37-049-25370

Well Details

Well ID: 37-049-25370
Loading map...
Operator Name: LAKE ERIE ENERGY PART LLC
First Permit Date: 2010-09-23
Last Permit Date: 2010-09-23
Spud Date: None
Unconventional: No
Horizontal: No
Violations: None
Latitude: 42.242391
Longitude: -79.809527

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1941721 2011-01-10 No Violations Noted Upon inspection today I found this new well pad site to be located right on the south edge of Woodmere Road and stabilzed with rock. The top soil has been piled along the edge of the site as per the E&S plan. The slit fence has been installed as per the E&S Plan. The Site ID Tag and E&S Plan where both on-site. No violations found
1953779 2011-02-28 No Violations Noted The purpose of my inspection today was to determine if the E&S controls are functioning as designed during this time of heavy snow melt and rain. Upon inspection I found the entire site has been covered with stone; the slit fence was intatc and filtering as required.. The E&S Plan and Well Site ID tag where also on -site. The pits have not been constructed yet.

No violations.

1954371 2011-03-03 No Violations Noted Today Jon Scott and I inspected this site to determine if the E&S controls have been functioning as designed to prevent sediment laden runoff from leaving the newly constructed well pad site during the time of heavy snow melt and rain occurring recently. Upon inspection we found the slit fence was intact and filtering as required. The site did receive run-off from vineyard area to the south ; this runoff picked up sediment on the site and carried it around the west side of the site and into the slit fence where it was contained. The access area and site have been covered with a rock base; the pits have not been constructed. We also the found the required E&S Plan and the Well Site ID tag. No violations.
2052902 2012-03-14 No Violations Noted
2084367 2012-07-12 No Violations Noted