY OF EAST CANTON IN 5677 1201 365
2016 C & T ENERGY OF EAST CANTON IN 3082 526 365
2017 C & T ENERGY OF EAST CANTON IN 1881 517 365
2018 C & T ENERGY OF EAST CANTON IN 2175 516 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 C & T ENERGY OF EAST CANTON IN Brine 4205 161
2015 C & T ENERGY OF EAST CANTON IN Brine 770 365
2016 C & T ENERGY OF EAST CANTON IN Brine 350 365
2017 C & T ENERGY OF EAST CANTON IN Brine 280 365
2018 C & T ENERGY OF EAST CANTON IN Brine 280 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0219178133 2014-06-20 Casing String Witnessed No Violations I was on location to witness the cementing of the surface casing. A 14.75 diameter hole was drilled to 705 by Advent Drilling, and the 11.75 OD, 42 lb/ft limited service casing was installed to 689. Two centralizers were installed on the casing string. The casing had to be worked up and down several times before being run to bottom due to a ledge present in the hole. Petroset Cementing Services pumped 370sks of cement (Class A, with 3% CaCl) and was displaced the cement with 80.5 bbls of fresh water. There were full returns during the entire job and 19 bbls of cement were returned to surface. The rig will wait on cement for eight hours before beginning to drill the 7 7-8 diameter production hole.
1167011277 2014-06-19 Drill / Deepen / Reopen No Violations I was on location to check the status of Advent Drilling preparing to spud the well. They are currently drilling the mouse hole for the well and expect to spud the well later this afternoon. The location is located in a low spot of a cornfield and has a large quantity of water and mud on location. There is no erosion or runoff leaving location. There are no violations at this time.
1398818660 2014-06-24 Casing String Witnessed No Violations I was on location to witness the cementing of the production casing. A 7.825 diameter hole was drilled to 5533, and new 4.5 OD, 11.6 lb/ft Limited Service casing was installed to 5524. During the initial attempt to cement the casing, the latch down plug did not launch from the cement head. The decision was made to circulate the cement out of the hole and bring in another load of cement to re-pump the cement job. Petroset Cementing reset the plug in the head and another bulk truck was brought onto location. 200sks of cement (Class A, 2% CaCl) were pumped and displaced with 86bbls of fresh water. The latch down plug bumped the latching baffle, and the casing was pressured to 1500psi and held for 5 minutes. The pressure held and the cementers were released. Advent drilling will be moving to a location in Mahoning County.

For data sources see[9]

References