If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-22434 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.565706405,"lon":-81.01256288,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Jackson Township | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: TUEL RICHARD & GORDON | |
License Status: Producing | |
License Date: 1981-06-18 | |
Spud Date: 1981-05-31 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-06-05 | |
Well Total Depth: 6117 ft | |
Configuration: Vertical | |
Latitude: 39.565706405 | |
Longitude: -81.01256288 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1981-05-31 | |
Completed | 1981-06-05 | |
Reached Total Depth | 1981-06-05 | |
Completion Report Received | 1981-07-27 | |
CO | 1986-08-12 | 2513 PIONEER OPERATING CO INC |
CO | 1993-07-23 | 4540 PEOPLES PETROLEUM CORP. GeoDate |
Change of Owner | 2009-11-10 | Operator changed from 4540, PEOPLES PETROLEUM CORP. to 1888, BECK ENERGY CORP |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5731 | 5940 | 29 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 220 Bbl | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0531545108 | 2010-10-13 | Preliminary Restoration | No Violations | FOLLOW UP TO NOV # 2063410588 On day of inspection Stonerock and I were at site. There is erosion starting across site and there is no vegetation established. Around tank at site there is no vegetation. |
1141687411 | 2010-10-13 | Preliminary Restoration | No Violations | FOLLOW UP TO NOV # 1728290398 FOLLOW UP TO NOV # 2063410588 On day of inspection Stonerock and I were at site. There is erosion starting across site and there is no vegetation established. Around tank at site there is no vegetation. |
1177188197 | 2010-05-20 | Work Over Reconditioning | No Violations | On the day of my inspection first stage frac was completed.Acoording to Rob Armstrong at 5649 was the bottom perfs.The second stage will have 35 shots at 4670.I stayed for the flow back on the site. There were two 500bbl tanks down at the bottom. That is where I stayed and watched flowback.There was a creek running through the site.Carper well services hauled the flow back with a 140bbl tanker truck.Hauled two loads through out the night.At 4:00am on the 21st.the third load was being hauled.There was 2.5 loads in the 500 bbl tanks. |
1259989576 | 2009-11-13 | Production Wells | No Violations | Norm Beaver just sold well to Beck Energy and Rob Armstrong was running rods in the well.There will be a new pumpjack installed.The well is supplied with 8 5/8 cas, 4.5 cas.No violations on the day of inspection. |
1386710577 | 2013-12-10 | Production Wells | No Violations | Compliance notice # 1728290398 & 2063410588. On this day I spoke with Becky Sims in reguards to the past violations and She informed me there was ample vegetation and erosion control in place and She would double check with the pumper, I told Her I would inspect the site when there was not snow on the ground. |
1389196840 | 2014-01-08 | Preliminary Restoration | No Violations | Compliance notice # 1728290398 & 2063410588 follow up inspection found the well site meets 1509.072 with proper vegetation established and no erosion issues observed. Inspection of the well head found the well still producing off the 4.5 frack valve with a 2 sales line hooked up, at the tank battery a 100 barrel tank is present along with a mechanical separator and gas sales meter with a current sales chart and proper well identification posted all located in an established dike area. |
1728290398 | 2010-10-13 | Preliminary Restoration | No Violations | FOLLOW UP TO NOV # 2063410588 On day of inspection Stonerock and I were at site. There is erosion starting across site and there is no vegetation established. Around tank at site there is no vegetation. |
2063410588 | 2010-10-13 | Preliminary Restoration | Violations Noted | On day of inspection Stonerock and I were at site. There is erosion starting across site and there is no vegetation established. Around tank at site there is no vegetation. |
2123583701 | 2010-07-22 | Production Wells | No Violations | On day of inspection well is supplied with 8 5/8 cas,4.5cas and a frac valve in line. There is a 100bbl tank. Dike and id are inplace.There will be a company come in to seed and mulch site. Well was just fractured about a month ago. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
2063410588 | US-OH-121030 | 2010-10-19 | Failure to restore within six months |
For data sources see[9]